Soundness Test Clause Samples

Soundness Test. The coarse aggregate to be used for all concrete works shall pass a sodium or magnesium sulphate accelerated soundness test specified in L.S. 2386 (Part – V) 1963 and the average low of weight after 5 cycles shall not exceed the limits specified in clause 3.6 of I.S. 383 – 1970.

Related to Soundness Test

  • Post-Commercial Operation Date Testing and Modifications Developer and Connecting Transmission Owner shall each at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice and Applicable Reliability Standards as may be necessary to ensure the continued interconnection of the Large Generating Facility with the New York State Transmission System in a safe and reliable manner. Developer and Connecting Transmission Owner shall each have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that: 10.1.2.1.6.1 Ensures construction documents are well coordinated and reviewed for errors; 10.1.2.1.6.2 Identifies to the extent known, construction deficiencies and areas of concern; 10.1.2.1.6.3 Back-checks design drawings for inclusion of modifications; and 10.1.2.1.6.4 Provides the District with written confirmation that: 10.1.2.1.6.4.1 Requirements noted in the design documents prepared for the Project are consistent with and conform to the District's Project requirements and design standards. 10.1.2.1.6.4.2 Various components have been coordinated and are consistent with each other so as to minimize conflicts within or between components of the design documents.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Alcohol Testing Alcohol testing will be conducted by using an evidential breath-testing device (EBT) approved by the National Highway Traffic Safety Administration. A screening test will be conducted first. This initial screening may be accomplished using a saliva test kit. If the result is an alcohol concentration level of less than 0.02 percent, the test is considered a negative test. If the alcohol concentration level is 0.02 percent or more, a second confirmation test using the EBT will be conducted. The procedures that will be utilized by the lab for collection and testing of the specimen are attached hereto as Appendix A.

  • Background and Narrative of Budget Reductions 2. Assumptions Used in the Deficit Reduction Plan: - EBF and Estimated New Tier Funding: - Equal Assessed Valuation and Tax Rates: - Employee Salaries and Benefits: - Short and Long Term Borrowing: - Educational Impact: - Other Assumptions: - Has the district considered shared services or outsourcing (Ex: Transportation, Insurance) If yes please explain: