Common use of MEASUREMENT AND VERIFICATION Clause in Contracts

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) energy consumption before and after project installation to verify GHG emission reductions. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description of the monitoring equipment and instrumentation which will be used. o Description of the key input parameters and output metrics which will be measured. o Description of the M&V protocol and analysis methods to be employed. o Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

AutoNDA by SimpleDocs

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculationscalculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre pre- and post post-install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations, and quantification of the benefits of the microgrid if a power outage occurred during the agreement term. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 3 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #23

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. The project by performing measurement team will use a third-party vendor for M&V of GHG and verification (M&V) energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified modified. • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project project, and include the following: o Provide all All key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all All key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified reduction goals in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) energy of fossil fuel consumption before and after project installation to verify associated GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site site(s) • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG emission and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculations): ) for each phase: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each phase to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform For each phase, perform three months (or shorter period as approved in writing by the CAM) of pre- pre-installation measurements (and calculations) based on the M&V protocol for pre- pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes for each phase, M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop For each phase, develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each phase that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG emission reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C II. C were met. • Prepare CPR Critical Project Report #2 and participate in a CPR meeting in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2.

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG emission and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement measurements (and calculations): ) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post pre- and post-data analysis. • Prepare and provide a detailed M&V Plan for project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from the FPIP Calculator Tool (Attachment 8 of the grant solicitation) of from the equipment/process/system(s)/subsystem(s), or sub-system(s) that are to be upgraded and/or replaced and/or upgraded, replaced, or modified. o Ensure installation of sub-metering equipment and data loggers for pre/pre and post data analysis. • Prepare and provide a detailed M&V Plan to include include, but not be limited toto descriptions of: o Description of the The monitoring equipment and instrumentation which that will be used. o Description of the The key input parameters and output metrics which that will be measured. o Description of the The M&V protocol and analysis methods to be employed. o Description of the The independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) calculations based on the M&V protocol for pre- pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) calculations of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include include, but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement M&V of GHG and verification (M&V) energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. subtask 1.9 (if using outside vendor) • Coordinate demonstration site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8, FPIP Calculator Tool of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which that will be used. o Description A description of the key input parameters and output metrics which that will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- pre-installation measurements (and calculations) based on the M&V protocol for pre- pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project by performing demonstration site or use third party vendor for measurement and verification (M&V) of greenhouse gas and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites. • Develop M&V protocol for pre-installation measurement (and calculations): ) following Section II.B.2 of the grant solicitation manual2: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Measurement and Verification Plan for project demonstration sites to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. pre-install • Prepare and provide a Pre-Installation M&V Measurement and Verification Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for postPost-installation Installation measurements (and or calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions. • Prepare and provide a Post-Installation M&V Measurement and Verification Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG greenhouse gas emissions that directly result from this project and include the following: project. 2GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018 xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/ o Provide all key assumptions used to estimate and determine energy and GHG greenhouse gas reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy , and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meetingbenefits to disadvantaged communities. Products: • M&V Measurement and Verification Plan (draft and final) • Pre-Installation M&V Measurement and Verification Findings Report (draft and final) • Post-Installation M&V Measurement and Verification Findings Report(s) (draft and final) • CPR Report #2)

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculationscalculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2)

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement M&V of GHG and verification (M&V) energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.91.9 (if using outside vendor). • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified modified. • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre pre- and post post-install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) Report (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement M&V of GHG and verification (M&V) energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site(s). • Develop M&V protocol for pre-installation measurement measurements (and calculations): ) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include include, but not be limited to: o Description A description of the monitoring equipment and instrumentation which that will be used. o Description A description of the key input parameters and output metrics which that will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide Provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified modified. • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include include, but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before production and after project installation to verify GHG emission reductionsconsumption. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. used o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 3 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #23

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project by performing demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement (and calculationscalculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description of the monitoring equipment and instrumentation which will be used. o Description of the key input parameters and output metrics which will be measured. o Description of the M&V protocol and analysis methods to be employed. o Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report Meeting #2.

