Common use of Pile Testing Clause in Contracts

Pile Testing. A designated population of piles will be tested to verify stability and resistance to up-lift forces. The number of piles is dependent on overall pier quantity and location in the project site as determined by a licensed professional engineer. The piles are tested after installation to verify structural integrity within the design parameters of the system. Piles are cycled through lateral loading at specified values and deflection is measured to verify whether piles are sufficiently stable at the various loads.

Appears in 7 contracts

Samples: And Construction Agreement, And Construction Agreement (Powersecure International, Inc.), And Construction Agreement (Powersecure International, Inc.)

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.