Common use of Progress Payments Clause in Contracts

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 55 contracts

Samples: School District Facilites and Special, Remodeling Agreement, Sample Agreement

AutoNDA by SimpleDocs

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 28 contracts

Samples: Agreement Between Owner And, Agreement Between Owner And, www.boarddocs.com

Progress Payments. 5.1.1 Based upon Applications applications for Payment payment submitted to the Architect by the Contractor Construction Manager and Certificates certificates for Payment payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 18 contracts

Samples: Construction Management Agreement, Construction Management Agreement, Construction Management Agreement

Progress Payments. 5.1.1 5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 17 contracts

Samples: Agreement, Agreement, www.durhamnc.gov

Progress Payments. 5.1.1 11.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor Construction Manager, and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum Sum, to the Contractor Construction Manager, as provided below and elsewhere in the Contract Documents.

Appears in 16 contracts

Samples: resources.finalsite.net, Guaranteed Maximum Price Amendment, static1.squarespace.com

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect Construction Manager by the Contractor Contractor, and Certificates upon certification of the Project Application and Project Certificate for Payment issued or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, Manager, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 8 contracts

Samples: www.tippecanoe.in.gov, www.tippecanoe.in.gov, www.tippecanoe.in.gov

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect Construction Manager by the Contractor Contractor, and Certificates for Payment issued by the Construction Manager and Architect, the Owner shall make progress payments on account of the Contract Sum Sum, to the Contractor Contractor, as provided below and elsewhere in the Contract Documents.

Appears in 8 contracts

Samples: www.tippecanoe.in.gov, www.tippecanoe.in.gov, www.playcraftsystems.com

Progress Payments. 5.1.1 § 4.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 7 contracts

Samples: biznet.ct.gov, www.greenfieldin.org, www.lickingcountylibrary.org

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of because the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 5 contracts

Samples: Agreement, Agreement, Agreement

Progress Payments. 5.1.1 12.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 4 contracts

Samples: Agreement (Digex Inc/De), Coast Resorts Inc, Microware Systems Corp

Progress Payments. 5.1.1 12.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 4 contracts

Samples: Agreement, Mechanical Technology Inc, Bank of the Ozarks Inc

Progress Payments. § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 4 contracts

Samples: bigskyeconomicdevelopment.org, www.fitnyc.edu, p8cdn4static.sharpschool.com

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect and the Owner by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager subject to and as provided below and elsewhere in the Contract Documents.

Appears in 4 contracts

Samples: crdact.net, biznet.ct.gov, crdact.net

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect Construction Manager by the Contractor Contractor, and Certificates upon certification of the Project Application and Project Certificate for Payment issued or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 4 contracts

Samples: www.tippecanoe.in.gov, www.slsd.org:443, bidroom.net

Progress Payments. 5.1.1 A.1.5.1.1 Based upon Applications for Payment submitted to the Architect Owner by the Contractor and Certificates for Payment issued by the ArchitectDesign-Builder, the Owner shall make progress payments on account of the Contract Sum to the Contractor Design-Builder as provided below and elsewhere in the Contract Design-Build Documents.

Appears in 3 contracts

Samples: Fox Factory Holding Corp, Fox Factory Holding Corp, resources.finalsite.net

Progress Payments. 5.1.1 5.1 Based upon Applications for Payment submitted to the Architect Architect/Engineer by the Contractor and Certificates for Payment issued by the ArchitectArchitect/ Engineer, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.for the period ending the 5th day of the month as follows:

Appears in 2 contracts

Samples: Agreement Between Owner and Contractor, www.wilsonco.com

Progress Payments. § 5.1.1 Based upon Applications for Payment submitted to the Architect Engineer by the Contractor and Certificates for Payment issued by the ArchitectEngineer, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 2 contracts

Samples: www.lesd.k12.or.us, mccmeetingspublic.blob.core.usgovcloudapi.net

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor Construction Manager and Certificates f th ding for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor o Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 2 contracts

Samples: campussuite-storage.s3.amazonaws.com, www.sunmandearborn.k12.in.us

Progress Payments. 5.1.1 Based upon the Contractor's Applications for Payment submitted to the Architect by the Contractor and upon Certificates for Payment subsequently issued to the Owner by the Architect, the Owner shall make progress payments to the Contractor on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract DocumentsPrice.

Appears in 2 contracts

Samples: Fixed Price Contract, www.douglasvillega.gov

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Contactor as provided below and elsewhere in the Contract Documents.

Appears in 2 contracts

Samples: Agreement, Owner and Contractor Agreement

Progress Payments. 5.1.1 11.1.1 Based upon Applications for Payment submitted to the Architect and/or Owner by the Contractor Construction Manager, and Certificates for Payment issued by the ArchitectArchitect and agreed by the Owner, the Owner shall make progress payments on account of the Contract Sum Sum, to the Contractor Construction Manager, as provided below and elsewhere in the Contract Documents.

Appears in 2 contracts

Samples: county.milwaukee.gov, county.milwaukee.gov

Progress Payments. 5.1.1 (1) Based upon Applications for Payment submitted to the Architect Architect/Engineer by the Contractor and Certificates for Payment issued by the Architect/Engineer, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 2 contracts

Samples: Construction Agreement, Construction Agreement

Progress Payments. 5.1.1 Based upon Applications for Payment including all supporting documents, submitted to the Owner and Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: www.lexpublib.org

Progress Payments. 5.1.1 § 12.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor th Contractor, as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: mission.sfgov.org

Progress Payments. 5.1.1 Based upon Applications for Payment and Certifications thereof with all documentation required by Owner's Lender submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: Contract for Construction (Monarch Casino & Resort Inc)

Progress Payments. 5.1.1 5.1 Based upon Applications for Payment submitted to the Architect by the Contractor contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: Pacific Aerospace & Electronics Inc

Progress Payments. DRAFT § 5.1.1 Based upon Applications for Payment submitted to the Architect Engineer by the Contractor and Certificates for Payment issued by the ArchitectEngineer, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: purchasing.gcsnc.com

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents. The submission of this Application constitutes a certification that the Work is current on the Construction Manager’s Construction Schedule, unless otherwise noted on the Application. The Application shall be in a form acceptable to the Owner and shall include an accounting by natural expense categories.

