Technical Requirements: Attestation of Production Units Sample Clauses

Technical Requirements: Attestation of Production Units. In order to attest a Production Unit to participate in a specific service it must successfully pass a simulation test as described below. • In case the Production Unit does not complete the simulation test successfully, XXXX and the BSP will make best effort to identify the source of the failure and the BSP will make best effort to solve the source of the failure.
AutoNDA by SimpleDocs

Related to Technical Requirements: Attestation of Production Units

  • Technical Requirements 2.7.4.1 The NID shall provide an accessible point of interconnection and shall maintain a connection to ground.

  • Specific Order Processes and Requirements 1. Distributor will order Software from SAP using and filling out completely such forms and minimum order requirements as SAP may prescribe from time to time and must comply with any then-current order process for the specific Software product. Where applicable, Distributor agrees to use the electronic means provided by SAP for placing orders.

  • Minimum Technical Requirements Participant will be responsible for installing (unless Vendor provides), maintaining and hosting the Vendor’s integration package (either “Full Express” or “Express Lite” software) on Participant’s own computer to enable connectivity to the Network for the Patient Look-Up and Delivery Services including installing and maintaining updates and upgrades. Participant’s machine must meet the following requirements for hosting the Vendor’s integration package: • A virtual machine environment running VMware Player (free open source product) that can run the Express VMware disk image (.ova format) • For Vendor’s “Express Lite” software (for Participants that already have an enterprise master patient index (MPI) and a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 4 CPU cores o 8GB of RAM o 100GB of available disk space • For Vendor’s “Full Express” software (for Participants that do not already have an MPI or a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 8 CPU cores o 16GB of RAM o 500GB of available disk space • Network access between the Vendor’s Express software (either “Express Lite” or “Full Express”) and the Participant’s health information exchange system for the exchange of clinical system data for the Patient Look-Up and Delivery Services. The Participant shall maintain availability of its data for query on a 24 hour/7 day basis with the exception of routine and unexpected maintenance, at greater than 99% uptime monthly. The Participant shall make its data available for a minimum look-back period of 18 months up to and including current available data and update the available data daily.

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Requirement to Utilize HUB Compliance Reporting System Pursuant to Texas Administrative Code, Title 34, Part 1, Sections 20.285(f) and 20.287(b), TFC administers monthly administration HSP-PAR compliance monitoring through its HUB Compliance Reporting System commonly known as B2G. PSP and PSP’s subcontractors/subconsultants shall submit required PAR information into the B2G system. Any delay in the timely submission of PAR information into the B2G system will be treated as an invoicing error subject to dispute under Texas Government Code Section 2251.042.

  • Compliance with Audit and Reporting Requirements; Maintenance of Records A. The Grantee shall submit to an audit of funds paid through this Grant Agreement and shall make all books, accounting records and other documents available at all reasonable times during the term of this Grant Agreement and for a period of three (3) years after final payment for inspection by the State or its authorized designee. Copies shall be furnished to the State at no cost

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Testing/Trouble Reporting 1.15.1 TWTC will be responsible for testing and isolating troubles on Network Elements. TWTC must test and isolate trouble to the AT&T network before reporting the trouble to the Network Elements Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from AT&T at the time of the trouble report, TWTC will be required to provide the results of the TWTC test which indicate a problem on the AT&T network. Version: 4Q06 Standard ICA 11/30/06

  • Child Abuse Reporting Requirements A. Grantees shall comply with child abuse and neglect reporting requirements in Texas Family Code Chapter 261. This section is in addition to and does not supersede any other legal obligation of the Grantee to report child abuse.

Time is Money Join Law Insider Premium to draft better contracts faster.