Policy Acceptance and Storage System (PASS) definition

Policy Acceptance and Storage System (PASS) means any RMA or FCIC approved electronic data processing (EDP) system that receives and accepts or rejects Company- submitted data for eligible crop insurance contracts.
Policy Acceptance and Storage System (PASS) means any RMA or FCIC approved electronic data processing (EDP) system that receives and accepts or rejects Company submitted data for eligible crop insurance contracts.

Examples of Policy Acceptance and Storage System (PASS) in a sentence

  • As such, the incumbents primary responsibility is to ensure that the electronic data reported thru the Policy Acceptance and Storage System (PASS) complies with the Standard Reinsurance Agreement, actuarial requirements, Federal law, applicable legislation, crop policy provisions and procedural requirements.

  • With this partnership, BBK customers in India will get access to PNB MetLife‟s entire portfolio of products ranging from health, savings, and wealth to rural plans.

  • The response action selected in this ROD is necessary to protect public health, welfare, and the environment from release of hazardous substances to groundwater at Sites 11 and 12.

  • In addition, the Project implementation includes soil and water conservation measures and the three main pollutants (namely waste water, exhaust fumes, and solid waste) due to the construction of the Project are treated during the construction of the Project.

  • The data reported in the Policy Acceptance and Storage System (PASS) records only the dollar amount of the guarantee and the dollar amount of the production to count.

Related to Policy Acceptance and Storage System (PASS)

  • Energy storage system means a system which stores energy and releases it in the same form as was input.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Tourism destination project means a qualified non-gaming

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Design-build team means an entity that consists of:

  • Tube housing assembly means the tube housing with tube installed. It includes high-voltage and/or filament transformers and other appropriate elements when such are contained within the tube housing.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Quality system means documented organizational procedures and policies: internal audits of those policies and procedures: management review and recommendation for quality improvement.”

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Suction outlet means the opening or fitting through which the water under negative pressure is drawn from the pool or spa.

  • Categorical pretreatment standard or "categorical standard" means any regulation containing pollutant discharge limits promulgated by the environmental protection agency in accordance with sections 307(b) and (c) of the Act (33 U.S.C. section 1317) that apply to a specific category of users and that appear in 40 CFR chapter I, subchapter N, parts 405 through 471.

  • Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.