Common use of LAND SURVEYING Clause in Contracts

LAND SURVEYING. Complaints on the land surveying services provided by MWM DesignGroup can be directed to the Texas Board of Professional Land Surveying, 12100 Park 00 Xxxxxx, Xxxxxxxx X, Xxxxx 000, Xxxxxx, Xxxxx 00000, (000) 000-0000. MWM DesignGroup TBPLS Firm Registration No.: 10065600. Approved: MWM DesignGroup, Inc. Date MWM DesignGroup Fee Calculation Page Attachment A: Page 1 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx Labor Categories PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN $290.00 $210.00 $155.00 $125.00 $90.00 $75.00 MWM DesignGroup Billable Rates MWM DesignGroup Subconsultants Subtotal by Phase Hours Fee Hours Fee Hours Fee 43.00 $ 4,455.00 $ - $ 4,455.00 40.00 $ 6,571.00 $ - $ 6,571.00 15.00 $ 2,552.00 $ - $ 2,552.00 47.00 $ 4,945.00 $ 6,850.00 $ 11,795.00 94.00 $ 10,120.00 $ 21,997.00 $ 32,117.00 4.50 $ 697.50 $ 1,540.00 $ 2,237.50 40.50 $ 5,967.50 $ 8,820.00 $ 14,787.50 4.00 $ 620.00 $ 740.00 $ 1,360.00 288.00 $ 35,928.00 $ 39,947.00 $ 75,875.00 $ 3,000.00 $ - $ 3,000.00 Professional Fees per Phase (see attached Backup) Schematic Design Survey Phase ROW Survey Phase Profile Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) Xxxx Xxxxxx Encotech Subtotal by Phase Hours Fee Hours Fee Hours Fee $ - $ - $ - $ 6,850.00 $ - $ 6,850.00 $ 8,497.00 $ 13,500.00 $ 21,997.00 $ 740.00 $ 800.00 $ 1,540.00 $ 5,320.00 $ 3,500.00 $ 8,820.00 $ 740.00 $ - $ 740.00 - $ 22,147.00 - $ 17,800.00 $ 39,947.00 $ - $ - $ - Primary Subconsultant Fees per Phase (see attached Backup) Schematic Design Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) MWM DesignGroup Fee Calculation Page Attachment A: Page 2 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Schematic Design Attend each project design meeting (2 meetings) Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance (integral with preparation of schematic design) Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Completion and documentation of internal QAQC review and response Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Prepare, for approval by the OWNER, Schematic Design Documents Y 0.00 0.00 1.00 0.00 32.00 0.00 33.00 Prepare preliminary specifications for the OWNER's review Y 0.00 0.00 1.00 0.00 2.00 0.00 3.00 Hours Subtotal 0.00 0.00 9.00 0.00 34.00 0.00 43.00 Subtotal (hours * rate) $ - $ - $ 1,395.00 $ - $ 3,060.00 $ - $ 4,455.00 FIELD SET PANELS GPS CONTROL/RTK 1 3 HORIZONTAL CONTROL 1 3 VERTICAL CONTROL IP SEARCH 1 1 8 TOPO MH/INLET INVERTS STAKE ROW 2 3 SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 4 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH 1 2 PLATS & DEED CAD 2 BOUNDARY ANALYZE/ADJUST 1 4 CLOSURE/AREA CALCS. PARCEL PLAT/XXXXX SKETCH 2 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER TOTAL HOURS 4 15 0 21 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $1,096.00 $2,115.00 $0.00 $3,360.00 SUBTOTAL = $6,571.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $6,571.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls FIELD SET PANELS GPS CONTROL/RTK HORIZONTAL CONTROL VERTICAL CONTROL 1 3 IP SEARCH TOPO Profile 1 4 MH/INLET INVERTS STAKE ROW SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 2 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH PLATS & DEED CAD BOUNDARY ANALYZE/ADJUST CLOSURE/AREA CALCS. PARCEL PLAT/SUREY SKETCH 1 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER 2 TOTAL HOURS 2 4 0 9 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $548.00 $564.00 $0.00 $1,440.00 SUBTOTAL = $2,552.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $2,552.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Design Development Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Prepare for OWNER's approval, Design Development Documents Y 0.00 0.00 4.00 0.00 32.00 0.00 36.00 Prepare detailed specifications and to the OWNER for review Y 0.00 0.00 1.00 0.00 4.00 0.00 5.00 Prepare Class B Opinion of Probable Construction Cost Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Hours Subtotal 0.00 0.00 11.00 0.00 36.00 0.00 47.00 Subtotal (hours * rate) $ - $ - $ 1,705.00 $ - $ 3,240.00 $ - $ 4,945.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Construction Documents Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Assist OWNER with selection of colors for finishes, furniture, equipment, etc. Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 prepare Construction Documents in compliance with the OWNER's requirements Y 0.00 0.00 2.00 0.00 64.00 0.00 66.00 Record the major proceedings of each meeting with TDLR and submit reports Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Furnish five sets of Construction Documents at two intervals for OWNER review Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Prepare Class A Opinion of Probable Construction Cost Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Make final modifications and corrections to Construction Documents Y 0.00 0.00 2.00 0.00 2.00 0.00 4.00 Building Permit processing Y 0.00 0.00 8.00 0.00 0.00 2.00 10.00 Furnish Bid Documents to OWNER at least 14 days prior to advertisement Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hours Subtotal 0.00 0.00 26.00 0.00 66.00 2.00 94.00 Subtotal (hours * rate) $ - $ - $ 4,030.00 $ - $ 5,940.00 $ 150.00 $ 10,120.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Bid-Award-Execution Phase Services Participate in or conduct a pre-bid conference Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare addenda Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Attend bid opening Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Hours Subtotal 0.00 0.00 4.50 0.00 0.00 0.00 4.50 Subtotal (hours * rate) $ - $ - $ 697.50 $ - $ - $ - $ 697.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Construction Phase Services Attend and draft complete minutes of each project construction meeting Y 0.00 0.00 24.00 0.00 0.00 0.00 24.00 Participate in and document the proceedings of the preconstruction conference Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Visit the site to observe the progress and quality of the work Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Review and evaluate the Contractor's Applications for Payment Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Respond within 7 days to all equests for information, claims, disputes… Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Review, approve, or take other appropriate action upon Contractor submittals Y 0.00 0.00 4.00 0.00 0.00 2.00 6.00 Within twenty-four (24) hours of the OWNER's inspection, provide punchlist Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Prepare and issue a certificate of Substantial Completion within 3 days Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Make an on-site review within 7 days of notice of final completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Hours Subtotal 0.00 0.00 38.50 0.00 0.00 2.00 40.50 Subtotal (hours * rate) $ - $ - $ 5,967.50 $ - $ - $ 150 $ 5,967.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Post-Construction Phase Services Assist and represent the OWNER with malfunctions or deficiencies of the Work Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Require subconsultants to provide assistance as stipulated in the approved RAP Y 0.00 Perform an on-site review of the Work at one year anniversary of completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare list of items needing correction and direct the Contractor to resolve them Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 After determining that deficiencies have been corrected, notify OWNER Y 0.00 0.00 0.50 0.00 0.00 0.00 0.50 Hours Subtotal 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Subtotal (hours * rate) $ - $ - $ 620.00 $ - $ - $ 620.00 April 4, 0000 Xxxx Xxxxxx Senior Project Architect, MWM Design Group 000 Xxxx Xxxxxxxx Xxxxx Xxxxxx, XX 00000 P: (000) 000-0000 E: xxxxx@xxxxxxxxxxxxxx.xxx Re: Xxxxxxxxxx County Xxxxxxxx’x Facility —Hutto, TX Mechanical & Electrical Engineering and Design Services Vehicle Building and Storage Building Dear Xxxx, Encotech Engineering Consultants, the “Engineer,” is pleased to submit this proposal for services on the above referenced project to MWM Design Group, the “Client.” SCOPE Xxxxxxxxxx County Sherriff’s Facility , the “Project,” consists of a new pre-fabricated ammunition storage building and a new vehicle storage building located on adjacent properties on Xxxxxxxx Road in Hutto, TX. The scope of work for the single story 20’ x 30’ prefabricated new ammunition storage building will be electrical only. The mechanical systems will already be installed, and no plumbing engineering and design services is required. The building’s lights and receptacles will come prefabricated within as a “plug and play” application which will require a single connection from the site’s utility power. It is understood that this building shall come equipped with a predesigned fire protection/fire suppression system designed by Others. The scope of work for the new single story two bay vehicle storage building will be mechanical and electrical only. There is no plumbing engineering and design services required for this building. Both buildings will be designed, permitted, and constructed as a single package/project. The estimated project schedule includes three (3) months for design and four (4) months for construction. BASIC SERVICES Basic Services include engineering and design services to prepare design documents. Basic Services shall include:

