Bridge Deck definition
Examples of Bridge Deck in a sentence
C 60 Days 30 Days 5 Days Bridge Deck Maintain bridge deck at acceptable condition and level of safety for traveling public.
Drawing A3.01, Bridge and Tower Elevations; Drawing A4.01, Bridge Extension and Tower Sections; Drawing S-5, Bridge Deck Level Framing Plan; Drawing S-6, Roof Framing Plan; Drawing No. A5.04, Bridge Details; Drawing C-2, Project Information Agency shall obtain, and shall require any consultant or contractor entering Commission’s property on its behalf to obtain insurance of the types and in the amounts described below and satisfactory to Commission.
County of Fresno Bridge Deck Repairs BPMP, Fresno County, CA: Principal-in-Charge for an initial City-wide Bridge Strategic Plan (HBP), City of Industry, CA: Principal-in-Charge for the development of a strategic plan for funding, rehabilitating, widening and/or replacing all City-owned bridges that are eligible for Highway Bridge Rehabilitation and Replacement (HBP) federal funds.
Removing Asphaltic Plug Joint material, including metal plate, removal of loose material in deck joints, and removal of sealant up the curbline will not be measured for payment, but the cost will be included in the price detailed on Exhibit B, Price Schedule, for "Clean and Scrape Milled Bridge Deck" or "Removal of Wearing Surface".
Percent of Bridge Deck Area Rated Structurally Deficient (NHS and non- NHS) Percent of bridge deck area that is rated deficient on the NHS and non-NHS, do not include functionally obsolete.
The third bid item under Section 6-02.5 is supplemented with the following: All costs in connection with *** Bridge Deck, Bearings, Girders, Diaphragms, Transverse Stop Bearings, Traffic Barrier, Expansion Joints and other items as listed above and minor items as described below *** shall be included in the lump sum contract price for “Superstructure - McDonald Creek Bridge”.
Item 3076 Dense-Graded Hot Mix Asphalt Item 6001 Portable Changeable Message Sign Item 6185 Truck Mounted Attenuator (TMA) and Trailer Attenuator (TA) Item 9000 Concrete Bridge Deck and Pavement Saw Grooving General: The above-listed specification items are those under which payment is to be made.
The Engineer shall attend and conduct the pre-construction meeting and any meetings required by the State to discuss specifications and action plans with regards to the pertinent bid items (i.e. Weekly Project Progress Meetings, Pre-Pour Bridge Deck meeting, Pre-Paving meetings, etc.).
Provide a 3-inch radius corner at the outboard bulkhead at Frame 52 on the Bridge Deck as indicated on Reference (1Z).
The pre-amplifier is connected at the input to the public address system amplifier located in the “music entertainment room” on the Bridge Deck of each boat in order to accommodate the lower level signal produced by the new microphone.