Other Preconstruction Services. 4.1. The services listed below are normally considered to be beyond the scope of Basic Services as defined in this Agreement, and if authorized in advance by an appropriate CPEAM and Notice to Proceed: 4.1.1. Providing technical or other special studies not otherwise specified as a Basic Service. 4.1.2. Providing services relative to future facilities, systems and equipment not intended to be constructed during the construction phase. 4.1.3. Providing investigations and making detailed appraisals and valuations of existing facilities, and surveys or inventories required in connection with construction performed by County and/or for subsequent construction, temporary facilities or other contingencies required by Contract Administrator. 4.1.4. Preparing to serve or serving as an expert witness in connection with any public hearing, arbitration proceeding or legal proceeding. 4.1.5. Conducting supplemental site surveying, destructive or non-destructive testing or other investigations necessary to document the physical character of the site or existing conditions. 4.1.6. Conducting surveys and abatements of asbestos or other hazardous materials. 4.1.7. Conducting supplemental subsurface investigations and obtaining Geotechnical Data related to the site including but not limited to: Geotechnical Report, Soil Boring Report and Soils Analysis. 4.1.8. Identifying and locating utilities and building systems (including but not limited to water supplies, sanitary and storm sewers, communications and providing services to coordinate and/or conduct tests of those various utility and building systems. 4.1.9. Providing computer and technology support beyond that specified as Basic Services including provision of hardware and software components. 4.1.10. Providing preconstruction services related to major changes in project scope as determined by Contract Administrator. 4.1.11. Any other services not otherwise included in this Agreement or those services not customarily furnished in accordance with generally accepted construction or preconstruction practice related to the project.
Appears in 2 contracts
Sources: Construction Agreement, Construction Agreement
Other Preconstruction Services. 4.1. The services listed below are normally considered to be beyond the scope of Basic Services as defined in this Agreement, and if authorized in advance by an appropriate CPEAM and Notice to Proceed:
4.1.1. Providing technical or other special studies not otherwise specified as a Basic Service.
4.1.2. Providing services relative to future facilities, systems and equipment not intended to be constructed during the construction phase.
4.1.3. Providing investigations and making detailed appraisals and valuations of existing facilities, and surveys or inventories required in connection with construction performed by County and/or or for subsequent construction, temporary facilities or other contingencies required by Contract Administrator.
4.1.4. Preparing to serve or serving as an expert witness in connection with any public hearing, arbitration proceeding or legal proceeding.
4.1.5. Conducting supplemental site surveying, destructive or non-destructive testing or other investigations necessary to document the physical character of the site or existing conditions.
4.1.6. Conducting surveys and abatements of asbestos or other hazardous materials.
4.1.7. Conducting supplemental subsurface investigations and obtaining Geotechnical Data related to the site including but not limited to: Geotechnical Report, Soil Boring Report and Soils Analysis.
4.1.8. Identifying and locating utilities and building systems (including but not limited to water supplies, sanitary and storm sewers, communications and providing services to coordinate and/or or conduct tests of those various utility and building systems.
4.1.9. Providing computer and technology support beyond that specified as Basic Services including provision of hardware and software components.
4.1.10. Providing preconstruction services related to major changes in project scope as determined by Contract Administrator.
4.1.11. Any other services not otherwise included in this Agreement or those services not customarily furnished in accordance with generally accepted construction or preconstruction practice related to the project.
Appears in 2 contracts
Sources: Construction Agreement, Construction Agreement