Production summary Sample Clauses

Production summary. (1) The insured shall complete and file with the Corporation a production summary
AutoNDA by SimpleDocs

Related to Production summary

  • POSITION SUMMARY To provide a person-centred care to residents in aged care facilities so they receive the right care in the right place at the right time throughout Bass Coast Shire. Key Selection Criteria MANDATORY: • Registered Nurse with post-graduate qualifications and experience in Emergency • Post-graduate qualifications or experience an Aged Care • Current registration with the Australian Health Practitioner Regulation Agency (XXXXX) • Excellent clinical assessment and care planning skills • Understanding and implementation of person centred care approach for service delivery • Well-developed verbal and written communication and presentation skills • Demonstrated ability to work effectively autonomously, and as part of a team • Demonstrated ability to liaise with a range of service providers • Strong interpersonal, analytical and problem solving skills • Demonstrated leadership qualities • Computer literacy • A valid Police Check DESIRABLE: • Certificate IV Training and Assessment • Experience with clinical education Position Objectives Strategic Goal Objectives Quality & Safety Health Service Wide Objectives • Be aware of and adhere to the responsibilities for safety and quality, continuous improvement and evaluation of your service. • Ensure all risks are identified and reported promptly and that prevention strategies are implemented to ensure the safety of all patients, staff and consumers • Maintain a good working knowledge of the National Safety and Quality Health Service Standards; take initiative to pursue opportunities for quality improvement, and actively contribute to accreditation of services. • Actively involve patients, consumers and/or carers in their care (including decision making regarding goals and treatment including ACP) and in quality and safety improvement activities • Maintain knowledge of infection prevention and control commensurate with the requirements of your position and adhere to the organisation’s Infection Prevention and Control policies and procedures at all times. Strategic Goal Objectives • Comply with all legislative, regulatory and policy and procedural requirements to protect and enhance the health, safety and wellbeing of staff, consumers and volunteers whilst at work. This includes the appropriate and safe use of machinery, devices and personal protective equipment and adherence to the principles of general and patient manual handling. • Be aware and adhere to Bass Coast Health’s policies and procedures, accessible via the PROMPT document management system. Local Objectives • Supports excellence in clinical practice, ensuring that the philosophy of nursing and standards of practice are reflected • Applies evidence based best practice principles while attending clinical assessment, development of management plans/goals and client/staff education • Maintains a person centred care approach to service delivery • Ensure consumer input into service and goal-directed care planning • Maintains appropriate documentation, meeting legislative requirements • Participation in quality activities • Monthly data audits performed and errors corrected in a timely manner • Completion/recording of required data for BCH and Department of Health reporting requirements • Monitor and maintain safety and function of all departmental equipment • Consumer surveys undertaken and feedback utilised to improve service provision Service Capability Health Service Wide Objectives • Be aware of the BCH Clinical Services Plan and implement relevant strategies to increase service capability. • Actively participate and support partnerships with service providers to improve service options and access. • Participate in activities that will improve facilities for care recipients and staff. • Ensure work practices enhance worker health and well-being Local Objectives • To provide a consultancy and support role to other staff/healthcare providers regarding client management in RACFs • To liaise with Education Co-ordinator regarding education required within the RACF • Attendance at meetings internally and externally as required Strategic Goal Objectives

  • JOB SUMMARY In accordance with the Vision, Purpose, and Values, and strategic direction of the Vancouver Island Health Authority, patient safety is a priority and a responsibility shared by everyone at VIHA; as such, the requirement to continuously improve quality and safety is inherent in all aspects of this position. Within a multi-site operation, the Admitting & Health Records Clerk performs admitting, switchboard, transcription, records processing, cashier and reception duties as well as a variety of clerical duties.

  • Information Supplementation Prior to the Trial Operation date, the Parties shall supplement their information submissions described above in this Article 24 with any and all “as-built” Electric Generating Unit information or “as-tested” performance information that differs from the initial submissions or, alternatively, written confirmation that no such differences exist. The Interconnection Customer shall conduct tests on the Electric Generating Unit as required by Good Utility Practice such as an open circuit “step voltage” test on the Electric Generating Unit to verify proper operation of the Electric Generating Unit's automatic voltage regulator. Unless otherwise agreed, the test conditions shall include: (1) Electric Generating Unit at synchronous speed; (2) automatic voltage regulator on and in voltage control mode; and (3) a five percent (5 percent) change in Electric Generating Unit terminal voltage initiated by a change in the voltage regulators reference voltage. The Interconnection Customer shall provide validated test recordings showing the responses of Electric Generating Unit terminal and field voltages. In the event that direct recordings of these voltages is impractical, recordings of other voltages or currents that mirror the response of the Electric Generating Unit’s terminal or field voltage are acceptable if information necessary to translate these alternate quantities to actual Electric Generating Unit terminal or field voltages is provided. Electric Generating Unit testing shall be conducted and results provided to the Participating TO and the CAISO for each individual Electric Generating Unit in a station. Subsequent to the Commercial Operation Date, the Interconnection Customer shall provide the Participating TO and the CAISO any information changes due to equipment replacement, repair, or adjustment. The Participating TO shall provide the Interconnection Customer any information changes due to equipment replacement, repair or adjustment in the directly connected substation or any adjacent Participating TO-owned substation that may affect the Interconnection Customer’s Interconnection Facilities equipment ratings, protection or operating requirements. The Parties shall provide such information pursuant to Article 5.19.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Budget Summary Other Sources (Page BudgetSum 2-3 - Acct 7000), must equal Other Uses (BudgetSum 2-3 - Acct. 8000). Estimated Beginning Fund Balance July,1 2020 for all Funds (Cells C3 - K3) (Line must have a number or zero. Do not leave blank.) OK Estimated Activity Fund Beginning Fund Balance July,1 2020 (Cell C83) (Cell must have a number or zero. Do not leave blank.) OK Transfer Among Funds (Funds 10, 20, 40 - Acct 7130 - Cells C29, D29, F29), must equal (Funds 10, 20 & 40 - Acct 8130 - Cells C52, D52, F52). OK Transfer of Interest (Funds 10 thru 90 - Acct 7140 - Cells C30:K30), must equal (Funds 10 thru 60, & 80 - Acct 8140 - Cells C53:H53, J53). OK Transfer to Debt Service to Pay Principal on Capital Leases (Fund 30 - Acct 7400 - Cell E39) must equal (Funds 10, 20 & 60 - Acct 8400 Cells C57:H60). OK Transfer to Debt Service to Pay Interest on Capital Leases (Fund 30 - Acct 7500 - Cell E40) must equal (Funds 10, 20 & 60 - Acct 8500 - Cells C61:H64). OK Transfer to Debt Service Fund to Pay Principal on Revenue Bonds (Fund 30 - Acct 7600 - Cell E41) must equal (Funds 10 & 20 - Acct 8600 - Cells C65:D68). OK Transfer to Debt Service to Pay Interest on Revenue Bonds (Fund 30 - Acct 7700 - Cell E42) must equal (Funds 10 & 20 - Acct 8700 - Cells C69:D72). OK Transfer to Capital Projects Fund (Fund 60 - Acct 7800 - Cell H43) must equal (Fund 10 & 20, Acct 8800 - Cells C73:D76). OK

  • Risk Analysis The Custodian will provide the Fund with a Risk Analysis with respect to Securities Depositories operating in the countries listed in Appendix B. If the Custodian is unable to provide a Risk Analysis with respect to a particular Securities Depository, it will notify the Fund. If a new Securities Depository commences operation in one of the Appendix B countries, the Custodian will provide the Fund with a Risk Analysis in a reasonably practicable time after such Securities Depository becomes operational. If a new country is added to Appendix B, the Custodian will provide the Fund with a Risk Analysis with respect to each Securities Depository in that country within a reasonably practicable time after the addition of the country to Appendix B.

  • Service Description The Parties will provide Common Channel Signaling (CCS) to one another via Signaling System 7 (SS7) network Interconnection, in accordance with prevailing industry standards. Use of a third party provider of SS7 trunks is permitted.

  • Material Safety Data Sheet Seller shall provide to Buyer with each delivery any Material Safety Data Sheet applicable to the work in conformance with and containing such information as required by the Occupational Safety and Health Act of 1970 and regulations promulgated thereunder or its State approved counterpart.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • MATERIAL SAFETY DATA SHEETS Contractor is required to ensure Material Safety Data Sheets (“MSDS”) are available, employees are trained in the use of MSDS, and MSDS are in a readily accessible place at the Site. This requirement applies to all materials with an associated MSDS per the federal “Hazard Communication” standard or employees’ Right-to-Know laws. Contractor is also required to ensure proper labeling and training on any substance brought onto the Site and that any person working with the material (or who is subject to possible exposure by use of the material or contact with the material), is informed of the possible and/or real hazards of the substance, and follows proper handling and protection procedures.

Time is Money Join Law Insider Premium to draft better contracts faster.