Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis using a completed Outreach and Enrollment Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, Attachment 1 Work Plan, Attachment 2 Outreach and Enrollment Quarterly Invoice, Attachment 3 Quarterly Progress Report, Attachment 4 Annual Budget Report, Attachment 5 2. County shall submit all documentation for Allocation completion and final reimbursement within 90 days of Allocation completion, but no later than the end of the Project Performance Period as shown on page one (1). 3. Payments shall be on the basis of costs incurred. 4. Advance Allocation payment without an invoice is not allowed. 01/05/16 INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 INVOICES/ PROGRESS REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2017 07/13/17 08/03/17 10/06/17 INVOICES/ PROGRESS REPORT July, August, September 2017 10/12/17 11/04/17 01/05/18 INVOICES/ PROGRESS REPORT October, November, December 2017 01/11/18 02/01/18 04/05/18 INVOICES/ PROGRESS REPORT January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2018 07/13/18 08/03/18 *Based on 21 processing days for DHCS’ Accounting and the State Controller’s Office.
Appears in 1 contract
Sources: Medi Cal Outreach and Enrollment Allocation Agreement
Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis basis, using a completed Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, A2 - Attachment 1 Work Plan, A2 - Attachment 2 Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3 Quarterly Progress Navigators Project Data Report, Attachment 4 Annual Budget Quarterly Progress Report, Attachment 5
2. The County shall submit all documentation for Allocation completion and final reimbursement within 90 have 60 days of Allocation completion, but no later than from the end of the Project Performance Period as shown stated on page one (1)) to close out all its administrative activities. The County shall have 30 days upon the termination of the Administrative Close-Out Period stated on page one
(1) to submit their final invoice to be reimbursed for the administrative activities completed during this period. DHCS shall issue final reimbursement within 60 days of receiving the County’s timely final invoice for administrative activities.
3. Payments shall be on the basis of costs incurred.
4. Advance payment for the Allocation payment without an invoice is not allowed. 01/05/16 11/15/2019 BUDGET / CAP Invoice for development of Budget Plan 12/31/2019 N/A 11/15/2019 WORK PLAN N/A 12/31/2019 N/A 4/30/2020 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2020 5/30/2020 6/30/2020 7/31/2020 ALL REMAINING SFY 2019-20 INVOICES/ PROGRESS REPORT April, May, June 2020 8/31/2020 9/30/2020 10/31/2020 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2020 11/30/2020 12/31/2020 1/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 2020 2/28/2021 3/31/2021 4/30/2021 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd ANNUAL BUDGET REPORT / 2021 5/30/2021 6/30/2021 7/31/2021 ALL REMAINING SFY 2020-21 INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 2021 8/31/2021 9/30/2021 10/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 2021 11/30/2021 12/31/2021 1/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 2021 3/31/2022 4/30/2022 4/30/2022 QUARTERLY January, 5/30/2022 6/30/2022 INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th ANNUAL BUDGET REPORT / 2022 7/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT REPORT/ ALL REMAINING SFY 2021-22 INVOICE(S)/ April, May, June 2017 07/13/17 08/03/17 10/06/17 INVOICES/ 2022 8/31/2022 9/30/2022 8/31/2022 10/31/2022 QUARTERLY PROGRESS REPORT REPORT/ FINAL REPORTING DOCUMENTS/ FINAL DATA REPORTING CORRECTIONS April, May, June July, August, September 2017 10/12/17 11/04/17 01/05/18 INVOICES/ PROGRESS REPORT October2022 8/31/2022 11/30/2022 9/30/2022 12/31/2022 9/30/2022 ADMINISTRATIVE CLOSE-OUT PERIOD INVOICE (FINAL) July, November, December 2017 01/11/18 02/01/18 04/05/18 INVOICES/ PROGRESS REPORT January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2018 07/13/18 08/03/18 August 2022 10/31/2022 11/30/2022 *Based on 21 processing 45 calendar days for DHCS’ Accounting and the State Controller’s Office, per the California Prompt Payment Act.