Appears in 2 contracts

Samples: agenda.wilco.org, agenda.wilco.org

AutoNDA by SimpleDocs

LAND SURVEYING. Complaints on the land surveying services provided by MWM DesignGroup can be directed to the Texas Board of Professional Land Surveying, 12100 Park 00 Xxxxxx, Xxxxxxxx X, Xxxxx 000, Xxxxxx, Xxxxx 00000, (000) 000-0000. MWM DesignGroup TBPLS Firm Registration No.: 10065600. Approved: MWM DesignGroup, Inc. Date MWM DesignGroup Fee Calculation Page Attachment A: Page 1 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx Labor Categories PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN $290.00 $210.00 $155.00 $125.00 $90.00 $75.00 MWM DesignGroup Billable Rates MWM DesignGroup Subconsultants Subtotal by Phase Hours Fee Hours Fee Hours Fee 43.00 $ 4,455.00 $ - $ 4,455.00 40.00 $ 6,571.00 $ - $ 6,571.00 15.00 $ 2,552.00 $ - $ 2,552.00 47.00 $ 4,945.00 $ 6,850.00 $ 11,795.00 94.00 $ 10,120.00 $ 21,997.00 $ 32,117.00 4.50 $ 697.50 $ 1,540.00 $ 2,237.50 40.50 $ 5,967.50 $ 8,820.00 $ 14,787.50 4.00 $ 620.00 $ 740.00 $ 1,360.00 288.00 $ 35,928.00 $ 39,947.00 $ 75,875.00 $ 3,000.00 $ - $ 3,000.00 Professional Fees per Phase (see attached Backup) Schematic Design Survey Phase ROW Survey Phase Profile Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) Xxxx Xxxxxx Encotech Subtotal by Phase Hours Fee Hours Fee Hours Fee $ - $ - $ - $ 6,850.00 $ - $ 6,850.00 $ 8,497.00 $ 13,500.00 $ 21,997.00 $ 740.00 $ 800.00 $ 1,540.00 $ 5,320.00 $ 3,500.00 $ 8,820.00 $ 740.00 $ - $ 740.00 - $ 22,147.00 - $ 17,800.00 $ 39,947.00 $ - $ - $ - Primary Subconsultant Fees per Phase (see attached Backup) Schematic Design Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) MWM DesignGroup Fee Calculation Page Attachment A: Page 2 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Schematic Design Attend each project design meeting (2 meetings) Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance (integral with preparation of schematic design) Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Completion and documentation of internal QAQC review and response Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Prepare, for approval by the OWNER, Schematic Design Documents Y 0.00 0.00 1.00 0.00 32.00 0.00 33.00 Prepare preliminary specifications for the OWNER's review Y 0.00 0.00 1.00 0.00 2.00 0.00 3.00 Hours Subtotal 0.00 0.00 9.00 0.00 34.00 0.00 43.00 Subtotal (hours * rate) $ - $ - $ 1,395.00 $ - $ 3,060.00 $ - $ 4,455.00 FIELD SET PANELS GPS CONTROL/RTK 1 3 HORIZONTAL CONTROL 1 3 VERTICAL CONTROL IP SEARCH 1 1 8 TOPO MH/INLET INVERTS STAKE ROW 2 3 SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 4 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH 1 2 PLATS & DEED CAD 2 BOUNDARY ANALYZE/ADJUST 1 4 CLOSURE/AREA CALCS. PARCEL PLAT/XXXXX SUREY SKETCH 2 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER TOTAL HOURS 4 15 0 21 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $1,096.00 $2,115.00 $0.00 $3,360.00 SUBTOTAL = $6,571.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $6,571.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls FIELD SET PANELS GPS CONTROL/RTK HORIZONTAL CONTROL VERTICAL CONTROL 1 3 IP SEARCH TOPO Profile 1 4 MH/INLET INVERTS STAKE ROW SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 2 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH PLATS & DEED CAD BOUNDARY ANALYZE/ADJUST CLOSURE/AREA CALCS. PARCEL PLAT/SUREY SKETCH 1 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER 2 TOTAL HOURS 2 4 0 9 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $548.00 $564.00 $0.00 $1,440.00 SUBTOTAL = $2,552.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $2,552.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Design Development Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Prepare for OWNER's approval, Design Development Documents Y 0.00 0.00 4.00 0.00 32.00 0.00 36.00 Prepare detailed specifications and to the OWNER for review Y 0.00 0.00 1.00 0.00 4.00 0.00 5.00 Prepare Class B Opinion of Probable Construction Cost Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Hours Subtotal 0.00 0.00 11.00 0.00 36.00 0.00 47.00 Subtotal (hours * rate) $ - $ - $ 1,705.00 $ - $ 3,240.00 $ - $ 4,945.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Construction Documents Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Assist OWNER with selection of colors for finishes, furniture, equipment, etc. Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 prepare Construction Documents in compliance with the OWNER's requirements Y 0.00 0.00 2.00 0.00 64.00 0.00 66.00 Record the major proceedings of each meeting with TDLR and submit reports Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Furnish five sets of Construction Documents at two intervals for OWNER review Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Prepare Class A Opinion of Probable Construction Cost Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Make final modifications and corrections to Construction Documents Y 0.00 0.00 2.00 0.00 2.00 0.00 4.00 Building Permit processing Y 0.00 0.00 8.00 0.00 0.00 2.00 10.00 Furnish Bid Documents to OWNER at least 14 days prior to advertisement Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hours Subtotal 0.00 0.00 26.00 0.00 66.00 2.00 94.00 Subtotal (hours * rate) $ - $ - $ 4,030.00 $ - $ 5,940.00 $ 150.00 $ 10,120.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Bid-Award-Execution Phase Services Participate in or conduct a pre-bid conference Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare addenda Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Attend bid opening Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Hours Subtotal 0.00 0.00 4.50 0.00 0.00 0.00 4.50 Subtotal (hours * rate) $ - $ - $ 697.50 $ - $ - $ - $ 697.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Construction Phase Services Attend and draft complete minutes of each project construction meeting Y 0.00 0.00 24.00 0.00 0.00 0.00 24.00 Participate in and document the proceedings of the preconstruction conference Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Visit the site to observe the progress and quality of the work Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Review and evaluate the Contractor's Applications for Payment Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Respond within 7 days to all equests for information, claims, disputes… Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Review, approve, or take other appropriate action upon Contractor submittals Y 0.00 0.00 4.00 0.00 0.00 2.00 6.00 Within twenty-four (24) hours of the OWNER's inspection, provide punchlist Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Prepare and issue a certificate of Substantial Completion within 3 days Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Make an on-site review within 7 days of notice of final completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Hours Subtotal 0.00 0.00 38.50 0.00 0.00 2.00 40.50 Subtotal (hours * rate) $ - $ - $ 5,967.50 $ - $ - $ 150 $ 5,967.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Post-Construction Phase Services Assist and represent the OWNER with malfunctions or deficiencies of the Work Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Require subconsultants to provide assistance as stipulated in the approved RAP Y 0.00 Perform an on-site review of the Work at one year anniversary of completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare list of items needing correction and direct the Contractor to resolve them Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 After determining that deficiencies have been corrected, notify OWNER Y 0.00 0.00 0.50 0.00 0.00 0.00 0.50 Hours Subtotal 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Subtotal (hours * rate) $ - $ - $ 620.00 $ - $ - $ 620.00 April 4, 0000 Xxxx Xxxxxx Senior Project Architect, MWM Design Group 000 Xxxx Xxxxxxxx Xxxxx Xxxxxx, XX 00000 P: (000) 000-0000 E: xxxxx@xxxxxxxxxxxxxx.xxx Re: Xxxxxxxxxx County Xxxxxxxx’x Sherriff’s Facility —Hutto, TX Mechanical & Electrical Engineering and Design Services Vehicle Building and Storage Building Dear Xxxx, Encotech Engineering Consultants, the “Engineer,” is pleased to submit this proposal for services on the above referenced project to MWM Design Group, the “Client.” SCOPE Xxxxxxxxxx County Sherriff’s Facility , the “Project,” consists of a new pre-fabricated ammunition storage building and a new vehicle storage building located on adjacent properties on Xxxxxxxx Road in Hutto, TX. The scope of work for the single story 20’ x 30’ prefabricated new ammunition storage building will be electrical only. The mechanical systems will already be installed, and no plumbing engineering and design services is required. The building’s lights and receptacles will come prefabricated within as a “plug and play” application which will require a single connection from the site’s utility power. It is understood that this building shall come equipped with a predesigned fire protection/fire suppression system designed by Others. The scope of work for the new single story two bay vehicle storage building will be mechanical and electrical only. There is no plumbing engineering and design services required for this building. Both buildings will be designed, permitted, and constructed as a single package/project. The estimated project schedule includes three (3) months for design and four (4) months for construction. BASIC SERVICES Basic Services include engineering and design services to prepare design documents. Basic Services shall include:

