WALLS AND BEAMS (FINISHES Sample Clauses

WALLS AND BEAMS (FINISHES. 22.4.1 Internal walls to receive one coat cement plaster finish, troweled smooth with a steel trowel
AutoNDA by SimpleDocs

Related to WALLS AND BEAMS (FINISHES

  • UNIFORMS, TOOLS AND EQUIPMENT 23.1 Uniforms‌ The Employer may require employees to wear uniforms. Where required, the Employer will determine and provide the uniform or an equivalent clothing allowance. The Employer will follow their policy regarding the provision and maintenance of required uniforms, specialized clothing and footwear. The cost of normal wear and tear and loss of required uniforms, specialized clothing and footwear due to workplace conditions is the responsibility of the Employer.

  • WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.

  • Glazing All new and replacement exterior windows shall have sealed, low emmissivity, insulating glass units which are manufactured by members of SIGMA and IGCC. Sealed insulating glass shall meet ASTM E774, class B. Glass shall be hermetically dual sealed, inert gas filled, double pane units with exterior 3/16” bronze float glass (IoE second surface), ½” air space, and interior 3/16” clear float glass. Insulated panels, if used, shall be 1” laminated panels equal to Xxxxx Industries architectural panels with a porcelain fused-on finish. Wired or clear fire-rated glass shall be UL approved. Safety glass shall be tempered or laminated, and shall meet ANSI 297.1 standard.

  • Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Tools and Equipment As established by current practices, the Employer may determine and provide necessary tools, tool allowance, equipment and foul weather gear. The Employer will repair or replace employer-provided tools and equipment if damaged or worn out beyond usefulness in the normal course of business. Employees are accountable for equipment and/or tools assigned to them and will maintain them in a clean and serviceable condition.

  • Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. Experience: A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • MASONRY 4.1 Storm Shelter Area/Tornado Protection: In new building construction, provide lateral and vertical bracing in the walls around the employee toilet rooms. DIVISION 5 – METALS

Time is Money Join Law Insider Premium to draft better contracts faster.