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductions. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install installation measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install installation measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and project, which shall include the followingbut not be limited to: o Provide all All key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all All key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss Discussion of whether the energy production and GHG emission reductions identified in section Section II.C were met. • Prepare a CPR Report #2 3 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #23

Appears in 1 contract

Samples: ww2.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas emission and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) Reports (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C II. C were met. • Prepare a CPR Report #2 and participate in a CPR Meeting in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2.

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG emission and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites. • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from the FPIP California Air Resources Board benefits calculator tool of the grant solicitation) of the equipment/process/system(s)/sub-system(s)/sub- system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG emission reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in the goals and objective of this scope of work (section II.C II. C) were met. • Prepare CPR Report #2 and participate in a CPR meeting in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2.

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.91.9 (if using outside vendor). • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre pre-and post post-install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement agreements with M&V subcontractor subcontractors per Task 1.9. • Coordinate site visits with the M&V subcontractor subcontractors at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculationscalculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- pre-installation measurements (and calculations) based on the M&V protocol for pre- pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

AutoNDA by SimpleDocs

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement (and calculationscalculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.31.3 (CPR Meetings). • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor factors from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description of the monitoring equipment and instrumentation which will be used. o Description of the key input parameters and output metrics which will be measured. o Description of the M&V protocol and analysis methods to be employed. o Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months two seasons, as a seasonal facility, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project by performing demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site site(s) • Develop M&V protocol for pre-installation measurement (and calculations): ) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. ; and o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. ; o Description A description of the key input parameters and output metrics which will be measured. ; o Description A description of the M&V protocol and analysis methods to be employed. ; and o Description A description of the independent, third-party M&V measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-Installation installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2project.

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement project. Project team will use a third-party vendor for M&V of GHG and verification (M&V) energy consumption before and after project installation to verify GHG emission reductions. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of GHG and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: ww2.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) energy consumption before and after project installation to verify GHG emission reductionsproject. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculations): calculations following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. ; and o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Measurement and Verification Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. ; o Description A description of the key input parameters and output metrics which will be measured. ; o Description A description of the M&V protocol and analysis methods to be employed. ; and o Description A description of the independent, third-party M&V measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) , based on the M&V protocol for pre- installation. pre-install • Prepare and provide a Pre-Installation M&V Measurement and Verification Findings Report that which includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions. • Prepare and provide a Post-Installation M&V Measurement and Verification Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG greenhouse gas emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2project.

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculationscalculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three Gather and validate 3 months (or shorter period as approved in writing by the CAM) of pre- pre-installation measurements (and calculations) based on the M&V protocol for pre- pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-post- installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) energy consumption before and after project installation to verify GHG emission reductionsproject. The Recipient shall: • Enter into agreement with M&V Measurement and Verification (M&V) subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculations): ) following Section II.B.2 of the grant solicitation manual 3: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. ; and o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Measurement and Verification Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. ; o Description A description of the key input parameters and output metrics which will be measured. ; o Description A description of the M&V protocol and analysis methods to be employed. ; and o Description A description of the independent, third-party M&V measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installationpre-install. • Prepare and provide a Pre-Installation M&V Measurement and Verification Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • modified.  Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-post- installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include include, but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2.

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor factors from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor factors from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2section

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post- post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR a Critical Project Review Report #2 and participate in CPR meeting in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

Appears in 1 contract

Samples: www.energy.ca.gov

MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of (GHG) and energy consumption before and after project installation to verify GHG emission reductionsreduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9. 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculationscalculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o Description A description of the monitoring equipment and instrumentation which will be used. o Description A description of the key input parameters and output metrics which will be measured. o Description A description of the M&V protocol and analysis methods to be employed. o Description A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction or additions of electricity, natural gas and/or other fossil fuel usage and overall reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2:

Appears in 1 contract

Samples: www.energy.ca.gov

Time is Money Join Law Insider Premium to draft better contracts faster.