Appears in 1 contract

Samples: agenda.wilco.org

LAND SURVEYING. Complaints on the land surveying services provided by MWM DesignGroup can be directed to the Texas Board of Professional Land Surveying, 12100 Park 00000 Xxxx 00 Xxxxxx, Xxxxxxxx X, Xxxxx 000, Xxxxxx, Xxxxx 00000, (000) 000-0000. MWM DesignGroup TBPLS Firm Registration No.: 10065600. Approved: MWM DesignGroup, Inc. Date MWM DesignGroup Fee Calculation Page Attachment A: Page 1 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx Labor Categories PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN $290.00 $210.00 $155.00 $125.00 $90.00 $75.00 MWM DesignGroup Billable Rates MWM DesignGroup Subconsultants Subtotal by Phase Hours Fee Hours Fee Hours Fee 43.00 $ 4,455.00 $ - $ 4,455.00 40.00 $ 6,571.00 $ - $ 6,571.00 15.00 $ 2,552.00 $ - $ 2,552.00 47.00 $ 4,945.00 $ 6,850.00 $ 11,795.00 94.00 $ 10,120.00 $ 21,997.00 $ 32,117.00 4.50 $ 697.50 $ 1,540.00 $ 2,237.50 40.50 $ 5,967.50 $ 8,820.00 $ 14,787.50 4.00 $ 620.00 $ 740.00 $ 1,360.00 288.00 $ 35,928.00 $ 39,947.00 $ 75,875.00 $ 3,000.00 $ - $ 3,000.00 Professional Fees per Phase (see attached Backup) Schematic Design Survey Phase ROW Survey Phase Profile Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) Xxxx Xxxxxx Encotech Subtotal by Phase Hours Fee Hours Fee Hours Fee $ - $ - $ - $ 6,850.00 $ - $ 6,850.00 $ 8,497.00 $ 13,500.00 $ 21,997.00 $ 740.00 $ 800.00 $ 1,540.00 $ 5,320.00 $ 3,500.00 $ 8,820.00 $ 740.00 $ - $ 740.00 - $ 22,147.00 - $ 17,800.00 $ 39,947.00 $ - $ - $ - Primary Subconsultant Fees per Phase (see attached Backup) Schematic Design Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) MWM DesignGroup Fee Calculation Page Attachment A: Page 2 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Schematic Design Attend each project design meeting (2 meetings) Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance (integral with preparation of schematic design) Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Completion and documentation of internal QAQC review and response Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Prepare, for approval by the OWNER, Schematic Design Documents Y 0.00 0.00 1.00 0.00 32.00 0.00 33.00 Prepare preliminary specifications for the OWNER's review Y 0.00 0.00 1.00 0.00 2.00 0.00 3.00 Hours Subtotal 0.00 0.00 9.00 0.00 34.00 0.00 43.00 Subtotal (hours * rate) $ - $ - $ 1,395.00 $ - $ 3,060.00 $ - $ 4,455.00 FIELD SET PANELS GPS CONTROL/RTK 1 3 HORIZONTAL CONTROL 1 3 VERTICAL CONTROL IP SEARCH 1 1 8 TOPO MH/INLET INVERTS STAKE ROW 2 3 SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 4 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH 1 2 PLATS & DEED CAD 2 BOUNDARY ANALYZE/ADJUST 1 4 CLOSURE/AREA CALCS. PARCEL PLAT/XXXXX SKETCH 2 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER TOTAL HOURS 4 15 0 21 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $1,096.00 $2,115.00 $0.00 $3,360.00 SUBTOTAL = $6,571.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $6,571.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls FIELD SET PANELS GPS CONTROL/RTK HORIZONTAL CONTROL VERTICAL CONTROL 1 3 IP SEARCH TOPO Profile 1 4 MH/INLET INVERTS STAKE ROW SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 2 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH PLATS & DEED CAD BOUNDARY ANALYZE/ADJUST CLOSURE/AREA CALCS. PARCEL PLAT/SUREY SKETCH 1 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER 2 TOTAL HOURS 2 4 0 9 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $548.00 $564.00 $0.00 $1,440.00 SUBTOTAL = $2,552.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $2,552.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Design Development Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Prepare for OWNER's approval, Design Development Documents Y 0.00 0.00 4.00 0.00 32.00 0.00 36.00 Prepare detailed specifications and to the OWNER for review Y 0.00 0.00 1.00 0.00 4.00 0.00 5.00 Prepare Class B Opinion of Probable Construction Cost Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Hours Subtotal 0.00 0.00 11.00 0.00 36.00 0.00 47.00 Subtotal (hours * rate) $ - $ - $ 1,705.00 $ - $ 3,240.00 $ - $ 4,945.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Construction Documents Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Assist OWNER with selection of colors for finishes, furniture, equipment, etc. Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 prepare Construction Documents in compliance with the OWNER's requirements Y 0.00 0.00 2.00 0.00 64.00 0.00 66.00 Record the major proceedings of each meeting with TDLR and submit reports Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Furnish five sets of Construction Documents at two intervals for OWNER review Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Prepare Class A Opinion of Probable Construction Cost Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Make final modifications and corrections to Construction Documents Y 0.00 0.00 2.00 0.00 2.00 0.00 4.00 Building Permit processing Y 0.00 0.00 8.00 0.00 0.00 2.00 10.00 Furnish Bid Documents to OWNER at least 14 days prior to advertisement Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hours Subtotal 0.00 0.00 26.00 0.00 66.00 2.00 94.00 Subtotal (hours * rate) $ - $ - $ 4,030.00 $ - $ 5,940.00 $ 150.00 $ 10,120.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Bid-Award-Execution Phase Services Participate in or conduct a pre-bid conference Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare addenda Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Attend bid opening Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Hours Subtotal 0.00 0.00 4.50 0.00 0.00 0.00 4.50 Subtotal (hours * rate) $ - $ - $ 697.50 $ - $ - $ - $ 697.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Construction Phase Services Attend and draft complete minutes of each project construction meeting Y 0.00 0.00 24.00 0.00 0.00 0.00 24.00 Participate in and document the proceedings of the preconstruction conference Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Visit the site to observe the progress and quality of the work Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Review and evaluate the Contractor's Applications for Payment Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Respond within 7 days to all equests for information, claims, disputes… Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Review, approve, or take other appropriate action upon Contractor submittals Y 0.00 0.00 4.00 0.00 0.00 2.00 6.00 Within twenty-four (24) hours of the OWNER's inspection, provide punchlist Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Prepare and issue a certificate of Substantial Completion within 3 days Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Make an on-site review within 7 days of notice of final completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Hours Subtotal 0.00 0.00 38.50 0.00 0.00 2.00 40.50 Subtotal (hours * rate) $ - $ - $ 5,967.50 $ - $ - $ 150 $ 5,967.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Post-Construction Phase Services Assist and represent the OWNER with malfunctions or deficiencies of the Work Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Require subconsultants to provide assistance as stipulated in the approved RAP Y 0.00 Perform an on-site review of the Work at one year anniversary of completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare list of items needing correction and direct the Contractor to resolve them Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 After determining that deficiencies have been corrected, notify OWNER Y 0.00 0.00 0.50 0.00 0.00 0.00 0.50 Hours Subtotal 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Subtotal (hours * rate) $ - $ - $ 620.00 $ - $ - $ 620.00 April 4, 0000 2019 Xxxx Xxxxxx Senior Project Architect, MWM Design Group 000 Xxxx Xxxxxxxx Xxxxx XxxxxxAustin, XX 00000 TX 78752 P: (000) 000-0000 E: xxxxx@xxxxxxxxxxxxxx.xxx Re: Xxxxxxxxxx Williamson County Xxxxxxxx’x Facility —Hutto, TX Mechanical & Electrical Engineering and Design Services Vehicle Building and Storage Building Dear Xxxx, Encotech Engineering Consultants, the “Engineer,” is pleased to submit this proposal for services on the above referenced project to MWM Design Group, the “Client.” SCOPE Xxxxxxxxxx Williamson County Sherriff’s Facility , the “Project,” consists of a new pre-fabricated ammunition storage building and a new vehicle storage building located on adjacent properties on Xxxxxxxx Road in Hutto, TX. The scope of work for the single story 20’ x 30’ prefabricated new ammunition storage building will be electrical only. The mechanical systems will already be installed, and no plumbing engineering and design services is required. The building’s lights and receptacles will come prefabricated within as a “plug and play” application which will require a single connection from the site’s utility power. It is understood that this building shall come equipped with a predesigned fire protection/fire suppression system designed by Others. The scope of work for the new single story two bay vehicle storage building will be mechanical and electrical only. There is no plumbing engineering and design services required for this building. Both buildings will be designed, permitted, and constructed as a single package/project. The estimated project schedule includes three (3) months for design and four (4) months for construction. BASIC SERVICES Basic Services include engineering and design services to prepare design documents. Basic Services shall include:

