Capacity Test A definition

Capacity Test A means achieving ≥ 75% MEC for a duration of ≥ 30 mins;
Capacity Test A means achieving ≥ 75% MEC for a duration of ≥ 30 mins which shall be verified by the Company;

Examples of Capacity Test A in a sentence

  • Date/Time Start Date/Time End Total MWh delivered to the POI during Capacity Test (A) Charging Energy measured at POI (MWh) (B) RTE Ratio 100% x (A ÷ B) Enter the information for each ExcludedTime event during the reporting period.

  • Arterial Occlusion Muscle Oxygenation Capacity Test: A blood pressure cuff will be placed around the distal thigh of the dominant leg.

  • For Renewable Generators, the Company will issue the Operational Certificate once Capacity Test A has been passed, as verified by the Company and the passing of Capacity Test A willbe certified in the Operational Certificate.

  • Agreed.Page 30, definition section of Schedule 7B“Expiry date”: suggest replacing the definition with “means the date falling one (1) month after the date of issuance of the Operational Certificate” as I think that the reference to Capacity Test A and B is superfluous and confusing since the date of the issuance of the Operational Certificate and the date of the achievement of the tests could be different.

  • For Renewable Generators, Operational Certificates are issued following the passing of Capacity Test A (≥75% MEC).

  • Capacity Test A means achieving ≥ 75% MEC for a duration of ≥ 30 mins.

  • For Non-Renewable Generators, the Company will issue the Operational Certificate once Capacity Tests A and B have been passed, as verified by the Company, and the passing of Capacity Test A and B will be certified in the Operational Certificate.

Related to Capacity Test A

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Cannabis testing facility means an entity registered by

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • LCT Test Date shall have the meaning provided in Section 1.12(b).

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement. Generation Interconnection Customer:

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.

  • Base Capacity Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(b).

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Capacity Payment means a payment to a capacity provider under these Regulations for its commitment to meet a capacity obligation during a delivery year;