Common use of Operation and Maintenance Agreement Clause in Contracts

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures:  The drainage area will be carefully managed to reduce the sediment load to the underground facility.  Once a year the underground facility will be thoroughly inspected for structural issues.  Sediment must be removed from the pipe/vault system when the sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vault. The underground detention system will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. The inlet device The inlet pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or otherwise damaged (if applicable). Replace the pipe. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within the storage pipe/vault. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area of the vault/pipe system. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving water Erosion or other signs or damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000-000-0000. The outlet device Clogging has occurred. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or replace the outlet device. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify the Town of Mooresville of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expires

Appears in 1 contract

Samples: Operation and Maintenance Agreement

AutoNDA by SimpleDocs

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the underground facilityload.  Once a year the underground facility − The sedimentation chamber or forebay will be thoroughly inspected for structural issues.  Sediment must be removed from the pipe/vault system when the cleaned out whenever sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vaultexceeds six inches. The underground detention system will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inchesquarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if applicable) Sediment is present on the pavement surface. Sweep or vacuum the sediment as soon as possible. Flow diversion structure The inlet device The inlet pipe structure is clogged. Unclog the pipe. Dispose conveyance and dispose of the any sediment off-site. The pipe is cracked or otherwise damaged (if applicable). Replace the pipeoffsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within StormFilter Cartridges Cartridges not performing as designed – see Contech I&M document to determine if cartridge maintenance is required. Replace cartridges per manufacturer’s recommendations. Outlet device Clogging has occurred. Clean out the storage pipe/vaultoutlet device. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area Dispose of the vault/pipe systemsediment offsite. Retain assistance of a civil The outlet device is damaged Repair or geotechnical engineer qualified in replace the design or underground detention systemsoutlet device. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving Receiving water Erosion or other signs or of damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000919-000-0000733- 1786. The outlet device Clogging has occurredAll other operation and maintenance activities should be in accordance with the Manufacturer's Inspection and Maintenance Procedures document. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or replace the outlet device. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipeAny problems that are found shall be repaired immediately. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed aboveabove and have received and understand the Manufacturer's Inspection and Maintenance Procedures document. I agree to notify the Town of Mooresville DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expiresexpires Drainage Area Number:

Appears in 1 contract

Samples: Operation and Maintenance Agreement

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the underground facilityload.  Once a year the underground facility − The sedimentation chamber or forebay will be thoroughly inspected for structural issues.  Sediment must be removed from the pipe/vault system when the cleaned out whenever sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vaultexceeds six inches. The underground detention system will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inchesquarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if applicable) Sediment is present on the pavement surface. Sweep or vacuum the sediment as soon as possible. Flow diversion structure The inlet device The inlet pipe structure is clogged. Unclog the pipe. Dispose conveyance and dispose of the any sediment off-site. The pipe is cracked or otherwise damaged (if applicable). Replace the pipeoffsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within StormFilter Cartridges Cartridges not performing as designed – see Contech I&M document to determine if cartridge maintenance is required. Replace cartridges per manufacturer’s recommendations. Outlet device Clogging has occurred. Clean out the storage pipe/vaultoutlet device. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area Dispose of the vault/pipe systemsediment offsite. Retain assistance of a civil The outlet device is damaged Repair or geotechnical engineer qualified in replace the design or underground detention systemsoutlet device. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving Receiving water Erosion or other signs or of damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000919-000-0000733- 1786. The outlet device Clogging has occurredAll other operation and maintenance activities should be in accordance with the Manufacturer's Inspection and Maintenance Procedures document. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or replace the outlet device. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipeAny problems that are found shall be repaired immediately. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed aboveabove and have received and understand the Manufacturer's Inspection and Maintenance Procedures document. I agree to notify the Town of Mooresville DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expiresexpires Drainage Area Number:

Appears in 1 contract

Samples: Operation and Maintenance Agreement

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures:  The drainage area will be carefully managed to reduce the sediment load to the underground facility.  Once a year the underground facility will be thoroughly inspected for structural issues.  Sediment must be removed from the pipe/vault system when the sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vault. The underground detention system will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. The inlet device The inlet pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or otherwise damaged (if applicable). Replace the pipe. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within the storage pipe/vault. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area of the vault/pipe system. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving water Erosion or other signs or damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000-000-0000. The outlet device Clogging has occurred. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or replace the outlet device. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify the Town of Mooresville of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expires

Appears in 1 contract

Samples: Operation and Maintenance Agreement

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the underground facility. Once a year the underground facility will be thoroughly inspected for structural issues. Sediment must be removed from the pipe/vault system when the sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vault. The underground detention system will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. The inlet device The inlet pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or otherwise damaged (if applicable). Replace the pipe. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within the storage pipe/vault. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area of the vault/pipe system. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving water Erosion or other signs or damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000-000-0000. The outlet device Clogging has occurred. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or replace the outlet device. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify the Town of Mooresville of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expires