Appears in 1 contract

Samples: crookcounty.k12.or.us

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to lo the Contractor as provided below and elsewhere in the Contract Documents.,

Appears in 1 contract

Samples: www.iowacityschools.org

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor in the form required by the Contract Documents and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: core-docs.s3.amazonaws.com

Progress Payments. 5.1.1 Based upon the Contractor’s Applications for Payment submitted to the Architect by the Contractor and upon Certificates for Payment subsequently issued to the Owner by the Architect, the Owner shall make progress payments to the Contractor on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract DocumentsPrice.

Appears in 1 contract

Samples: core-docs.s3.amazonaws.com

Progress Payments. 5.1.1 § 4.1.1 Based upon Applications for Payment submitted to the Architect and Owner by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract DocumentsArticle 15.

Appears in 1 contract

Samples: homeforward.org

Progress Payments. § 5.1.1 Based upon Applications for Payment submitted to the Payment, including all supporting documentation, submitted to the Owner and the Architect by the Contractor and Certificates for Payment issued by the Architect, properly issued by the Architect and not objected to by the Owner, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: www.livoniapublicschools.org

AutoNDA by SimpleDocs

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: Agreement (Old Line Bancshares Inc)

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect and the Owner by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: Form of Agreement (Nu Skin Enterprises Inc)

Progress Payments. § 5.1.1 Based upon Applications for Payment submitted to the Owner and the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall shall, subject to the provisions of the Contract Documents, make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: buy.rice.edu

Progress Payments. 5.1.1 5.1 Based upon Applications for Payment submitted to the Architect ARCHITECT by the Contractor CONTRACTOR and Certificates for Payment issued by the ArchitectARCHITECT, the Owner OWNER shall make progress payments on account of the Contract Sum to the Contractor CONTRACTOR as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: Agreement

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect Owner’s Representative by the Contractor Construction Manager and Certificates for Payment issued by the ArchitectOwner’s Representative, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: oklahoma.gov

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect and Owner’s Representative by the Contractor Construction Manager and Certificates for Payment issued by the ArchitectArchitect and Owner’s Representative, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents. Unless otherwise agreed to by the Owner, each application for Payment shall be accompanied by partial waivers of lien by the Construction Manager and applicable subcontractors.

Appears in 1 contract

Samples: www.friscogov.com

Progress Payments. 5.1.1 11.1.1 Based upon Applications for Payment submitted to the Architect Design Agent and the Owner’s Program Manager by the Contractor Construction Manager, and Certificates for Payment issued by the Architect, Design Agent and approved in writing by the Owner shall make progress payments on account of the Contract Sum Sum, to the Contractor Construction Manager, as provided below and elsewhere in the Contract DocumentsDocuments and in accordance with the provisions of “Prompt Payment by Department of Administration,” R. I. Gen. Laws §§ 42-11.1-1 et seq.

Appears in 1 contract

Samples: www.bidnet.com

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted in compliance with the Contract Documents to the Architect and the Owner by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents. The submission of this Application constitutes a certification that the Work is current on the Construction Schedule, unless otherwise noted on the Application. The Application shall be in a form acceptable to the Owner.

Appears in 1 contract

Samples: agenda-hrtf.edmonds.wednet.edu:8085

Progress Payments. § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for a Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: go.boarddocs.com

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect Engineer by the Contractor and Certificates for Payment issued by the ArchitectEngineer, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: mccmeetingspublic.blob.core.usgovcloudapi.net

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect Architect, if applicable, by the Contractor and Certificates for Payment issued by the Architect, if applicable, the Owner shall make progress payments on account of to the Contractor based upon the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: Standard Agreement

Progress Payments. 5.1.1 Based upon Applications applications for Payment payment submitted to the Architect by the Contractor Construction Manager and Certificates certificates for Payment payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.. DRAFT

Appears in 1 contract

Samples: Continuing Service Construction Management Agreement

Progress Payments. 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: www.astate.edu

Progress Payments. 5.1.1 7.1.1 Based upon properly completed Applications for Payment submitted to the Architect by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: www.waxahachie.com

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment Payment, including all supporting documentation, submitted to the Architect by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: www.rcgov.org

Progress Payments. 5.1.1 11.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor Construction Manager, and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum Sum, to the Contractor Construction Manager, as provided below and elsewhere in the Contract Documents.. DRAFT

Appears in 1 contract

Samples: cdnsm5-ss10.sharpschool.com

Progress Payments. 5.1.1 § 7.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor Construction Manager and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: biznet.ct.gov

Progress Payments. 5.1.1 7.1.1 Based upon Applications for Payment submitted to the Architect and Owner by the Contractor Construction Manager and Certificates for Payment issued by the ArchitectArchitect and approved by Owner, the Owner shall make progress payments on account of the Contract Sum to the Contractor Construction Manager as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: cms6.revize.com

Progress Payments. 5.1.1 5.1 Based upon Applications for Payment submitted to the Architect Owner by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: www.greenvillenc.gov

Progress Payments. 5.1.1 11.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates Construction for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor th o Construction Manager, as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: www.vcsedu.org

Progress Payments. 5.1.1 5.1 .1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

Appears in 1 contract

Samples: resources.finalsite.net