traffic control centre definition

traffic control centre means an area of land declared under section 8 to be the traffic control centre;
traffic control centre means an area of land declared under section 8 to be the traffic control centre;s. 3
traffic control centre means the center responsible for the control operations of the railway traffic including maintenance works to ensure safety and fulfilment of agreed timetables; that is organized by the National Safety Authority (DNTF).

Related to traffic control centre

  • Control Centre means the central facility of the Cycle Sharing System used mainly for service monitoring, operations control, and customer service. It is the location for collecting, storing, consolidating, processing the information obtained from various elements of the Cycle Sharing System as well as from users, agents, employees, and service providers.

  • Traffic control signal means a device, whether manually, electrically, or mechanically operated, by which traffic is alternately directed to stop and permitted to proceed.

  • Traffic control device means a flagger, sign, signal, marking, or other device used to regulate, warn or guide traffic, placed on, over, or adjacent to a street, highway, private road open to public travel, pedestrian facility, or shared-use path by authority of a public agency or official having jurisdiction, or, in the case of a private road open to public travel, by authority of the private owner or private official having jurisdiction.

  • air traffic control unit means a generic term meaning variously, area control centre, approach control unit or aerodrome control tower;

  • air traffic control service means a service provided for the purpose of:

  • Official traffic-control devices means all signs, signals, markings, and devices not inconsistent with this chapter placed or erected by authority of a public body or official having jurisdiction, for the purpose of regulating, warning, or guiding traffic.

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Data Centre or "DC" means the primary centre where data, software, computer systems and associated components, such as telecommunication and storage systems, redundant or backup power supplies, redundant data communications, environment controls and security devices are housed and operated from;

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre G Terminus Building : E&M Works Lump Sum Breakdown G4 : Plumbing and Drainage Lump Sum Item LSG4.4 G4.4 : Cold Water Installation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum *** *** *** ------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG4.4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Office of the Interconnection Control Center means the equipment, facilities and personnel used by the Office of the Interconnection to coordinate and direct the operation of the PJM Region and to administer the PJM Interchange Energy Market, including facilities and equipment used to communicate and coordinate with the Market Participants in connection with transactions in the PJM Interchange Energy Market or the operation of the PJM Region. On-Site Generators:

  • Nodal Ministry means the Ministry or Department identified pursuant to this order in respect of a particular item of goods or services or works.

  • LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Control Area(s) means an electric power system or combination of electric power systems to which a common automatic generation control scheme is applied.

  • Traffic lane or "lane" means that portion of a roadway designed or designated to accommodate the

  • aerodrome control service means air traffic control service for aerodrome traffic;

  • InterLATA Traffic describes Telecommunications between a point located in a Local Access and Transport Area ("LATA") and a point located outside such area.

  • Indigenous Peoples Planning Framework or “IPPF” means the indigenous peoples planning framework for the Investment Program, including any update thereto, agreed between the Borrower and ADB and incorporated by reference in the FFA;

  • New England Control Area or “NECA” is the Control Area for New England as defined in the ISO-NE Tariff.

  • InterMTA Traffic is: (a) traffic originated by a CMRS end user of ALLTEL in an MTA and terminated to an end user of MATC in another MTA; and (b) traffic originated by an end user of MATC in one MTA and terminated to an end user of ALLTEL in another MTA.

  • PJM Control Area means the Control Area recognized by NERC as the PJM Control Area.

  • Area Control Error or “ACE” shall mean the instantaneous difference between a Balancing Authority’s net actual and scheduled interchange, taking into account the effects of Frequency Bias and correction for meter error.

  • IntraLATA Toll Traffic means the IntraLATA traffic, regardless of the transport protocol method, between two locations within one LATA where one of the locations lies outside of the mandatory local calling area as defined by the Commission.

  • Transit Traffic MOUs means all Transit Traffic minutes of use to be billed at the Transit Traffic rate by AT&T-TSP.

  • Control Area means an electric power system or combination of electric power systems bounded by interconnection metering and telemetry to which a common automatic generation control scheme is applied in order to: