Topography and Elevation Sample Clauses

Topography and Elevation. 16. The elevation of the management areas ranges from 700 – 1,500 meters above sea level (masl) where around 376.71 hectares or 22% falls within 1,200 – 1,300 masl. Slope ranges also at 8% - 50% and above where 601.89 hectares is within 30% - 50% slope.
AutoNDA by SimpleDocs
Topography and Elevation. 19. The domain lies within gently sloping to very steep slopes where around 546 has. fall under 50% and above slope with an elevation of around 648 meters above sea level (masl).
Topography and Elevation. 18. The management area falls within 400 – 900 meters above sea level (masl) where around where around 241.81 hectares fall within 700 – 800 masl. Slope ranges also at 18% - 50% where 289.16 hectares is within 30% - 50%.

Related to Topography and Elevation

  • Topography Altering the existing topography of the Property by digging, plowing, disking, or otherwise disturbing the surface is prohibited, unless Grantee determines such requested action will be carried out consistent with the Restoration Plan and will be carried out in a manner that protects the conservation values. Grantor shall obtain Xxxxxxx’s written permission in advance of commencing such action.

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Physical Architecture 59.2.1 CenturyLink's network architecture in any given local exchange area and/or LATA can vary markedly from another local exchange area/LATA. Using one or more of the NIMs herein, the Parties will agree to a physical architecture plan for a specific LATA, or if appropriate based on other requirements in Section 59, Local Calling Area. The physical architecture plan, as described in the Local Interconnection POI Profile, will be discussed during joint implementation planning. CLEC and CenturyLink agree to Interconnect their networks through existing and/or new Interconnection Facilities between CLEC switch(es) and CenturyLink's End Office Switch(es) and/or Tandem Switch(es). The physical architecture plan will be in accordance with Forecasting and Planning requirements in Article IV.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

Time is Money Join Law Insider Premium to draft better contracts faster.