Boundary Road Overline Bridge, Mortdale Sample Clauses

Boundary Road Overline Bridge, Mortdale. The Illawarra line links Sydney Central to Nowra an d Port Kembla. The Rail Infrastructure Manager is RailCorp. Boundary Road Mortdale is categorised as a regional road (number 7006). It links Waratah Street with Hurstville Road over this bridg e. Hurstville and Kogarah Council are the Roads Authorities for Boundary Road. The railway Overline bridge of Boundary Road Mortda le is constructed of brick arch supported on rock abutments. It has a T66 load xxxx xx and has 1 span of 14.5 m. The bridge width is 6.78 m clearance height is approxim ately 7.0 m. Boundary Road Overline Bridge is owned by RailCorp and is situated on RailCorp owned land. It is within the Illawarra line rail c orridor in Hurstville and Kogarah LGA s; the south side belongs to Kogarah council and the n xxxx side belong to Hurstville council. (See Google map). Boundary Road Overline Bridge was constructed in 19 05. RailCorp Bridge Equipment number is 111812. The grade separated crossing of this bridge is loca xxx at 17.689 km from Sydney by rail, and by Global Positioning System at 33.975793 S, 151.078479 E. Google Map shows Boundary Road Overline Bridge at M ortdale. Note rail corridor marked with red lines and under the bridge with blu e lines. RAIL - ROAD BOUNDARIES The Overline bridge interface boundaries are locate d along the outermost edges of the bridge deck and divided into top and bottom strata. (See Google map and photo 2). Draft SIA Hurstville ts RAILCORP S RAIL INFRASTRUCTURE Civil RailCorp owns inspects and maintains civil faciliti es on the rail side of the boundaries, including: Electrical • Structural Components of the bridge (See Photos 1 4). • Two railway tracks (See photos 3 & 4). • Drainage facilities of the rail corridor. • Fencing and gates of the rail corridor (See photos 1 & 2). • Bridge fencing on both sides (See photos 1 - 4). • Crash barriers along pedestrian walk way on the br idge (See photos 1, 2 & 4). RailCorp owns and maintains the electrical system t hat interfaces with the bridge as follows: • 1,500 volt overhead wiring (OHW) (See photo 3 and 4).
AutoNDA by SimpleDocs

Related to Boundary Road Overline Bridge, Mortdale

  • Crossing Picket Lines The Company will not expect an employee to cross a picket line, including a picket line at a customer site, if to do so would place the employee's life, limb or personal property in jeopardy.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

  • PRINCIPAL BUILDING AGREEMENT DEFINITIONS Definitions and interpretation (Clause 1). 1 F: ……….… V: ….……… T: ….……... Item

  • DS3 Loop DS3 Loop is a two-point digital transmission path which provides for simultaneous two-way transmission of serial, bipolar, return-to-zero isochronous digital electrical signals at a transmission rate of 44.736 megabits per second (Mbps) that is dedicated to the use of the ordering CLEC in its provisioning of local exchange and associated exchange access services. It may provide transport for twenty-eight (28) DS1 channels, each of which provides the digital equivalent of twenty-four (24) analog voice grade channels. The interface to unbundled dedicated DS3 transport is a metallic-based electrical interface.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Scaling Location Forest Service shall provide Scaling services at the Scaling site(s) shown in A10. The Scaling site(s) shown in A10 normally will be a non-exclusive site where more than one National Forest timber sale Purchaser may be served. Purchaser may request, in writing, an alternate Scal- ing site, such as at a private mill yard, private truck ramp, or a privately operated log transfer facility. Contracting Of- ficer may approve an alternate Scaling site, when Con- tracting Officer determines that Scaling conditions at an alternate site are acceptable. Such conditions shall in- clude at a minimum:

  • STRS PICK-UP A. The Board shall pick-up contributions to the State Teachers’ Retirement System paid on behalf of the employees in the bargaining unit utilizing the salary reduction method under the following terms and conditions:

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

Time is Money Join Law Insider Premium to draft better contracts faster.