Farmout Procedure means those portions of the 1997 CAPL Farmout and Royalty Procedure which are adopted by this Agreement, the elections for which are more particularly set forth in Schedule "B" attached hereto.
Farmout Procedure means the CAPL Farmout Procedure – Version 1 which is by this reference adopted and entirely incorporated into and completed or amended by this Agreement.

Examples of Farmout Procedure in a sentence

  • Update existing prospective resource reports on the properties for the new data, engage a 3rd party geology review, review and update feasibility studies.Subject to the Farmout Procedure, the Farmee will earn the following interest in the Farmout Lands: 30% of the Farmor’s Working Interest in the Farmout Lands, On or before November 1, 2014, unless otherwise mutually agreed to, the Farmee shall spend a minimum of 6.5 million dollars toB.

Related to Farmout Procedure

  • Staff Vetting Procedure means the Authority’s procedures for the vetting of personnel and as advised to the Contractor by the Authority.

  • Expedited Deliverability Study means a deliverability study that an eligible Developer may elect to pursue as that term is defined in OATT Section 25 (OATT Attachment S) that may determine the extent to which an existing or proposed facility satisfies the NYISO Deliverability Interconnection Standard at its requested CRIS level without the need for System Deliverability Upgrades. The schedule and scope of the study is defined in Sections 25.5.9.2.1 and 25.7.1.2 of this Attachment S.

  • Exploration Well means a well that is not a development well, a service well or a stratigraphic test well.

  • Shallow well means a well located and constructed in such a manner that there is not a continuous layer of low permeability soil or rock (or equivalent retarding mechanism acceptable to the department) at least 5 feet thick, the top of which is located at least 25 feet below the normal ground surface and above the aquifer from which water is to be drawn.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Dispute Resolution Procedure means the procedure for resolution of Disputes set forth in Article 26;

  • Development Well means a well drilled inside the established limits of an oil or gas reservoir, or in close proximity to the edge of the reservoir, to the depth of a stratigraphic horizon known to be productive.

  • service well means a well drilled or completed for the purpose of supporting production in an existing field. Wells in this class are drilled for the following specific purposes: gas injection (natural gas, propane, butane or flue gas), water injection, steam injection, air injection, salt water disposal, water supply for injection, observation or injection for combustion.

  • Procedure means one or more surgical procedures or medical therapy performed in a Center of Excellence.

  • ASX Settlement Operating Rules means the rules of ASX Settlement Pty Ltd which apply while the Company is an issuer of CHESS approved securities;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Complaints Procedure means the School's procedure for handling complaints from parents, as amended from time to time for legal or other substantive reasons, or in order to assist the proper administration of the School. It does not form part of the contract between you and the School. A copy of the most up-to-date procedure is on the School's website and is otherwise available from the School at any time upon request;

  • Rules of Procedure means the rules of procedure adopted by the Fund Council for the management of its own business, as originally adopted on July 16, 2010 and amended from time to time.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Written Procedure means the written or electronic procedure for decision making among the Bondholders in accordance with Clause 18 (Written Procedure).

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Exploratory Well means a well that is not a development well, a service well or a stratigraphic test well.

  • Standard operating procedure means a formal written procedure offi- cially adopted by the plant owner or operator and available on a routine basis to those persons responsible for carrying out the procedure.

  • Project Description means the document that describes the Project's Reduction activities and that uses either the VCS Project Description Template or the project description template specified by the relevant Approved GHG Program;

  • Oil well means any well capable of producing oil or oil and casinghead gas from a common source of supply as determined by the commission.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Optional Interconnection Study Agreement means the form of agreement for preparation of an Optional Interconnection Study, as set forth in Tariff, Attachment N-3. Part I:

  • Claims Procedure Order means the Order under the CCAA establishing a claims procedure in respect of the Applicant, as same may be further amended, restated or varied from time to time.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Horizontal well means a well bore drilled laterally at an angle of at least eighty (80) degrees to the vertical or with a horizontal projection exceeding one hundred (100) feet measured from the initial point of penetration into the productive formation through the terminus of the lateral in the same common source of supply.