Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Walkthroughs A walkthrough is a formative assessment process that focuses on one (1), but not more than two (2), of the following components which results in brief written note(s) or a summary:
Electrical connections In accordance with paragraph 5.11. However, if a rear position lamp is reciprocally incorporated with a direction- indicator, the electrical connection of the rear position lamp on the relevant side of the vehicle or the reciprocally incorporated part of it may be such that it is switched OFF during the entire period (both ON and OFF cycle) of activation of the direction-indicator lamp.