Appears in 1 contract
Sources: Allocation Agreement
Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis using a completed Outreach and Enrollment Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, Attachment 1 Work Plan, Attachment 2 Outreach and Enrollment Quarterly Invoice, Attachment 3 Quarterly Progress Report, Attachment 4 Annual Budget Report, Attachment 5
2. County shall submit all documentation for Allocation completion and final reimbursement within 90 days of Allocation completion, but no later than the end of the Project Performance Period as shown on page one (1).
3. Payments shall be on the basis of costs incurred.
4. Advance Allocation payment without an invoice is not allowed. 03/27/14 BUDGET / CAP Invoice for development of Budge Plan 04/03/14 TBD 04/10/14 WORK PLAN N/A 04/17/14 04/30/14 07/07/14 1ST ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT March, April, May, June 2014 07/11/14 08/01/14 10/03/14 INVOICES/ PROGRESS REPORT July, August, September 2014 10/09/14 10/30/14 01/06/15 INVOICES/ PROGRESS REPORT October, November, December 2014 01/12/15 02/02/15 04/07/15 INVOICES/ PROGRESS REPORT January, February, March 2015 04/13/15 05/04/15 07/07/15 2ND ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2015 07/13/15 08/03/15 10/06/15 INVOICES/ PROGRESS REPORT July, August, September 2015 10/12/15 11/02/15 01/05/16 INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 INVOICES/ PROGRESS REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2017 07/13/17 08/03/17 10/06/17 INVOICES/ PROGRESS REPORT July, August, September 2017 10/12/17 11/04/17 01/05/18 INVOICES/ PROGRESS REPORT October, November, December 2017 01/11/18 02/01/18 04/05/18 INVOICES/ PROGRESS REPORT January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2018 07/13/18 08/03/18 *Based on 21 processing days for DHCS’ Accounting and the State Controller’s Office.
Appears in 1 contract
Sources: Allocation Agreement
Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis basis, using a completed Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, A3 - Attachment 1 Work Plan, A3 - Attachment 2 Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3 Quarterly Progress Navigators Project Data Report, Attachment 4 Annual Budget Quarterly Progress Report, Attachment 5
2. The County shall submit all documentation for Allocation completion and final reimbursement within 90 have 60 days of Allocation completion, but no later than from the end of the Project Performance Period as shown stated on page one (1)) to close out all its administrative activities. The County shall have 30 days upon the termination of the Administrative Close-Out Period stated on page one
(1) to submit their final invoice to be reimbursed for the administrative activities completed during this period. DHCS shall issue final reimbursement within 60 days of receiving the County’s timely final invoice for administrative activities.
3. Payments shall be on the basis of costs incurred.
4. Advance payment for the Allocation payment without an invoice is not allowed. 01/05/16 11/15/2019 BUDGET / CAP Invoice for development of Budget Plan 12/31/2019 N/A 11/15/2019 WORK PLAN N/A 12/31/2019 N/A 4/30/2020 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2020 5/30/2020 6/30/2020 7/31/2020 ALL REMAINING SFY 2019-20 INVOICES/ PROGRESS REPORT April, May, June 2020 8/31/2020 9/30/2020 10/31/2020 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2020 11/30/2020 12/31/2020 1/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 2020 2/28/2021 3/31/2021 4/30/2021 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd ANNUAL BUDGET REPORT / 2021 5/30/2021 6/30/2021 7/31/2021 ALL REMAINING SFY 2020-21 INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 2021 8/31/2021 9/30/2021 10/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 2021 11/30/2021 12/31/2021 1/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 2021 3/31/2022 4/30/2022 4/30/2022 QUARTERLY January, 5/30/2022 6/30/2022 INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th ANNUAL BUDGET REPORT / 2022 7/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT REPORT/ ALL REMAINING SFY 2021-22 INVOICE(S)/ April, May, June 2017 07/13/17 08/03/17 10/06/17 INVOICES/ 2022 8/31/2022 9/30/2022 8/31/2022 