Maximum Import Capability Sample Clauses

Maximum Import Capability. Background Maximum Import Capability (“MIC”) represents deliverability for imports (any resource not physically connected inside the ISO balancing authority area (“BAA”)) and is calculated for all Scheduling Points at the ISO BAA boundary as discussed in Section 6.1.3.5 of the Business Practice Manual for Reliability Requirements. With the addition of a Subscriber Participating TO line, the ISO may have new BAA boundary points. The generation interconnected to the project will be within the ISO BAA and will not need a MIC allocation in order to count for Resource Adequacy; however, it will need to go through the generator interconnection process to get deliverability similar to any other resource internal to the ISO BAA. Deliverability for internal resources is done based on the ISO deliverability methodology irrespective of internal entitlements (those are for financial hedge and scheduling priority). MIC capability at new ISO BAA boundary points will be calculated the same as all other intertie points, based on historical schedules (not applicable in year one), portfolio needs and MIC expansion requests as allowed under the ISO tariff. The amount of available MIC at new interties will be determined as part of the annual MIC calculation process when the project is energized and every year thereafter. • Stakeholder Feedback No stakeholder comments were received on this subject. • Proposal The ISO proposes to maintain the MIC process as discussed above.
AutoNDA by SimpleDocs

Related to Maximum Import Capability

  • Packet Switching Capability 4.5.1 The packet switching capability network element is defined as the function of routing or forwarding packets, frames, cells or other data units based on address or other routing information contained in the packets, frames, cells or other data units.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Maximum Capacity The Sick Leave Bank shall accumulate unused Bank days from year to year to a maximum capacity which shall not exceed double the number of eligible employees as defined in the above Section C, Eligibility for Membership.

  • Testing Capabilities 7.2.2.10.2.1 LIS Acceptance Testing is provided where equipment is available, with the following test lines: seven-digit access to balance (100 type), milliwatt (102 type), nonsynchronous or synchronous, automatic transmission measuring (105 type), data transmission (107 type), loop-around, short circuit, open circuit, and non-inverting digital loop-back (108 type), and such other acceptance testing that may be needed to ensure that the service is operational and meets the applicable technical parameters.

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity and aircraft type

  • Minimum Necessary BA, its agents and subcontractors shall request, use and disclose only the minimum amount of Protected Information necessary to accomplish the purpose of the request, use or disclosure. [42 U.S.C. Section 17935(b); 45 C.F.R. Section 164.514(d)] BA understands and agrees that the definition of “minimum necessary” is in flux and shall keep itself informed of guidance issued by the Secretary with respect to what constitutes “minimum necessary.”

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Personnel Capabilities The Applicant should list down personnel of minimum qualification as specified in the Qualification Criteria

  • Labour Flexibility (i) An employer may direct an employee to carry out such duties as are reasonable and within the limits of the employee's skill, competence and training consistent with employee's classification, grouping and/or career stream provided that such duties are not designed to promote deskilling.

  • Outputs 11. The objectives and outcomes of this Agreement will be achieved by: