LNG Train 1 definition

LNG Train 1 has the meaning set forth in the Stage 1 EPC Agreement.
LNG Train 1 is a portion of Subproject 1 and has the meaning set forth in Attachment A. LNG Train 1 is the first of the LNG Trains to achieve Substantial Completion.
LNG Train 1 has the meaning set forth in this Agreement and Attachment A. LNG Train 1 is the first of the LNG Trains to achieve Substantial Completion under this Agreement.

Examples of LNG Train 1 in a sentence

  • The Natural Gas flowing into each LNG Train is to be measured by flow meter 11 FQI-11003 for LNG Train 1, and flow meter 12 FQI-11003 for LNG Train 2.

  • For single train LNG projects this is especially critical, which helped in the decision process for Atlantic LNG Train 1 to adopt a “two-trains-in-one” approach.

  • These owners find that the additional expense of a second parallel FEED may be justified if the end result is a much lower cost with a shorter schedule project, as demonstrated by the Atlantic LNG Train 1 project owners in 1995.

  • Creating and building near-term value growth• Final commissioning of the Wheatstone LNG Train 1 is well advanced and nearing completion.• NWS Project participants agreed a tolling proposal and have commenced discussions with third party resource owners for processing gas through the Karratha Gas Plant.• Persephone ready for start-up is targeted for August 2017, with the project expected to be delivered 30% under budget and six months ahead of schedule.

  • Fields are currently operating below their full production capacity as wells are being turned down to meet domestic demand without jeopardising the capacity build required for Downstream LNG Train 1.

  • The increase is primarily due to the:— recognition in Underlying Profit of interest at a higher interest rate (primarily driven by hybrid debt) on debt used to fund Origin’s investment related to Australia Pacific LNG Train 1 and infrastructure assets from 1 March 2016; and— repayment of drawn bank debt from the proceeds from debt reduction actions.

  • As part of implementation of RKL-RPL Tangguh Integrated AMDAL which was approved in 2002 for Tangguh LNG Train 1 and 2 operation activity, the environmental monitoring has been routinely conducted.

  • Financing for Atlantic LNG Train 1 and Egyptian LNG Train 1 was among the highest required for their respective areas of the world.

  • LNG and condensate is exported, and domestic gas is transported via the Dampier-Bunbury Natural Gas Pipeline.Production commenced from LNG Train 1 in 2017 and LNG Train 2 in 2018.

  • The LNG Train 1 Licence application currently being processed by DWER is to be included into the Wheatstone LNG Trains 1 and 2 licence.

Related to LNG Train 1

  • Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.

  • Double Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in two or more distinct phases that requires the product container be shaken before use to mix the phases, producing an emulsion.

  • Reid vapor pressure means the vapor pressure of crude oil or other volatile petroleum products at 100 degrees Fahrenheit as determined by the latest edition of ASTM D6377 (RVPE): Standard Test Method for Determination of Vapor Pressure of Crude Oil.

  • Camping trailer means every vehicle that has collapsible sides and contains sleeping quarters but

  • Intake means “Sanctioned Intake”.

  • Fixed wing turbine powered aircraft means an aircraft that:

  • Electrical Distance means, for a Generation Capacity Resource geographically located outside the metered boundaries of the PJM Region, the measure of distance, based on impedance and in accordance with the PJM Manuals, from the Generation Capacity Resource to the PJM Region.

  • Rig means, collectively, offshore drilling rigs, including, semisubmersibles, drillships, xxxx-ups, semisubmersible tender assist vessels and submersible rigs, owned by the Borrower and/or any Subsidiary of the Borrower, and, individually, any of such rigs.

  • True vapor pressure means the equilibrium partial pressure exerted by a petroleum liquid as determined in accordance with methods described in American Petroleum Institute (API) Bulletin 2517, Evaporation Loss from External Floating Roof Tanks, 1980. The API procedure may not be applicable to some high viscosity or high pour crudes. Available estimates of true vapor pressure may be used in special cases such as these.

  • Busy Line Verification (BLV means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Suction outlet means the opening or fitting through which the water under negative pressure is drawn from the pool or spa.

  • semi-trailer means any trailer designed to be coupled to a motor vehicle in such a way that part of it rests on the motor vehicle and that a substantial part of its mass and the mass of its load is borne by the motor vehicle;

  • Railroad train means a steam engine or an electric or other motor, with or without cars coupled thereto, operated by a railroad.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Customer Specific Training means a private Course organized on demand specifically for Customer.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Flight means any flight demonstration, flight test, taxi test, or other flight made in the performance of this contract, of for the purpose of safeguarding the aircraft, or previously approved in writing by the Contracting Officer.

  • Travel trailer means a vehicle:

  • Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Private Cloud System (PCS) A cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the Requester, a third party, or some combination of them, and it may exist on or off premises.

  • Pressure vessel means containers for the containment of pressure, either internal or external. This pressure may be obtained from an external source or by the application of heat from a direct or indirect source, or any combination thereof.

  • Travel training means providing instruction, as appropriate, to children with significant cognitive disabilities, and any other children with disabilities who require this instruction, to enable them to:

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Cultivation site means a location where cannabis is planted, grown, harvested, dried, cured, graded, or trimmed, or a location where any combination of those activities occurs.