Snow and Ice Conditions Sample Clauses

Snow and Ice Conditions. An additional ten percent (10%) per hour on regular hourly rate shall be paid to operators of sand trucks, brine trucks, and the grader when sanding, applying brine, or snow plowing.
AutoNDA by SimpleDocs
Snow and Ice Conditions. ‌ An additional premium of ten percent (10%) per hour on regular hourly rate shall be paid to operators of sand trucks or brine trucks when sanding, salting, or applying brine for all hours when operating such equipment irrespective of intermittent application of sand, salt or brine. Operators of trucks, graders or loaders will receive this premium when plowing snow but not when loading salt, sand, or snow. Mechanics shall also be paid this premium for any hours spent repairing/maintaining those vehicles in the field.

Related to Snow and Ice Conditions

  • Service Conditions Customer acknowledges that in the event of a service issue, Customer is responsible for on-site cooperative testing with LightEdge Technical Support to assist in the diagnosis of the trouble. Customer agrees to be bound to current terms of LightEdge Acceptable Use Policy. Terms of the Acceptable Use Policy are subject to change without notice. Current Acceptable Use Policy can be found here: xxxx://xxx.xxxxxxxxx.xxx/legal Customer agrees that any service complaints including concerns regarding level of support, products, service reliability, or any other concerns related to LightEdge or Services being provided by LIghtEdge will be communicated to LightEdge by sending an email to xx@xxxxxxxxx.xxx.

  • Space Conditions All pipes passing through floors, walls, and ceilings shall be installed with sufficient space between them to permit installation of pipe insulation and floor, wall, and ceiling plates without cutting of insulation or plates. Roughed-in dimensions shall be prepared by the Contractor to accomplish this requirement. The Contractor shall locate all equipment that must be serviced, operated, or maintained in fully accessible positions. This provision includes but is not limited to valves, traps, cleanouts, motors, controllers, switchgear, drain points, filter, access doors, and fire dampers. If spaces, dimensions, or other design conditions do not permit compliance with the present article, the Contractor shall file a request in writing with the Design Professional for additional instructions, furnishing a copy to the Owner.

  • Safe Conditions Whenever an employee reports a condition which the employee feels represents a violation of safety or health rules and regulations or which is an unreasonable hazard to persons or property, such conditions shall be promptly investigated. The appropriate administrator shall reply to the concern, in writing, if the employee's concern is communicated in writing.

  • Unsafe Conditions In accordance with 29 CFR § 1977, occasions might arise when an employee is confronted with a choice between not performing assigned tasks or subjecting himself/herself to serious injury or death arising from a hazardous condition at the workplace. If the employee, with no reasonable alternative, refuses in good faith to expose himself/herself to the dangerous condition, he/she would be protected against subsequent discrimination. The condition causing the employee's apprehension of death or injury must be of such a nature that a reasonable person, under the circumstances then confronting the employee, would conclude that there is a real danger of death or serious injury and that there is insufficient time, due to the urgency of the situation, to eliminate the danger by resorting to regular statutory enforcement channels. In addition, in such circumstances, the employee, where possible, must also have sought from his Employer, and been unable to obtain, a correction of the dangerous condition.

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • PROJECT CONDITIONS A. The Grantee agrees to the following Project Conditions:

  • Contract Conditions This section contains conditions which shall be complied with during the performance of this contract. The conditions come in two parts, general conditions and special contract requirements.

  • Seller’s Conditions The obligations of Seller at the Closing are subject, at the option of Seller, to the satisfaction or waiver at or prior to the Closing of the following conditions precedent:

  • TITLE CONDITIONS The following special conditions imposed by Combined Developers (Pty) Ltd in its favour and the favour of the HOA, will be registered against the title deed of the Property, namely:

  • License Conditions Your exercise of the Licensed Rights is expressly made subject to the following conditions.

Time is Money Join Law Insider Premium to draft better contracts faster.