Appears in 1 contract

Samples: agenda.wilco.org

LAND SURVEYING. Complaints on the land surveying services provided by MWM DesignGroup can be directed to the Texas Board of Professional Land Surveying, 12100 Park 00 Xxxxxx, Xxxxxxxx X, Xxxxx 000, Xxxxxx, Xxxxx 00000, (000) 000-0000. MWM DesignGroup TBPLS Firm Registration No.: 10065600. Approved: 12 August 2019 MWM DesignGroup, Inc. Date MWM DesignGroup Fee Calculation Page Attachment A: Page 1 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx Labor Categories PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN $290.00 $210.00 $155.00 $125.00 $90.00 $75.00 MWM DesignGroup Billable Rates MWM DesignGroup Subconsultants Subtotal by Phase Hours Fee Hours Fee Hours Fee 43.00 17.00 $ 4,455.00 1,790.00 $ - $ 4,455.00 40.00 $ 6,571.00 $ - $ 6,571.00 1,790.00 15.00 $ 2,552.00 $ - $ 2,552.00 47.00 25.50 $ 4,945.00 2,782.50 $ 6,850.00 3,169.00 $ 11,795.00 94.00 5,951.50 42.00 $ 10,120.00 4,860.00 $ 21,997.00 14,569.50 $ 32,117.00 19,429.50 4.50 $ 697.50 $ 1,540.00 1,085.00 $ 2,237.50 40.50 1,782.50 26.50 $ 5,967.50 3,627.50 $ 8,820.00 5,650.00 $ 14,787.50 4.00 9,277.50 2.50 $ 620.00 387.50 $ 740.00 - $ 1,360.00 288.00 387.50 133.00 $ 35,928.00 16,697.00 $ 39,947.00 24,473.50 $ 75,875.00 41,170.50 $ 3,000.00 $ - $ 3,000.00 Professional Fees per Phase (see attached Backup) Schematic Design Survey Phase ROW Survey Phase Profile Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) Xxxx Xxxxxx Encotech Subtotal by Phase Hours Fee Hours Fee Hours Fee $ - $ - $ - $ 6,850.00 3,169.00 $ - $ 6,850.00 3,169.00 $ 8,497.00 1,869.50 $ 13,500.00 12,700.00 $ 21,997.00 14,569.50 $ 740.00 185.00 $ 800.00 900.00 $ 1,540.00 1,085.00 $ 5,320.00 1,850.00 $ 3,500.00 3,800.00 $ 8,820.00 $ 740.00 5,650.00 $ - $ 740.00 - $ 22,147.00 - - $ 17,800.00 7,073.50 - $ 39,947.00 17,400.00 $ 24,473.50 $ - $ - $ - Primary Subconsultant Fees per Phase (see attached Backup) Schematic Design Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) MWM DesignGroup Fee Calculation Page Attachment A: Page 2 4 of 9 Date 4/16/2019 8/12/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Schematic Design Attend each project design meeting (2 meetings) Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance (integral with preparation of schematic design) Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Completion and documentation of internal QAQC review and response Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Prepare, for approval by the OWNER, Schematic Design Documents Y 0.00 0.00 1.00 2.00 0.00 32.00 12.00 0.00 33.00 14.00 Prepare preliminary specifications for the OWNER's review Y 0.00 0.00 1.00 0.00 1.00 0.00 2.00 0.00 3.00 Hours Subtotal 0.00 0.00 9.00 4.00 0.00 34.00 13.00 0.00 43.00 17.00 Subtotal (hours * rate) $ - $ - $ 1,395.00 620.00 $ - $ 3,060.00 1,170.00 $ - $ 4,455.00 FIELD SET PANELS GPS CONTROL/RTK 1 3 HORIZONTAL CONTROL 1 3 VERTICAL CONTROL IP SEARCH 1 1 8 TOPO MH/INLET INVERTS STAKE ROW 2 3 SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 4 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH 1 2 PLATS & DEED CAD 2 BOUNDARY ANALYZE/ADJUST 1 4 CLOSURE/AREA CALCS. PARCEL PLAT/XXXXX SKETCH 2 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER TOTAL HOURS 4 15 0 21 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $1,096.00 $2,115.00 $0.00 $3,360.00 SUBTOTAL = $6,571.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $6,571.00 Copy 1,790.00 MWM DesignGroup Fee Calculation Page Attachment A: Page 5 of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls FIELD SET PANELS GPS CONTROL/RTK HORIZONTAL CONTROL VERTICAL CONTROL 1 3 IP SEARCH TOPO Profile 1 4 MH/INLET INVERTS STAKE ROW SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 2 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH PLATS & DEED CAD BOUNDARY ANALYZE/ADJUST CLOSURE/AREA CALCS. PARCEL PLAT/SUREY SKETCH 1 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER 2 TOTAL HOURS 2 4 0 9 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $548.00 $564.00 $0.00 $1,440.00 SUBTOTAL = $2,552.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $2,552.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls Date 8/12/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Design Development Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Prepare for OWNER's approval, Design Development Documents Y 0.00 0.00 4.00 6.00 0.00 32.00 16.00 0.00 36.00 22.00 Prepare detailed specifications and to the OWNER for review Y 0.00 0.00 1.00 0.50 0.00 4.00 2.00 0.00 5.00 2.50 Prepare Class B Opinion of Probable Construction Cost Y 0.00 0.00 2.00 1.00 0.00 0.00 0.00 2.00 1.00 Hours Subtotal 0.00 0.00 11.00 7.50 0.00 36.00 18.00 0.00 47.00 25.50 Subtotal (hours * rate) $ - $ - $ 1,705.00 1,162.50 $ - $ 3,240.00 1,620.00 $ - $ 4,945.00 2,782.50 MWM DesignGroup Fee Calculation Page Attachment A: Page 6 of 9 Date 8/12/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Construction Documents Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Assist OWNER with selection of colors for finishes, furniture, equipment, etc. Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 prepare Construction Documents in compliance with the OWNER's requirements Y 0.00 0.00 2.00 4.00 0.00 64.00 16.00 0.00 66.00 Record the major proceedings of each meeting with TDLR and submit reports Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Furnish five sets of Construction Documents at two intervals for OWNER review Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 Prepare Class A Opinion of Probable Construction Cost Y 0.00 0.00 4.00 2.00 0.00 0.00 0.00 4.00 2.00 Make final modifications and corrections to Construction Documents Y 0.00 0.00 0.00 0.00 2.00 0.00 2.00 0.00 4.00 Building Building/Site Permit processing Y 0.00 0.00 8.00 12.00 0.00 0.00 2.00 10.00 6.00 18.00 Furnish Bid Documents to OWNER at least 14 days prior to advertisement Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hours Subtotal 0.00 0.00 26.00 18.00 0.00 66.00 2.00 94.00 18.00 6.00 42.00 Subtotal (hours * rate) $ - $ - $ 4,030.00 2,790.00 $ - $ 5,940.00 1,620.00 $ 150.00 450.00 $ 10,120.00 4,860.00 MWM DesignGroup Fee Calculation Page Attachment A: Page 7 of 9 Date 8/12/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Bid-Award-Execution Phase Services Participate in or conduct a pre-bid conference Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare addenda Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Attend bid opening Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Hours Subtotal 0.00 0.00 4.50 0.00 0.00 0.00 4.50 Subtotal (hours * rate) $ - $ - $ 697.50 $ - $ - $ - $ 697.50 MWM DesignGroup Fee Calculation Page Attachment A: Page 8 of 9 Date 8/12/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Construction Phase Services Attend and draft complete minutes of each project construction meeting Y 0.00 0.00 24.00 8.00 0.00 0.00 0.00 24.00 Participate in and document the proceedings of the preconstruction conference Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Visit the site to observe the progress and quality of the work Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 12.00 Review and evaluate the Contractor's Applications for Payment Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Respond within 7 days to all equests for information, claims, disputes… Y 0.00 0.00 4.00 2.00 0.00 0.00 0.00 4.00 2.00 Review, approve, or take other appropriate action upon Contractor submittals Y 0.00 0.00 4.00 0.00 0.00 2.00 6.00 Within twenty-four (24) hours of the OWNER's inspection, provide punchlist Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Prepare and issue a certificate of Substantial Completion within 3 days Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Make an on-site review within 7 days of notice of final completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Hours Subtotal 0.00 0.00 38.50 20.50 0.00 0.00 2.00 40.50 6.00 26.50 Subtotal (hours * rate) $ - $ - $ 5,967.50 3,177.50 $ - $ - $ 150 450.00 $ 5,967.50 3,627.50 MWM DesignGroup Fee Calculation Page Attachment A: Page 9 of 9 Date 8/12/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Post-Construction Phase Services Assist and represent the OWNER with malfunctions or deficiencies of the Work Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Require subconsultants to provide assistance as stipulated in the approved RAP Y 0.00 Perform an on-site review of the Work at one year anniversary of completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare list of items needing correction and direct the Contractor to resolve them Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 After determining that deficiencies have been corrected, notify OWNER Y 0.00 0.00 0.50 0.00 0.00 0.00 0.50 Hours Subtotal 0.00 0.00 4.00 2.50 0.00 0.00 0.00 4.00 2.50 Subtotal (hours * rate) $ - $ - $ 620.00 387.50 $ - $ - $ 620.00 April 4387.50 ATTACHMENT B August 13, 0000 2019 Xxxx Xxxxxx Senior Project Architect, MWM Design Group 000 Xxxx Xxxxxxxx Xxxxx Xxxxxx, XX 00000 P: (000) 000-0000 E: xxxxx@xxxxxxxxxxxxxx.xxx Re: Xxxxxxxxxx County Xxxxxxxx’x Sherriff’s Facility —Hutto, TX Mechanical & Electrical Engineering and Design Services Vehicle Building and Storage Building Dear Xxxx, Encotech Engineering Consultants, the “Engineer,” is pleased to submit this proposal for services on the above referenced project to MWM Design Group, the “Client.” SCOPE Xxxxxxxxxx County Sherriff’s Facility , the “Project,” consists of a new pre-fabricated ammunition storage building and a new vehicle storage building located on adjacent properties on Xxxxxxxx Road in Hutto, TX. The scope of work for the single story 20’ x 30’ prefabricated new ammunition storage building will be electrical only. The mechanical systems will already be installed, and no plumbing engineering and design services is required. The building’s lights and receptacles will come prefabricated within as a “plug and play” application which will require a single connection from the site’s utility power. It is understood that this building shall come equipped with a predesigned fire protection/fire suppression system designed by Others. The scope of work for the new single story two bay vehicle storage building will be mechanical mechanical, electrical and electrical only. There is no plumbing engineering and design services required for this building. Both buildings will be designed, permitted, and constructed as a single package/projectdescribed below. The estimated project schedule includes three (3) months for design and four (4) months for construction. BASIC SERVICES Basic Services include engineering and design services to prepare design documents. Basic Services shall include:

