Examples of MS4 operator in a sentence
Where the operational control of the MS4 changes after the submittal of an NOI, a new NOI must be submitted by the new MS4 operator prior to the change.
After the baseline characterization data is collected, the MS4 operator shall evaluate the data in the baseline characterization to determine which identified areas or specific discharge points are in need of additional water quality measures.
The SWQMP-Part B: Baseline Characterization and Report and completed corresponding certification form must be submitted no later than one hundred eighty (180) days from the date the initial NOI letter submittal was received by the department or the expiration date of the previous five (5) year permit term.(c) The department shall review the SWQMP-Part B: Baseline Characterization and Report for adequacy, and a written NOS letter or NOD letter shall be issued to the MS4 operator.
Permittees who discharge storm water to a municipal separate storm sewer system (MS4) shall also provide a copy of the SWP3 to the operator of that MS4 upon receiving a request from the MS4 operator.
While this measure is meant primarily to improve or protect receiving water quality by altering municipal activities, facility operations and property management, the MS4 operator can also realize cost savings from such things as spill prevention (thus reducing clean-up costs), inventory control, and re- use/recycling of materials.
Operators of facilities that contribute storm water discharges to an MS4 shall provide notice of this inability to certify a portion of the storm sewer system to the MS4 operator upon request from the MS4 operator.
The MS4 operator, at its discretion, may also cover such discharges under the Industrial General Permit for storm water discharges (WYR00-0000).
It is important to keep in mind that the regulated small MS4 operator typically has a great deal of flexibility in choosing exactly how to satisfy the minimum control measure requirements in its NPDES permit.
The MS4 operator shall consider the pollutants likely to be present, the sources of those pollutants, and the sensitivity of the receiving waters when developing the SWMP.
A notice of termination (NOT) must be submitted by the previous MS4 operator within seven days after they are no longer the MS4 operator.