Work Train Ordered for 7K in Multi Yard Terminal A Sample Clauses

Work Train Ordered for 7K in Multi Yard Terminal A. On Duty 645K Switch, Make Up, Air 8K * Time at Outer Switch 9K Run to B 40 miles (1 hr) Time at Work Site B 1 hour Run to C (Thru A) 50 miles (3 hours 2-1/2 hours Running 30 minutes Delay at "A" Time absorbed in Rd. miles) Work at C 5 hours Return to Terminal A 5 miles (30 minutes) * Time at Outer Switch 1930K Crew Off Duty 2045K Payment for trip - 96 miles actual run, plus 8 hours 30 minutes at 12-1/2 m.p.h., plus 1 hour at 18-3/4 m.p.h. = 221 miles. * NOTE: Road miles commence or cease at Outer Switch.
AutoNDA by SimpleDocs

Related to Work Train Ordered for 7K in Multi Yard Terminal A

  • REQUIRED FOR PART 2 JOC - PRICING OF Regular Hours Coefficient What is your regular hours coefficient for the RS Means Price Book? (FAILURE TO RESPOND PROHIBITS PART 2 JOC EVALUATION) Remember that this is a ceiling price proposed. You can discount lower than your proposed contract coefficient, but not higher. This is one of three pricing questions that are required for consideration for award on this solicitation. Please consider your answer carefully. An explanation of the TIPS scoring of pricing is included in the attachments for your information. The below is an Example of how pricing model works (not intended to influence your proposed coefficient, you should propose a coefficient that you determine is right for your business): To propose the exact pricing as the RS Means Unit Price Book, you would insert a 1.0 and to propose a 5% discount for the RS Means Price Book would be a .95 regular hours coefficient and so on.

  • Maximum order The Contractor is not obligated to honor—

  • Emergency Action on Imports of Particular Products Where any product is being imported in such increased quantities and under such conditions as to cause, or threaten to cause:

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • How Are Contributions to a Xxxx XXX Reported for Federal Tax Purposes You must file Form 5329 with the IRS to report and remit any penalties or excise taxes. In addition, certain contribution and distribution information must be reported to the IRS on Form 8606 (as an attachment to your federal income tax return.)

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • UTILIZATION OF PROP F AND TEMPORARY EXEMPT EMPLOYEES 117. The Human Resources Director agrees to work with City departments to ensure proper utilization of Proposition F and temporary exempt (“as needed”) employees when such positions would more appropriately or efficiently be filled by permanent employees. In addition, the City will notify holdovers in represented classifications of any recruitment for exempt positions in their classifications.

  • Tandem Transit Traffic 12.1 As used in this Section, Tandem Transit Traffic is Telephone Exchange Service traffic that originates on CBB's network, and is transported through Verizon’s Tandem to the subtending End Office or its equivalent of another carrier (CLEC, ILEC other than Verizon, Commercial Mobile Radio Service (CMRS) carrier, or other LEC (“Other Carrier”). Neither the originating nor terminating customer is a Customer of Verizon. Subtending End Offices shall be determined in accordance with and as identified in the Local Exchange Routing Guide (LERG). Switched Exchange Access Service traffic is not Tandem Transit Traffic.

  • FLORIDA CONVICTED/SUSPENDED/DISCRIMINATORY COMPLAINTS By submission of an offer, the respondent affirms that it is not currently listed in the Florida Department of Management Services Convicted/Suspended/Discriminatory Complaint Vendor List.

  • File Management and Record Retention relating to CRF Eligible Persons or Households Grantee must maintain a separate file for every applicant, Eligible Person, or Household, regardless of whether the request was approved or denied.

Time is Money Join Law Insider Premium to draft better contracts faster.