Roadway Crossings Sample Clauses

Roadway Crossings. Where the contract calls for conduit crossings to be installed under existing roadways, the Contractor shall drive these conduits in approved manner. Where permitted, in lieu of driving, the Contractor may cut the pavement and install the conduits as directed. The Contractor shall restore the pavement to the satisfaction of the Engineer.
AutoNDA by SimpleDocs

Related to Roadway Crossings

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • SHOPPING CENTRES 1. The general terms and provisions of the VBIA shall apply to “Shopping Centres” (as defined) with the following variations:

  • Wire Unbundled DS1 Digital Loop This is a designed 4-wire Loop that is provisioned according to industry standards for DS1 or Primary Rate ISDN services and will come standard with a test point, OC, and a DLR. A DS1 Loop may be provisioned over a variety of loop transmission technologies including copper, HDSL-based technology or fiber optic transport systems. It will include a 4-Wire DS1 Network Interface at the End User’s location.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Parcelle no 29 : Lot 26-152 Ptie Une partie de la subdivision CENT CINQUANTE-DEUX du lot originaire VINGT-SIX (26-152 Ptie), bornée vers le nord par le lot 26-151, vers l'est par le lot 26-163 ptie, vers le sud par le lot 26-153 ptie, vers le sud-ouest par le lot 26-717 et vers l'ouest par le lot 26-150 ptie et mesure trente mètres et quarante-huit centièmes (30,48 m) vers le nord, quinze mètres et vingt-quatre centièmes (15,24 m) vers l'est, vingt-huit mètres et quatre-vingt-quinze centièmes (28,95 m) vers le sud, deux mètres et vingt-quatre centièmes (2,24 m) vers le sud-ouest et treize mètres et soixante centièmes (13,60 m) vers l'ouest; contenant une superficie de quatre cent soixante-trois mètres carrés et trois dixièmes (463,3 m2).

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • SUBLOOPS 45.1. Sprint will offer unbundled access to copper subloops and subloops for access to multiunit premises wiring. Sprint will consider all requests for access to subloops through the ICB process due to the wide variety of interconnections available and the lack of standards. A written response will be provided to CLEC covering the interconnection time intervals, prices and other information based on the ICB process as set forth in this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.