Replacement of existing structural stabilization measures Sample Clauses

Replacement of existing structural stabilization measures. For purposes of this section, “replacement” means the construction of a new structure to perform a shoreline stabilization function of an existing structure that can no longer adequately serve its purpose. Additions to or increases in size of existing shoreline stabilization measures shall be considered new structures. An existing shoreline stabilization structure may be replaced with a similar structure if in accordance with the following.
AutoNDA by SimpleDocs

Related to Replacement of existing structural stabilization measures

  • Limitations on Reverse Engineering, Decompilation, and Disassembly You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Technical and Organizational Measures The following sections define SAP’s current technical and organizational measures. SAP may change these at any time without notice so long as it maintains a comparable or better level of security. Individual measures may be replaced by new measures that serve the same purpose without diminishing the security level protecting Personal Data.

  • Information Systems Acquisition Development and Maintenance Security of System Files. To protect City Information Processing Systems and system files containing information, Service Provider will ensure that access to source code is restricted to authorized users whose specific job function necessitates such access.

  • Structural (i) Structural floor plans and sections with detailing well advanced.

  • Placement of EPP probes Probes for measuring EPP parameters shall be placed inside or close to Registrars points of access to the Internet across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • MANAGEMENT OF EVALUATION OUTCOMES 11.1 The evaluation of the Employee’s performance will form the basis for rewarding outstanding performance or correcting unacceptable performance.

  • Filing Systems and Equipment A complete and comprehensive catalog of filing systems including vertical and lateral files, bookcases, mobile cabinets and freestanding file cabinets.

  • Recognition of U.S. Special Resolution Regimes (a) In the event a Covered Party becomes subject to a proceeding under a U.S. Special Resolution Regime, the transfer of this Agreement (and any interest and obligation in or under, and any property securing, this Agreement) from such Covered Party will be effective to the same extent as the transfer would be effective under the U.S. Special Resolution Regime if this Agreement (and any interest and obligation in or under, and any property securing, this Agreement) were governed by the laws of the United States or a State of the United States.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Changes in Equipment, Systems, Etc USBFS reserves the right to make changes from time to time, as it deems advisable, relating to its systems, programs, rules, operating schedules and equipment, so long as such changes do not adversely affect the services provided to the Trust under this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.