Appears in 1 contract

Samples: Operation and Maintenance Agreement

AutoNDA by SimpleDocs

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the underground facility. Once a year the underground facility will be thoroughly inspected for structural issues. Sediment must be removed from the pipe/vault system when the sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vault. The underground detention system will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. The inlet device The inlet pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or otherwise damaged (if applicable). Replace the pipe. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within the storage pipe/vault. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area of the vault/pipe system. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving water Erosion or other signs or damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000-000-0000. The outlet device Clogging has occurred. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or replace the outlet device. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify the Town of Mooresville of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expires

Appears in 1 contract

Samples: Operation and Maintenance Agreement

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the underground facilityStormFilter.  Once a year the underground facility − The sedimentation chamber or forebay will be thoroughly inspected for structural issues.  Sediment must be removed from the pipe/vault system when the cleaned out whenever sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vaultexceeds six inches. The underground detention StormFilter system will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inchesquarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if applicable) Sediment is present on the pavement surface. Sweep or vacuum the sediment as soon as possible. Flow diversion structure The inlet device The inlet pipe structure is clogged. Unclog the pipe. Dispose conveyance and dispose of the any sediment off-site. The pipe is cracked or otherwise damaged (if applicable). Replace the pipeoffsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within StormFilter Cartridges Cartridges not performing as designed – see Contech I&M document to determine if cartridge maintenance is required. Replace cartridges per manufacturer’s recommendations. Outlet device Clogging has occurred. Clean out the storage pipe/vaultoutlet device. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area Dispose of the vault/pipe systemsediment offsite. Retain assistance of a civil The outlet device is damaged Repair or geotechnical engineer qualified in replace the design or underground detention systemsoutlet device. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving Receiving water Erosion or other signs or of damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000919-000-0000733- 1786. The outlet device Clogging has occurredAll other operation and maintenance activities should be in accordance with Contech’s StormFilter Inspection and Maintenance Procedures document. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is damaged. Repair or replace the outlet device. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipeAny problems that are found shall be repaired immediately. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed aboveabove and have received and understand Contech’s StormFilter Inspection and Maintenance Procedures document. I agree to notify the Town of Mooresville DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expiresexpires Drainage Area Number:

Appears in 1 contract

Samples: Operation and Maintenance Agreement

Operation and Maintenance Agreement. I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures:  The drainage area will be carefully managed to reduce − Do not re-grade the vegetated receiving areas or cover them with impervious surfaces such as walkways, buildings, etc. − Do not stockpile soil, sand, mulch or other materials on the vegetated receiving area. − Immediately repair any areas that are eroding or where vegetation has died. − Immediately remove sediment load to the underground facility.  Once a year the underground facility will be thoroughly inspected for structural issues.  Sediment must be removed and debris from the pipe/vault system when the sediment accumulation depth is 6 inches or greater at any point within the storage pipe/vaultcontributing impervious surfaces. The underground detention system grassed swale will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inchesonce a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/The contributing impervious area Excess debris or sediment is present. present on the rooftop or impervious surface Remove the trash/debris or sediment as soon as possible. The gutter system (if applicable) Gutters are clogged or water is backing up out of the gutter system. Unclog and remove the debris. The inlet device The inlet pipe May need to install gutter screens to prevent future clogging. Rooftop runoff is clogged. Unclog not flowing into the pipe. Dispose gutter system Correct the positioning or installation of the sediment off-sitegutters. The pipe is cracked or otherwise damaged Replace if necessary to capture the roof runoff. Roadways & parking lots (if applicable). Replace □ Runoff flows to the pipepervious area as concentrated flow Remove any sediment or obstructions at the pavement-vegetated area interface. The structure aggregate transition area or concrete edge restraint is damaged. Make any necessary repairs cracked, settled, undercut, eroded or replace if damage is too large for repair. The underground vaults/pipes Sediment accumulation of 6 inches or more at any point within the storage pipe/vault. Remove sediment. Significant seepage or settlement accompanied by cracking within a small area of the vault/pipe system. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. Interior wall of the pipe/vault shows signs of improper joint alignment (sagging), elongation and displacement of joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion or blocking. Retain assistance of a civil or geotechnical engineer qualified in the design or underground detention systems. BMP element: Potential problem: How I will remediate the problem: The receiving water Erosion or other signs or damage have occurred at the outlet. Contact the NC Division of Water Quality 401 Oversight Unit at 000-000-0000. The outlet device Clogging has occurred. Cleanout the outlet device. Dispose of the sediment off-site. The outlet device is otherwise damaged. Repair or replace the outlet devicetransition area or concrete edge restraint. The outflow pipe pervious area Areas of bare soil and/or erosive gullies have formed Re-grade the soil if necessary to remove the gully and re-seed and water until it is cloggedestablished. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify the Town of Mooresville of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold lime and a resident one-time fertilizer application. Trees or shrubs have begun to grow Remove them. Vegetation is too short or too long. Maintain vegetation at a height of the subdivision has been named the president. County, North Carolina I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expiresapproximately three to four inches.

Appears in 1 contract

Samples: Stormwater Operation and Maintenance Agreement and Security

Time is Money Join Law Insider Premium to draft better contracts faster.