Estimated Cost of Redevelopment Project definition

Estimated Cost of Redevelopment Project means the estimated cost for Redevelopment Project as provided in the DPR;
Estimated Cost of Redevelopment Project means the estimated cost for Redevelopment Project as provided in the Bid Document;

Examples of Estimated Cost of Redevelopment Project in a sentence

  • The Estimated Cost of Station Development Project, Estimated Cost of Redevelopment Project and Estimated Cost of Commercial Development Project has been specified in the finalised DPR.

  • Subsection 3.11 SOURCES OF REVENUE The costs outlined in Section 3.9 above under the Estimated Cost of Redevelopment Project will be financed through the annual collection of tax increments as described below.

Related to Estimated Cost of Redevelopment Project

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Redevelopment project means a specific construction project

  • Building Operating Expenses means the portion of “Operating Expenses,” as that term is defined in Section 4.2.7 below, allocated to the tenants of the Building pursuant to the terms of Section 4.3.1 below.

  • Improvement district means a local district that operates under and is subject to the provisions of this chapter and Chapter 2a, Part 4, Improvement District Act, including an entity that was created and operated as a county improvement district under the law in effect before April 30, 2007.

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Common Area Operating Expenses are defined, for purposes of this Lease, as all costs incurred by Lessor relating to the ownership and operation of the Industrial Center, including, but not limited to, the following:

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Operating Expenses is defined to include all expenses necessary or appropriate for the operation of the Fund (or Class, as applicable), including the Advisor’s investment advisory or management fee detailed in the Investment Advisory Agreement and any Rule 12b-1 fees and other expenses described in the Investment Advisory Agreement, but does not include taxes, leverage interest, brokerage commissions, dividend and interest expenses on short sales, acquired fund fees and expenses (as determined in accordance with SEC Form N-1A), expenses incurred in connection with any merger or reorganization, or extraordinary expenses such as litigation expenses.

  • Project Expenses means usual and customary operating and financial costs. The term does not include extraordinary capital expenses, development fees and other non-operating expenses.

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Development Project means a project for the development of land within a

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Operating Expense means salaries, wages, cost of maintenance and operation, materials, supplies, insurance, and all other items normally included under recognized accounting practices, but does not include allowances for depreciation in the value of physical property.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Total Operating Expenses means all costs and expenses paid or incurred by the Company, as determined under generally accepted accounting principles, that are in any way related to the operation of the Company or to Company business, including advisory fees, but excluding (i) the expenses of raising capital such as Organization and Offering Expenses, legal, audit, accounting, underwriting, brokerage, listing, registration, and other fees, printing and other such expenses and tax incurred in connection with the issuance, distribution, transfer, registration and Listing of the Shares, (ii) interest payments, (iii) taxes, (iv) non-cash expenditures such as depreciation, amortization and bad debt reserves, (v) incentive fees paid in compliance with the NASAA REIT Guidelines, (vi) Acquisition Fees and Acquisition Expenses, (vii) real estate commissions on the Sale of Properties, (viii) Financing Coordination Fees and (ix) other fees and expenses connected with the acquisition, disposition, management and ownership of real estate interests, mortgage loans or other property (including the costs of foreclosure, insurance premiums, legal services, maintenance, repair and improvement of property).

  • Equalized assessed value means the assessed value of a property divided by the current average ratio of assessed to true value for the municipality in which the property is situated, as determined in accordance with sections 1, 5, and 6 of P.L.1973, c.123 (C.54:1-35a through C.54:1-35c).

  • Development Costs means costs incurred to obtain access to reserves and to provide facilities for extracting, treating, gathering and storing the oil and gas from reserves. More specifically, development costs, including applicable operating costs of support equipment and facilities and other costs of development activities, are costs incurred to:

  • Anticipated county property tax revenue availability means the

  • Redevelopment Property means a property owned by the Company or a Consolidated Subsidiary (a) where the commenced leased square footage is less than 60% of the sum of net rentable square feet and redevelopment space, with reasonable adjustments to leased square footage determined in good faith by the Company, including adjustments for available power, required support space and common area and (b) that the Company reasonably characterizes as held in whole or in part for redevelopment.

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected.  Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.

  • Estimated Costs means costs estimated by the Authority as likely to be:

  • Approved Operating Expenses operating expenses incurred by Borrower which (i) are included in the Approved Operating Budget for the current calendar month, (ii) are for real estate taxes, insurance premiums, electric, gas, oil, water, sewer or other utility service to the Property or (iii) have been approved by Lender, such approval not to be unreasonably withheld, conditioned or delayed.

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • Estimated Cost , for the purposes of rule 22, means the estimated cost to maintain, repair or replace a major capital item;