Supply of Requested Material Sample Clauses

Supply of Requested Material. 2.1 (Supply) The NSW Health Agency may from time to time, through its biobank, supply the Requested Material to the Recipient, subject to the terms and conditions of this Agreement.
AutoNDA by SimpleDocs

Related to Supply of Requested Material

  • Failure to Supply Workmen or Materials or to Prosecute the Work A Notice of Non-Compliant Work may be issued for failure of the Contractor to supply enough workers or enough materials or proper materials to prosecute the Work. A Notice of Non-Compliant Work in such event may be based on Article 3.3.2 (Competent Management of Time), and upon the definition of Work as set forth under Paragraph 1.1.9.58.

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Testing/Trouble Reporting 1.15.1 TWTC will be responsible for testing and isolating troubles on Network Elements. TWTC must test and isolate trouble to the AT&T network before reporting the trouble to the Network Elements Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from AT&T at the time of the trouble report, TWTC will be required to provide the results of the TWTC test which indicate a problem on the AT&T network. Version: 4Q06 Standard ICA 11/30/06

  • Authorized User Overview and Mini-Bid Process Project Based IT Consulting Services Contracts enable Authorized Users to use a competitive Mini-bid Process to acquire Services on an as-needed basis, for qualified IT Projects. Project Based IT Consulting Services may include, but will not be limited to projects requiring: analysis, data classification, design, development, testing, quality assurance, security and associated training for Information Technology based applications. See section 1.3 Out of Scope Work for a listing of projects expressly excluded from the scope of this Contract. An Authorized User Agreement for Project Based IT Consulting Services will be governed first by the terms and conditions specified in the OGS Centralized Contract and second by terms and conditions added to the Authorized User Statement of Work. Additional terms and conditions shall not conflict with or modify the terms and conditions of the OGS Centralized Contract. NYS Executive Agencies must adhere to all internal processes and approvals including, as required, approval from NYS Office of Information Technology Services. Other Authorized Users must adhere to their own internal processes and approvals. In accordance with Appendix B, section 28, Modification of Contract Terms, an Authorized User may add additional required terms and conditions to this Mini-Bid and resultant Authorized User Agreement only if such terms and conditions (1) are more favorable to the Authorized User and (2) do not conflict with or supersede the OGS Centralized Contract terms and conditions. Examples of additional terms and conditions include: • Expedited delivery timeframe; • Additional incentives, such as discount for expedited payment/Procurement Card use; and • Any additional requirements imposed by the funding source or Federal law.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Time is Money Join Law Insider Premium to draft better contracts faster.