T-4 Sample Clauses

T-4. Part III -- Underground Crossings --------------------------------- Section U -- General................................................................ U-1 to U-14 Arrangement for Work............................................................. U-1 Location......................................................................... U-2 Side Clearance from Rail......................................................... U-3 Clearance Below Base of Rail..................................................... U-4 and U-5 Arrangement of Conduit System.................................................... U-6 Protection of Ducts.............................................................. U-7 and U-8 Excavation....................................................................... U-9 Shoring.......................................................................... U-10 Grading and Drainage............................................................. U-11 Backfilling...................................................................... U-12 Removing Surplus Material........................................................ U-13 Concrete......................................................................... U-14 -3- Association of American Railroads Communication Manual 1989 Part 1-B-1 -------------------------------------------------------------------------------- A -- Purpose ------------ A-1 These recommended practices are for construction and maintenance of communication lines crossing the tracks and associated parallel communication lines of steam and electrified railroads, except street railways.
AutoNDA by SimpleDocs

Related to T-4

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • White Pages Listings 5.1 BellSouth shall provide <<customer_name>> and their customers access to white pages directory listings under the following terms:

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • APPENDIX E During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees to comply with the following non- discrimination statutes and authorities; including but not limited to: Pertinent Non-Discrimination Authorities: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 C.F.R. Part 21. • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 C.F.R. Part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); • Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131 – 12189) as implemented by Department of Transportation regulations at 49 C.F.R. Parts 37 and 38; • The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures nondiscrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. § 1681 et seq). TERM B.2 CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS -- PRIMARY COVERED TRANSACTIONS

  • Long Description (If Applicable Training to provide the knowledge, skills and abilities needed as a result of agency mission, policies, or procedures. . Training to acquire the knowledge, skills and abilities needed as a result of assignment to new duties and responsibilities when such training is not part of a planned, career development program (e.g., training provided to a staffing specialist who has been newly assigned to a position involving classification duties).

  • APPENDIX D Appendix D, Pricing Schedules, attached hereto, is hereby expressly made a part of this Contract as fully as if set forth at length herein.

  • APPENDIX H Appendix H, Contractor’s Insurance Requirements, attached hereto, is hereby expressly made a part of this Contract as fully as if set forth at length herein. The Contractor shall maintain in force at all times during the terms of the resultant Contract, policies of insurance pursuant to the requirements outlined in Appendix H – Contractor’s Insurance Requirements.

  • ITEM DESCRIPTION Equipment (include VIN, make, model, year, serial no., accessories, or other identifying features): 12. NO. OF OPERATORS PER SHIFT 13. HRLY/ DAILY/ MILEAGE SHIFT BASIS 14. SPECIAL 15. GUARANTEE (8 HOURS) Rate Unit Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $75 Daily Ea. Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $45 Daily Ea. Accessible Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $95 Daily Ea. Accessible Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $65 Daily Ea.

  • ATTACHMENT E EQUITY-BASED REQUIREMENT – Description of the project’s equitable design and implementation by addressing the program’s equity goals, awareness, access and distribution, and outcomes.

  • FREQUENCY AND COVERAGE 3.1 All MI Reports must be completed by the Supplier using the MI Reporting Template and returned to the Authority on or prior to the Reporting Date every Month during the Term and thereafter, until all transactions relating to Call-Off Contracts have permanently ceased.

Time is Money Join Law Insider Premium to draft better contracts faster.