Well or Borehole Storage Sample Clauses

Well or Borehole Storage. During a pumping test, a common assumption is that the pumping rate equals the discharge from the aquifer. This assumption is acceptable only as long as a small percentage of discharge originates from within the well or borehole. In any large diameter well, borehole storage is a potential concern. If borehole storage dominates the response of a single-well pumping test, the time/drawdown data will appear as a straight line on a log-log plot with a slope of one. During a pumping test, the effects of borehole storage diminish with time and may be ignored at late times. Until storage effects dissipate, the drawdown will be less than if storage effects were not present. Two problems exist if flowmeter measurements are made before borehole storage dissipates. One problem is that the total flow into the well from the aquifer is increasing with time. Hence, the flow distribution to the well will be changing with time. Another problem is that calculated transmissivity values will be too high unless the drawdown values are corrected for wellbore storage. When performing a flowmeter test of this design, borehole storage should be considered in the analyses, especially in low permeability aquifers or in boreholes of large diameters.
AutoNDA by SimpleDocs

Related to Well or Borehole Storage

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Sub-Loop In locations where SBC-AMERITECH has deployed: (1) Digital Loop Carrier systems and an uninterrupted copper loop is replaced with a fiber segment or shared copper in the distribution section of the loop; (2) Digital Added Main Line (“DAML”) technology to derive multiple voice-grade POTS circuits from a single copper pair; or (3) entirely fiber optic facilities to the end user, SBC-AMERITECH will make the following options available to CLEC:

  • Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and its cross-box (or other access point) that serves an end user location.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Cloud storage DSHS Confidential Information requires protections equal to or greater than those specified elsewhere within this exhibit. Cloud storage of Data is problematic as neither DSHS nor the Contractor has control of the environment in which the Data is stored. For this reason:

  • Unbundled Sub-Loop Feeder 2.8.4.1 Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and cross-box (or other access point) that serves an end user location.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Cemetery The Local Church agrees and insures that, after the Disaffiliation Date, its cemetery and/or columbarium, will continue to be maintained in substantially the same manner as presently maintained. In addition, Local Church will honor any and all contracts, deeds, and agreements for burial and/or internment in its cemetery or columbarium, as well as insuring and continued access for families and loved ones of United Methodists buried there and for burials in unfilled xxxxxx and columbarium slots (including granting an access easement to the Conference and members of the United Methodist Church for visitations, historical research, and related purposes).

Time is Money Join Law Insider Premium to draft better contracts faster.