Foot control definition

Foot control means the foot-operated control mechanism designed to be used with a clutch or clutch/brake control system.
Foot control means the foot oper- ated control mechanism designed to be used with a clutch or clutch/brake con- trol system.
Foot control means a foot-operated control mechanism which activates a press.

Examples of Foot control in a sentence

  • Foot control means the foot operated control mechanism designed to be used with a clutch or clutch/brake control system.Foot pedal means the foot operated lever designed to operate the mechanical linkage that trips a full revolution clutch.

  • Capacity building is particularly needed for Energy and AFOLU sectors including data collection, processing, and sharing.Sector-specific training will be undertaken for energy and forest sectors, in line with the identified gap.

  • However, this must be balanced against the demands on the Council’s service for homelessness assistance and the pressures on temporary accommodation.

  • Must include at least 3 handles.- To be supplied with complete recording system on DVD.- High resolution monitor compatible with the camera system and the recording system, of atleast 23‖- Monitor stand should be provided- Remote control and Foot control for camera activation.

  • Place chairs 3-6 feet apart when possible, designate seatingwithareasigns, use barriers if possible,• Provide supplies-tissues, alcohol based hand rub, soap at sink, trash cans ( Foot control trash cans preferable)• Identify which of your patients are at higher risk of adverse outcome from COVID 19• Prevent patients from bringing companions to their appointment, except for instances where the patient requires assistance (e.g., pediatric patients, people with special needs, elderly patients, etc.).

  • Test conditions and procedure- Initial brake temperature: ≥ 55° C and ≤ 100° C- Test speeds: 50 km/h and 100 km/h or 0.8 V max, whichever is lower.- Minimum test speed = 25 km/h- Brake actuation force: Hand control ≤ 250N Foot control ≤ 400N- Number of stops: until the vehicle meets the performance requirements, with a maximum of 6 tests.- Alter Tthe service brake system must be altered to induce a complete loss of braking in any one subsystem.

  • Foot control 4.2.3 Calibration parts (included in scope of supply)‌ 4.2.3.1 3D acquisition system‌Calibration part for calibrating the 3D acquisition system.

  • Irrigation pressure electronically controlled.2. Autoclavable & reusable tubes of medical grade silicon.3. Complete Sterility is maintained.4. Easy loading of the tube in the machine.5. Efficient peristaltic pump.6. Water Resistance Display.7. Foot control operate machine.8. Pre Set features.9. Four types of irrigation possible.

  • Test conditions and procedure- Initial brake temperature: ≥55° C and ≤100° C- Test speeds: 50 km/h and 100 km/h or 0.8 V max, whichever is lower.- Minimum test speed = 25 km/h- Brake actuation force:Hand control ≤ 250N Foot control ≤ 400N - Number of stops: until the vehicle meets the performance requirements, with a maximum of 6 tests.

  • Annex 3 – 1.2.4.2.4 Hand control:  200N Foot control:  350 N (L1,L2,L3,L4) 500 N (L5) Point of application 5 cm from end of lever.


More Definitions of Foot control

Foot control means the water supply is controlled through a mixing valve designed and installed to be operated by the foot.

Related to Foot control

  • Management Control means the possession, directly or indirectly of the power to direct or cause the direction of the management and policies of the Concessionaire, whether through the ownership of voting securities, by contract or otherwise or the power to elect or appoint more than 50% (fifty percent) of the directors, managers, partners or other individuals exercising similar authority with respect to the Concessionaire.

  • Joint Control means a situation where a company has multiple promoters (but none of the shareholders has more than 50% of voting rights and paid up share capital);

  • Quality control means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.

  • New England Control Area or “NECA” is the Control Area for New England as defined in the ISO-NE Tariff.

  • Joint Controllers means where two or more Controllers jointly determine the purposes and means of processing.

  • PJM Control Area means the Control Area recognized by NERC as the PJM Control Area.

  • Joint Controller with the other Party;

  • Data Controller shall have the same meaning as set out in the Data Protection Act 1998;

  • Medical control means a person who provides medical supervision to an emergency medical service provider.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Control Area(s) means an electric power system or combination of electric power systems to which a common automatic generation control scheme is applied.

  • Erosion and sediment control plan means a comprehensive plan developed to address pollution caused by erosion and sedimentation of soil particles or rock fragments during construction.

  • Structural pest control means a use requiring a license under Chapter 14 (commencing with Section 8500), Division 3, of the Business and Professions Code.

  • Interim controls means a set of measures designed to temporarily reduce human exposure or likely exposure to lead-based paint hazards, including specialized cleaning, repairs, maintenance, painting, temporary containment, ongoing monitoring of lead-based paint hazards or potential hazards, and the establishment and operation of management and resident education programs.

  • Site Control means that Seller (a) owns the Site, (b) is the lessee of the Site under a Lease, (c) is the holder of a right-of-way grant or similar instrument with respect to the Site, or (d) is managing partner or other Person authorized to act in all matters relating to the control and Operation of the Site and Generating Facility.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Control Area means an electric power system or combination of electric power systems bounded by interconnection metering and telemetry to which a common automatic generation control scheme is applied in order to:

  • area control service means air traffic control service for controlled flights in control areas;

  • air traffic control service means a service provided for the purpose of:

  • aerodrome control service means air traffic control service for aerodrome traffic;

  • Direct Load Control means load reduction that is controlled directly by the Curtailment Service Provider’s market operations center or its agent, in response to PJM instructions.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Procurement Management means the Director of Lee County’s Procurement Management Department or designee.

  • Services Commencement Date means the date delivery of the Services shall commence as specified in the Key Provisions. If no date is specified in the Key Provisions this date shall be the Commencement Date;

  • Credit Control means all the functions relating to the collection of monies owed by ratepayers and the users of municipal services.

  • Control means the possession, directly or indirectly, of the power to direct or cause the direction of the management or policies of a Person, whether through the ability to exercise voting power, by contract or otherwise. “Controlling” and “Controlled” have meanings correlative thereto.