New Installations Clause Samples

New Installations. 2.1 If you want to install a new generating facility 2.2 Connecting a new generating facility We can, if you request, contact your distributor to arrange for the connection of your generating facility to your distributor’s network. We will do so as soon as is reasonably practicable and in accordance with any timeframes set out in applicable regulations, once we have received your request and any necessary information regarding the connection of the generating facility or about you or your supply address. Information we need will likely include: a. if we don’t already have it, acceptable identification; b. if you are a business registered for GST, and we don’t already have it, your ABN; c. confirmation of the metering arrangement at your supply address; d. if the supply address is a rental property, the details of the rental agent and of the property owner; e. any documentation required by applicable regulations dealing with the installation of such generating facilities (eg: certificate of electrical safety); and f. if necessary, confirmation that any connection forms or other forms have been completed and provided to your distributor for the connection of your generating facility to their network. We may need to pass on connection costs from your distributor in respect of the connection, and will advise at the time what these costs will be (before you need to commit to them).
New Installations. 2.1 If you want to install a new generating facility 2.2 Connecting a new generating facility a. if we don’t already have it, acceptable identification; b. if you are a business registered for GST, and we don’t already have it, your ABN; c. confirmation of the metering arrangement at your supply address; d. if the supply address is a rental property, the details of the rental agent and of the property owner; e. any documentation required by applicable regulations dealing with the installation of such generating facilities (eg: Certificate of Testing and Compliance); and f. confirmation that, if necessary, that any connection forms or other forms have been completed and provided to your distributor for the connection of your generating facility to their network. We may need to pass on connection costs from your distributor in respect of the connection, and will advise at the time what these costs will be (before you need to commit to them).
New Installations i) Generally multi-phase sockets shall be BICC Marachel type DS 16/30A or 32/50A TP + N + E wall mounting decontactors, or equal and approved, or as otherwise specified. Each decontactor or similar shall be supplied with a plug unit which shall be handed to the Employer upon Works completion and handover. 16 A units shall be fed with cable not exceeding 6mm² and 32 A units with cable not exceeding 10mm².
New Installations. The Provider shall be responsible for the testing, inspection and commissioning of every installation and for certifying that all such works comply in full with the requirements of the IEE Wiring Regulations, by issuing the Nominated Officer with a Completion Certificate, a typical format is shown in Appendix D, Figures 6a and 6b. Where an installation has been completed by either the Highway Authority or the Provider and is awaiting a new electrical service connection by the DNO, the tails shall be left ready for connection and tested so far as is possible. Attached to the tails shall be a signed and dated “temporary” durable label indicating to the DNO that such testing has been undertaken, including the value of the readings for the insulation resistance and continuity tests. Refer to Appendix D, Figure 7. The tails left for connection shall include a minimum 6mm2 earth bond to the earth terminal block. Once the DNO has installed the electrical supply the Provider shall, within 5 working days of notification by the DNO or the Nominated Officer, complete the testing and commissioning.
New Installations. The work included in this section is for the installation of High Pressure Sodium Fixtures and tapered elliptical aluminum arms at locations as specified. Installations shall be on existing or new poles at the specified location or the nearest pole thereto. If the standard height cannot be attained due to a conflict with other facilities, the mounting height shall be adjusted accordingly, but in no case, lower than 6.4 m bracket mounting height, or as approved by the Director of Operations. The mounting height along Regional Roads will be no lower than 10 m.
New Installations. DPLE shall invoice the Municipality for charges for new installations within ten (10) days after the completion of the new installation. The Municipality shall pay any charges for new installations within twenty (20) days after the mailing date of the invoice. Payments received after the due date will be subject to interest at the rate of one percent (1%) per month on all balances past due, provided however, that if the Municipality contests the amount of a ▇▇▇▇, the portion of the ▇▇▇▇ which is contested in good faith will not be subject to the delayed payment charge if the Municipality notifies DPLE prior to the due date for payment of the fact that it is contesting and provides the reason why that portion of the ▇▇▇▇ is incorrect.
New Installations 

Related to New Installations

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • Installations Any special carpentry, wiring, electrical or other work, gas, steam, water and drainage connection shall be installed at Exhibitor’s expense, and in accordance with the building and Management’s direction.

  • Utility Installations Trade Fixtures Alterations 8.3.1 The term “Utility Installations” refers to all floor and window coverings, air and/or vacuum lines, power panels, electrical distribution, security and fire protection systems, communication cabling, lighting fixtures, HVAC equipment, plumbing, and fencing in or on the Premises. The term “Trade Fixtures” shall mean Lessee’s machinery and equipment that can be removed without doing material damage to the Premises. The term “Alterations” shall mean any modification of the improvements, other than Utility Installations or Trade Fixtures, whether by addition or deletion. “Lessee Owned Alterations and/or Utility Installations” are defined as Alterations and/or Utility Installations made by Lessee that are not yet owned by Lessor pursuant to Section 8.4.1.

  • Software Installation The AGENCY shall request approval in writing from the COUNTY prior to installation of any software on COUNTY computer equipment. All software installations must be supervised by COUNTY technical support staff and proof of licensing is required. Upon completion, the AGENCY is responsible for reconfiguring the computers back to the original state.

  • Lending Installations Each Lender may book its Loans at any Lending Installation selected by such Lender and may change its Lending Installation from time to time. All terms of this Agreement shall apply to any such Lending Installation and the Loans and any Notes issued hereunder shall be deemed held by each Lender for the benefit of any such Lending Installation. Each Lender may, by written notice to the Agent and the Borrower in accordance with Article XIII, designate replacement or additional Lending Installations through which Loans will be made by it and for whose account Loan payments are to be made.