Sufficient Propulsion and Steering Ability Check Sample Clauses

Sufficient Propulsion and Steering Ability Check. The simplest assessment procedure, Sufficient Propulsion and Steering Ability Check, is based on pure empirical formulae to define the required installed power as a function of main ship parameters. The formulae proposed below are based on the application of the comprehensive propulsion and steering assessment procedures to over 400 bulk carriers, tankers, container ships and general cargo vessels equipped with two-stroke low-speed diesel engines, a fixed-pitch propeller and a conventional rudder. For each ship, the maximum significant wave height was found, at which the required brake power is equal to the available brake power, separately for steering and propulsion criteria. Based on these results, MCR was approximated as empirical formulae of hs, for each combination of main ship parameters, and then, the required installed power was found that satisfies the standard significant wave heights for propulsion and steering proposed in section 2.6.3. The resulting empirical formulae are, for propulsion ability requirement B pp MCR  0.21 C0.5  L2 , where MCR, kW, is the required installed power in terms of the maximum continuous rating of the engine, and for the steering ability requirement  L MCR  0.15  c R pp , R pp m R where c  L T 50  A*  , and A*  min2A / 3, Ap  . R R R Figure 55 compares these empirical formulae with the results of the comprehensive assessment; ideally, the Sufficient Propulsion and Steering Ability Check should provide the same or slightly more conservative results than the Comprehensive Assessment. Testing of the proposed formulae by all interested stakeholders and its validation are required to approve / improve them; it should be noted that these formulae are suitable only for vessels equipped with two-stroke low-speed diesel engines, a fixed-pitch propeller and a conventional rudder; for other types of engine, propulsion and steering the simplified or comprehensive assessment should be used.
AutoNDA by SimpleDocs

Related to Sufficient Propulsion and Steering Ability Check

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Inspection and Final Acceptance District may, at its discretion, inspect and accept or reject any of Consultant’s work under this Agreement, either during performance or when within sixty (60) days after submitted to District. If District does not reject work by a timely written explanation, Consultant’s work shall be deemed to have been accepted. District’s acceptance shall be conclusive as to such work except with respect to latent defects, fraud and such gross mistakes as amount to fraud. Acceptance of any of Consultant’s work by District shall not constitute a waiver of any of the provisions of this Agreement including, but not limited to indemnification and insurance provisions.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • CERTIFICATION OF INDEPENDENT PRICE DETERMINATION By submission of this bid, the Bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, that in connection with this procurement:

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Course Curriculum, Instruction, and Grading X. Xxxx College courses offered as dual credit, regardless of where they are taught, follow the same syllabus, course outline, textbook, grading method, and other academic policies as the courses outlined in the Hill College catalog.

  • Inspection and Rejection of Nonconforming Goods (a) Buyer shall inspect the goods within five days of receipt (“Inspection Period”). Xxxxx will be deemed to have accepted the goods unless it notifies Seller in writing of any Nonconforming Goods during the Inspection Period and furnishes documentation reasonably required by Seller. “

  • Domestic Iron and Steel Certification Pursuant to Sections 2252.201-2252.205 of the Government Code, Service Provider certifies that it is in compliance with the requirement that any iron or steel product produced through a manufacturing process and used in the project is produced in the United States.

  • Additional Wet Weather Procedure 14.15.1 Remaining On Site Where, because of wet weather, the employees are prevented from working:

Time is Money Join Law Insider Premium to draft better contracts faster.