Common use of Mailboxes and Newspaper Boxes Clause in Contracts

Mailboxes and Newspaper Boxes. When removal of existing mailboxes and newspaper boxes is made necessary by construction operations, the Design-Builder shall place them in temporary locations so that access to them will not be impaired. Prior to Final Acceptance, boxes shall be placed in their permanent locations as designated by the Department and left in as good condition as when found. Boxes or their supports that are damaged through negligence on the part of the Design-Builder shall be replaced at his expense. The cost of removing and resetting existing boxes shall be included in other pay items of the Contract. New mailboxes designated in the plans shall be paid for in accordance with the provisions of Section 521 of the Specifications. 105.16—Cleanup Removal from the Project of rubbish, scrap material, and debris caused by the Design-Builder’s personnel or construction operations shall be a continuing process throughout the course of the Work. The work site shall have a neat, safe and orderly appearance at all times. Before Final Acceptance, the Highway, Borrow pits, quarries, Disposal Areas, storage areas, and all ground occupied by the Design-Builder in connection with the Work shall be cleaned of rubbish, surplus materials, and Temporary Structures, except in the case where the property is owned or controlled by the Design-Builder. All parts of the Work and the Construction Area shall be left in a neat, safe, and orderly condition. Within 30 days after Final Acceptance, the Design-Builder shall remove his Equipment, Materials and debris from the Right of Way and property adjacent to the Project that he does not own or control.

Appears in 2 contracts

Samples: Agreement, Agreement

AutoNDA by SimpleDocs

Mailboxes and Newspaper Boxes. When removal of existing mailboxes and newspaper boxes is made necessary by construction operations, the Design-Builder shall place them in temporary locations so that access to them will not be impaired. Prior to Final Acceptance, boxes shall be placed in their permanent locations as designated by the Department and left in as good the same condition as when found. Boxes or their supports that are damaged through negligence on the part of the Design-Builder shall be replaced at his expense. The cost of removing and resetting existing boxes shall be included in other pay items of the ContractContract items. New mailboxes designated in the plans shall be paid for in accordance with the provisions of Section 521 of the Specifications. 105.16—Cleanup Removal from the Project of rubbish, scrap material, and debris caused by the Design-Builder’s personnel or construction operations shall be a continuing process throughout the course of the Work. The work site shall have be kept in a neat, safe and orderly appearance condition at all times. Before Final Acceptance, the Highway, Borrow pits, quarries, Disposal Areas, storage areas, and all ground occupied by the Design-Builder in connection with the Work shall be cleaned of rubbish, surplus materials, and Temporary Structures, except in the case where the property is owned or controlled by the Design-BuilderBuilder owns or controls the property. All parts of the Work and the Construction Area shall be left in a neat, safe, and orderly condition. Within 30 thirty (30) days after Final Acceptance, the Design-Builder shall remove his Equipment, Materials and debris from the Right of Way and from property adjacent to the Project that he does not own or control.

Appears in 2 contracts

Samples: Agreement, Agreement

AutoNDA by SimpleDocs

Mailboxes and Newspaper Boxes. When removal of existing mailboxes and newspaper boxes is made necessary by construction operations, the Design-Builder shall place them in temporary locations so that access to them will not be impaired. Prior to Final Acceptance, boxes shall be placed in their permanent locations as designated by the Department and left in as good goodthe same condition as when found. Boxes or their supports that are damaged through negligence on the part of the Design-Builder shall be replaced at his expense. The cost of removing and resetting existing boxes shall be included in other pay items of the ContractContract items. New mailboxes designated in the plans shall be paid for in accordance with the provisions of Section 521 of the Specifications. 105.16—Cleanup Removal from the Project of rubbish, scrap material, and debris caused by the Design-Builder’s personnel or construction operations shall be a continuing process throughout the course of the Work. The work site shall have havebe kept in a neat, safe and orderly appearance appearancecondition at all times. Before Final Acceptance, the Highway, Borrow pits, quarries, Disposal Areas, storage areas, and all ground occupied by the Design-Builder in connection with the Work shall be cleaned of rubbish, surplus materials, and Temporary Structures, except in the case where the property is owned or controlled by the Design-BuilderBuilder owns or controls the property. All parts of the Work and the Construction Area shall be left in a neat, safe, and orderly condition. Within 30 thirty (30) days after Final Acceptance, the Design-Builder shall remove his Equipment, Materials and debris from the Right of Way and from property adjacent to the Project that he does not own or control.

Appears in 1 contract

Samples: Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.