10/31/2022 QUARTERLY PROGRESS REPORT REPORT/ FINAL REPORTING DOCUMENTS/ FINAL DATA REPORTING CORRECTIONS April, May, June July, August, September 2017 10/12/17 11/04/17 01/05/18 INVOICES/ PROGRESS REPORT October2022 8/31/2022 11/30/2022 9/30/2022 12/31/2022 9/30/2022 ADMINISTRATIVE CLOSE-OUT PERIOD INVOICE (FINAL) July, November, December 2017 01/11/18 02/01/18 04/05/18 INVOICES/ PROGRESS REPORT January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2018 07/13/18 08/03/18 August 2022 10/31/2022 11/30/2022 *Based on 21 processing 45 calendar days for DHCS’ Accounting and the State Controller’s Office, per the California Prompt Payment Act. County is required to use the Budget Plan, A3 – Attachment 1. As outlined in the Quarterly Invoice, Deliverables and Payment Schedule above, a revised Budget Plan must be submitted to, and approved by, DHCS in order to receive the initial payment Allocation. County is required to use the Work Plan, A3 – Attachment 2. As outlined in the Quarterly Invoice, Deliverable and Payment Schedule noted above, a Work Plan must be submitted to DHCS in order to receive the second quarterly payment. The Work Plan shall include strategies, milestones, and timeframes for outreach, enrollment and retention activities completed by the County and its contracted CBOs. County is required to use the Navigators Project Invoice, Attachment 3. Invoices must be submitted by the County on a quarterly basis as outlined in the Quarterly Payment and Deliverable Schedule noted above. The Invoice must include detailed budget activity and expenditures for the specific quarter. Please note: To receive the initial payment Allocation, County must submit both an approved Budget Plan and an Invoice. County is required to use the Navigators Project Data Report, Attachment 4, or other reporting method as directed by the State. The County is required to submit monthly updates for specific data points regarding the Health Navigators Project, which will be reviewed by the State and subsequently published for public consumption.
Appears in 1 contract
Sources: Allocation Agreement
Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis using a completed Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, Attachment 1 Work Plan, Attachment 2 Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3 Quarterly Progress Navigators Project Data Report, Attachment 4 Annual Budget Quarterly Progress Report, Attachment 5
2. County shall submit all documentation for Allocation completion within 90 days, and final reimbursement within 90 60 days of Allocation completion, but no later than the end of the Project Performance Period as shown on page one (1).
3. Payments shall be on the basis of costs incurred.
4. Advance payment for the Allocation payment without an invoice is not allowed. 01/05/16 11/15/2019 BUDGET / CAP Invoice for development of Budget Plan 12/31/2019 N/A 11/15/2019 WORK PLAN N/A 12/31/2019 N/A 4/30/2020 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2020 5/30/2020 6/30/2020 7/31/2020 1ST ANNUAL BUDGET REPORT / ALL REMAINING SFY 2019-20 INVOICES/ April, May, June 2020 8/31/2020 9/30/2020 10/31/2020 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2020 11/30/2020 12/31/2020 1/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 2020 2/28/2021 3/31/2021 4/30/2021 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd 2021 5/30/2021 6/30/2021 REPORT 7/31/2021 2ND ANNUAL BUDGET REPORT / ALL REMAINING SFY 2020-21 INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 2021 8/31/2021 9/30/2021 10/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 2021 11/30/2021 12/31/2021 1/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT ALL REMAINING SFY 2021-22 INVOICE(S)/ 3RD ANNUAL BUDGET REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2017 07/13/17 08/03/17 10/06/17 INVOICES/ PROGRESS REPORT July, August, September 2017 10/12/17 11/04/17 01/05/18 INVOICES/ PROGRESS REPORT October, November, December 2017 01/11/18 02/01/18 04/05/18 INVOICES/ PROGRESS REPORT January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2018 07/13/18 08/03/18 2021 3/31/2022 4/30/2022 *Based on 21 processing 45 calendar days for DHCS’ Accounting and the State Controller’s Office, per the California Prompt Payment Act.
Appears in 1 contract
Sources: Medi Cal Health Enrollment Navigators Project Agreement
Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis basis, using a completed Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, A1 - Attachment 1 Work Plan, A1 - Attachment 2 Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3 Navigators Project Data Report, Attachment 4 Quarterly Progress Report, Attachment 4 Annual Budget Report, Attachment 5A-5
2. County shall submit all documentation for Allocation completion within 90 days, and final reimbursement within 90 60 days of Allocation completion, but no later than the end of the Project Performance Period as shown on page one (1).
3. Payments shall be on the basis of costs incurred.
4. Advance payment for the Allocation payment without an invoice is not allowed. 01/05/16 INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd 7/31/2020 1ST ANNUAL BUDGET REPORT / ALL REMAINING SFY 2019-20 INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 2020 8/31/2020 9/30/2020 10/31/2020 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 INVOICES/ PROGRESS REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th 2020 11/30/2020 12/31/2020 7/31/2021 2ND ANNUAL BUDGET REPORT / ALL REMAINING SFY 2020-21 INVOICES/ PROGRESS REPORT April, May, June 2017 07/13/17 08/03/17 10/06/17 2021 8/31/2021 9/30/2021 10/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2017 10/12/17 11/04/17 01/05/18 2021 11/30/2021 12/31/2021 1/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT ALL REMAINING SFY 2021-22 INVOICE(S)/ 3RD ANNUAL BUDGET REPORT October, November, December 2017 01/11/18 02/01/18 04/05/18 2021 3/31/2022 4/30/2022 4/15/2022 QUARTERLY INVOICES/ PROGRESS REPORT ALL REMAINING SFY 2021-22 INVOICE(S)/ 3RD ANNUAL BUDGET REPORTS January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2018 07/13/18 08/03/18 2022 5/15/2022 6/30/2022 *Based on 21 processing 45 calendar days for DHCS’ Accounting and the State Controller’s Office, per the California Prompt Payment Act.
Appears in 1 contract
Sources: Allocation Agreement
Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis basis, using a completed Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, Attachment 1 A-1 Work Plan, Attachment 2 Outreach and Enrollment A-2 Navigators Project Quarterly Invoice, Attachment 3 Navigators Project Data Report, Attachment 4 Quarterly Progress Report, Attachment 4 Annual Budget Report, Attachment 5A-5
2. County shall submit all documentation for Allocation completion within 90 days, and final reimbursement within 90 60 days of Allocation completion, but no later than the end of the Project Performance Period as shown on page one (1).
3. Payments shall be on the basis of costs incurred.
4. Advance payment for the Allocation payment without an invoice is not allowed. 01/05/16 11/15/2019 BUDGET / CAP Invoice for development of Budget Plan 12/31/2019 N/A 11/15/2019 WORK PLAN N/A 12/31/2019 N/A 4/30/2020 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2020 5/30/2020 6/30/2020 7/31/2020 1ST ANNUAL BUDGET REPORT / ALL REMAINING SFY 2019-20 INVOICES/ PROGRESS REPORT April, May, June 2020 8/31/2020 9/30/2020 10/31/2020 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2020 11/30/2020 12/31/2020 1/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 2020 2/28/2021 3/31/2021 4/30/2021 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd 2021 5/30/2021 6/30/2021 7/31/2021 2ND ANNUAL BUDGET REPORT / ALL REMAINING SFY 2020-21 INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 2021 8/31/2021 9/30/2021 10/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 2021 11/30/2021 12/31/2021 1/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT ALL REMAINING SFY 2021-22 INVOICE(S)/ 3RD ANNUAL BUDGET REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2017 07/13/17 08/03/17 10/06/17 INVOICES/ PROGRESS REPORT July, August, September 2017 10/12/17 11/04/17 01/05/18 INVOICES/ PROGRESS REPORT October, November, December 2017 01/11/18 02/01/18 04/05/18 INVOICES/ PROGRESS REPORT January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT April, May, June 2018 07/13/18 08/03/18 2021 3/31/2022 4/30/2022 *Based on 21 processing 45 calendar days for DHCS’ Accounting and the State Controller’s Office, per the California Prompt Payment Act.
