TENDER SAMPLE Sample Clauses

The Tender Sample clause requires a party submitting a bid or proposal to provide a physical or representative sample of the goods or materials they intend to supply. In practice, this means that bidders must deliver a sample item for inspection and evaluation by the buyer before any contract is awarded, ensuring that the proposed products meet the required specifications and quality standards. This clause helps the buyer verify product suitability and quality in advance, reducing the risk of receiving substandard goods after contract execution.
POPULAR SAMPLE Copied 1 times
TENDER SAMPLE. Bidder shall have to submit the sample of material (1-meter length) with the offer (in case of first supply to TPSODL.
TENDER SAMPLE. One no. Sample of braided tinned Copper to be submitted during technical bid submission along with current density calculation.
TENDER SAMPLE. Bidder shall submit the sample of material with the offer (in case of first supply to TPCODL/ TPNODL/ TPSODL/ TPWODL).
TENDER SAMPLE. Bidder shall submit the 1 sample of each size during technical evaluation of Tender.

Related to TENDER SAMPLE

  • DELIVERY PRESSURE ▇▇▇▇▇▇ agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • DELIVERY: FOB DESTINATION, INSIDE DELIVERY, FREIGHT PAID Whenever possible, contractors should give the ordering entities 3 working days prior notice of any deliveries and/or installations. Furniture contractors will not be responsible for the removal/moving of existing furnishings unless requested by the ordering entity. Contractors should verify site readiness prior to delivery. All deliveries will be made during normal working hours unless otherwise arranged with the ordering entity. Contractor will communicate any scheduling delays and/or changes immediately. Agencies will not be responsible for any freight damage, concealed or otherwise.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Abnormally Low Tenders 35.1 An Abnormally Low Tender is one where the Tender price, in combination with other constituent elements of the Tender, appears unreasonably low to the extent that the Tender price raises material concerns with the Procuring Entity as to the capability of the Tenderer to perform the Contract for the offered Tender price. 35.2 In the event of identification of a potentially Abnormally Low Tender by the evaluation committee, the Procuring Entity shall seek written clarification from the Tenderer, including a detailed price analyses of its Tender price in relation to the subject matter of the contract, scope, delivery schedule, allocation of risks and responsibilities and any other requirements of the tendering document. 35.3 After evaluation of the price analysis, in the event that the Procuring Entity determines that the Tenderer has failed to demonstrate its capability to perform the contract for the offered Tender price, the Procuring Entity shall reject the Tender.