Study Phases Sample Clauses

Study Phases. The following includes the various phases of the Study that Contractor shall perform:
AutoNDA by SimpleDocs
Study Phases. In Phase I, fresh BC samples were tested and analyzed at 11 of the 13 59 clinical sites participating in the study, and seeded samples were provided, tested, and analyzed 60 at 11 sites. Nine clinical sites tested both fresh and seeded samples. In Phase II, five of the 61 clinical sites enrolled and tested positive BC prepared from fresh and seeded samples with the 62 Accelerate Pheno™ system. Reference testing was performed at the reference laboratory Phase
Study Phases. The study will be conducted in three phases. During the first phase a blood POC test using UCP-LFA TransDot [14] technology will be developed by LUMC, incorporating six serum markers, CRP, IFN-γ, pre-albumin, complement factor H, apolipoprotein A1 and IP-10. During this phase optimal antibody pairs for the lateral flow strips will be evaluated. In the event of a lack of optimal test performance for individual markers, replacement markers will be selected according to ongoing marker evaluation at the respective sites. The TransDot test device technology will be optimized using serum from a subset of the first 500 recruited participants. These samples will be shipped to LUMC. During a second phase of the study, TransDot devices will be available in the African laboratories, to test the remaining training set participants’ serum locally. The first two phases will aim to optimise the sensitivity and specificity of the TransDot test. The third phase will be the evaluation of the TransDot test in the field setting, by research nurses testing test set participants’ fingerprick blood.

Related to Study Phases

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Phases Contractor acknowledges and agrees the Project will progress in phases, in accordance with the Project Schedule. Contractor shall prepare, for Owner Parties’ review and approval, a separate Construction Schedule, for each phase. Each phase shall commence upon Owner Parties’ issuance of a Notice to Proceed for such phase and shall achieve Substantial Completion by the milestone dates set forth in the Contract Documents, including the Construction Schedule.

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Preconstruction Phase The Preconstruction Phase shall mean the period commencing on the date of this CM/GC Contract and ending upon commencement of the Construction Phase; provided that if the Owner and CM/GC agree, the Construction Phase may commence before the Preconstruction Phase is completed, in which case both phases shall proceed concurrently, subject to the terms and conditions of the Contract Documents.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Bidding Phase 2.8.1 The Professional, following the Owner's approval of the Construction Document Phase, shall assist the Owner in obtaining bids and in award and preparation of Construction Contracts.

Time is Money Join Law Insider Premium to draft better contracts faster.