Non-Electrical tests Sample Clauses

Non-Electrical tests. Measurement of thickness of insulation. Sub clause 18.2. - Tests for determining the mechanical properties of insulation before and after ageing. Subclause18.4. - Shrinkage test for XLPE insulation. Subclause 18.17. - Hot set test. Subclause 18.12 - Water absorption test on insulation. Sub clause 18.14.
AutoNDA by SimpleDocs

Related to Non-Electrical tests

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • System Access Control Data processing systems used to provide the Cloud Service must be prevented from being used without authorization. Measures: • Multiple authorization levels are used when granting access to sensitive systems, including those storing and processing Personal Data. Authorizations are managed via defined processes according to the SAP Security Policy • All personnel access SAP’s systems with a unique identifier (user ID). • SAP has procedures in place so that requested authorization changes are implemented only in accordance with the SAP Security Policy (for example, no rights are granted without authorization). In case personnel leaves the company, their access rights are revoked. • SAP has established a password policy that prohibits the sharing of passwords, governs responses to password disclosure, and requires passwords to be changed on a regular basis and default passwords to be altered. Personalized user IDs are assigned for authentication. All passwords must fulfill defined minimum requirements and are stored in encrypted form. In the case of domain passwords, the system forces a password change every six months in compliance with the requirements for complex passwords. Each computer has a password-protected screensaver. • The company network is protected from the public network by firewalls. • SAP uses up–to-date antivirus software at access points to the company network (for e-mail accounts), as well as on all file servers and all workstations. • Security patch management is implemented to provide regular and periodic deployment of relevant security updates. Full remote access to SAP’s corporate network and critical infrastructure is protected by strong authentication.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Standard Work Week The standard work week shall be thirty-five (35) hours and is composed of five (5) consecutive standard work days.

  • Construction Phase Services 3.1.1 – Basic Construction Services

Time is Money Join Law Insider Premium to draft better contracts faster.