Appears in 1 contract
Sources: Allocation Agreement Amendment
Payment Documentation. 1. All payment requests must be submitted by the County on a quarterly basis basis, using a completed Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3. The invoice and the deliverables noted below must accompany the invoice as outlined in the Quarterly Invoice, Deliverables and Payment Schedule noted on Page 4. Budget Plan, A1 - Attachment 1 Work Plan, A1 - Attachment 2 Outreach and Enrollment Navigators Project Quarterly Invoice, Attachment 3 Quarterly Progress Navigators Project Data Report, Attachment 4 Annual Budget Quarterly Progress Report, Attachment 5
2. The County shall submit all documentation for Allocation completion and final reimbursement within 90 have 60 days of Allocation completion, but no later than from the end of the Project Performance Period as shown on page one (1).Period
3. Payments shall be on the basis of costs incurred.
4. Advance payment for the Allocation payment without an invoice is not allowed. 01/05/16 11/15/2019 BUDGET / CAP Invoice for development of Budget Plan 12/31/2019 N/A 11/15/2019 WORK PLAN N/A 12/31/2019 N/A 4/30/2020 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2020 5/30/2020 6/30/2020 7/31/2020 1ST ANNUAL BUDGET REPORT / ALL REMAINING SFY 2019-20 INVOICES/ PROGRESS REPORT April, May, June 2020 8/31/2020 9/30/2020 10/31/2020 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2020 11/30/2020 12/31/2020 1/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2015 01/11/16 02/01/16 04/05/16 2020 2/28/2021 3/31/2021 4/30/2021 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2016 04/11/16 05/02/16 07/07/16 3rd 2021 5/30/2021 6/30/2021 7/31/2021 2ND ANNUAL BUDGET REPORT / ALL REMAINING SFY 2020-21 INVOICES/ PROGRESS REPORT April, May, June 2016 07/13/16 08/03/16 10/03/16 2021 8/31/2021 9/30/2021 10/31/2021 QUARTERLY INVOICES/ PROGRESS REPORT July, August, September 2016 10/10/16 10/30/16 01/06/17 2021 11/30/2021 12/31/2021 1/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT October, November, December 2016 01/12/17 02/02/17 04/07/17 2021 3/31/2022 4/30/2022 4/30/2022 QUARTERLY INVOICES/ PROGRESS REPORT January, February, March 2017 04/13/17 05/04/17 07/07/17 4th ANNUAL BUDGET REPORT / 2022 5/30/2022 6/30/2022 7/31/2022 QUARTERLY INVOICES/ PROGRESS REPORT ALL REMAINING SFY 2021-22 INVOICE(S)/ April, May, June 2017 07/13/17 08/03/17 10/06/17 INVOICES/ 2022 8/31/2022 9/30/2022 8/31/2022 QUARTERLY PROGRESS REPORT July, August, September 2017 10/12/17 11/04/17 01/05/18 INVOICES/ PROGRESS REPORT October, November, December 2017 01/11/18 02/01/18 04/05/18 INVOICES/ PROGRESS REPORT January, February, March 2018 04/11/18 05/02/18 07/07/18 5th ANNUAL BUDGET REPORT / INVOICES/ PROGRESS REPORT REPORT/ FINAL REPORTING DOCUMENTS/ FINAL DATA REPORTING CORRECTIONS April, May, June 2018 07/13/18 08/03/18 2022 8/31/2022 9/30/2022 9/30/2022 ADMINISTRATIVE CLOSE-OUT PERIOD INVOICE (FINAL) July, August 2022 10/31/2022 11/30/2022 *Based on 21 processing 45 calendar days for DHCS’ Accounting and the State Controller’s Office, per the California Prompt Payment Act.