Appears in 1 contract

Samples: agenda.wilco.org

AutoNDA by SimpleDocs

LAND SURVEYING. Complaints on the land surveying services provided by MWM DesignGroup can be directed to the Texas Board of Professional Land Surveying, 12100 Park 00000 Xxxx 00 Xxxxxx, Xxxxxxxx X, Xxxxx 000, Xxxxxx, Xxxxx 00000, (000) 000-0000. MWM DesignGroup TBPLS Firm Registration No.: 10065600. Approved: MWM DesignGroup, Inc. Date MWM DesignGroup Fee Calculation Page Attachment A: Page 1 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx Labor Categories PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN $290.00 $210.00 $155.00 $125.00 $90.00 $75.00 MWM DesignGroup Billable Rates MWM DesignGroup Subconsultants Subtotal by Phase Hours Fee Hours Fee Hours Fee 43.00 $ 4,455.00 $ - $ 4,455.00 40.00 $ 6,571.00 $ - $ 6,571.00 15.00 $ 2,552.00 $ - $ 2,552.00 47.00 $ 4,945.00 $ 6,850.00 $ 11,795.00 94.00 $ 10,120.00 $ 21,997.00 $ 32,117.00 4.50 $ 697.50 $ 1,540.00 $ 2,237.50 40.50 $ 5,967.50 $ 8,820.00 $ 14,787.50 4.00 $ 620.00 $ 740.00 $ 1,360.00 288.00 $ 35,928.00 $ 39,947.00 $ 75,875.00 $ 3,000.00 $ - $ 3,000.00 Professional Fees per Phase (see attached Backup) Schematic Design Survey Phase ROW Survey Phase Profile Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) Xxxx Xxxxxx Encotech Subtotal by Phase Hours Fee Hours Fee Hours Fee $ - $ - $ - $ 6,850.00 $ - $ 6,850.00 $ 8,497.00 $ 13,500.00 $ 21,997.00 $ 740.00 $ 800.00 $ 1,540.00 $ 5,320.00 $ 3,500.00 $ 8,820.00 $ 740.00 $ - $ 740.00 - $ 22,147.00 - $ 17,800.00 $ 39,947.00 $ - $ - $ - Primary Subconsultant Fees per Phase (see attached Backup) Schematic Design Design Development Construction Documents Bid-Award-Execution Construction Phase Post-Construction Phase TOTALS Reimbursible Expenses (Allowance) MWM DesignGroup Fee Calculation Page Attachment A: Page 2 of 9 Date 4/16/2019 Subprojec 0000 Xxxxxxxx Xxxx TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Schematic Design Attend each project design meeting (2 meetings) Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance (integral with preparation of schematic design) Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Completion and documentation of internal QAQC review and response Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Prepare, for approval by the OWNER, Schematic Design Documents Y 0.00 0.00 1.00 0.00 32.00 0.00 33.00 Prepare preliminary specifications for the OWNER's review Y 0.00 0.00 1.00 0.00 2.00 0.00 3.00 Hours Subtotal 0.00 0.00 9.00 0.00 34.00 0.00 43.00 Subtotal (hours * rate) $ - $ - $ 1,395.00 $ - $ 3,060.00 $ - $ 4,455.00 FIELD SET PANELS GPS CONTROL/RTK 1 3 HORIZONTAL CONTROL 1 3 VERTICAL CONTROL IP SEARCH 1 1 8 TOPO MH/INLET INVERTS STAKE ROW 2 3 SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 4 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH 1 2 PLATS & DEED CAD 2 BOUNDARY ANALYZE/ADJUST 1 4 CLOSURE/AREA CALCS. PARCEL PLAT/XXXXX SKETCH 2 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER TOTAL HOURS 4 15 0 21 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $1,096.00 $2,115.00 $0.00 $3,360.00 SUBTOTAL = $6,571.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $6,571.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls FIELD SET PANELS GPS CONTROL/RTK HORIZONTAL CONTROL VERTICAL CONTROL 1 3 IP SEARCH TOPO Profile 1 4 MH/INLET INVERTS STAKE ROW SET IP'S BORE HOLES CEF/OHWM CHANNEL X-SECS TRAVEL 2 OFFICE PROCESS FIELD DATA 1 Texas811 PLATS/DEEDS/MAPS SEARCH PLATS & DEED CAD BOUNDARY ANALYZE/ADJUST CLOSURE/AREA CALCS. PARCEL PLAT/SUREY SKETCH 1 LEGAL DESCRIPTION QA_QC TITLE LETTER RPLS CLERICAL PROJ. MANAGER 2 TOTAL HOURS 2 4 0 9 HOURLY RATE x$274.00 x$141.00 x$103.00 x$160.00 SUB-TOTALS $548.00 $564.00 $0.00 $1,440.00 SUBTOTAL = $2,552.00 PLATS/DEEDS . . . . . . . . . . . . . . . = TITLE REPORT/deed research . . . . . . . . . . . . . . . = LANE CLOSURES . . . . . . . . . . . . . . . = AERIAL MAPPING . . . . . . . . . . . . . . . = LODGING . . . . . . . . . . . . . . . = MEALS . . . . . . . . . . . . . . . = MILEAGE . . . . . . . . . . . . . . . = TOTAL $2,552.00 Copy of WmCo_Sheriffs Off Training Cntr_Survey_Draft.xls TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Design Development Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Prepare for OWNER's approval, Design Development Documents Y 0.00 0.00 4.00 0.00 32.00 0.00 36.00 Prepare detailed specifications and to the OWNER for review Y 0.00 0.00 1.00 0.00 4.00 0.00 5.00 Prepare Class B Opinion of Probable Construction Cost Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Hours Subtotal 0.00 0.00 11.00 0.00 36.00 0.00 47.00 Subtotal (hours * rate) $ - $ - $ 1,705.00 $ - $ 3,240.00 $ - $ 4,945.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Design Phase Services - Construction Documents Attend each project design meeting Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Assist OWNER with selection of colors for finishes, furniture, equipment, etc. Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Investigate alternatives, question assumptions and research approaches to optimize building performance Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 prepare Construction Documents in compliance with the OWNER's requirements Y 0.00 0.00 2.00 0.00 64.00 0.00 66.00 Record the major proceedings of each meeting with TDLR and submit reports Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Furnish five sets of Construction Documents at two intervals for OWNER review Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Prepare Class A Opinion of Probable Construction Cost Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Make final modifications and corrections to Construction Documents Y 0.00 0.00 2.00 0.00 2.00 0.00 4.00 Building Permit processing Y 0.00 0.00 8.00 0.00 0.00 2.00 10.00 Furnish Bid Documents to OWNER at least 14 days prior to advertisement Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hours Subtotal 0.00 0.00 26.00 0.00 66.00 2.00 94.00 Subtotal (hours * rate) $ - $ - $ 4,030.00 $ - $ 5,940.00 $ 150.00 $ 10,120.00 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Bid-Award-Execution Phase Services Participate in or conduct a pre-bid conference Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare addenda Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Attend bid opening Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Hours Subtotal 0.00 0.00 4.50 0.00 0.00 0.00 4.50 Subtotal (hours * rate) $ - $ - $ 697.50 $ - $ - $ - $ 697.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Construction Phase Services Attend and draft complete minutes of each project construction meeting Y 0.00 0.00 24.00 0.00 0.00 0.00 24.00 Participate in and document the proceedings of the preconstruction conference Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Visit the site to observe the progress and quality of the work Y 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Review and evaluate the Contractor's Applications for Payment Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Respond within 7 days to all equests for information, claims, disputes… Y 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Review, approve, or take other appropriate action upon Contractor submittals Y 0.00 0.00 4.00 0.00 0.00 2.00 6.00 Within twenty-four (24) hours of the OWNER's inspection, provide punchlist Y 0.00 0.00 2.00 0.00 0.00 0.00 2.00 Prepare and issue a certificate of Substantial Completion within 3 days Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Make an on-site review within 7 days of notice of final completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Hours Subtotal 0.00 0.00 38.50 0.00 0.00 2.00 40.50 Subtotal (hours * rate) $ - $ - $ 5,967.50 $ - $ - $ 150 $ 5,967.50 TASK DESCRIPTION INCLUDED AS BASIC SERVICES PRINCIPAL SR PROJECT MANAGER LICENSED PROF II ARCH SUPPORT STAFF II ARCH SUPPORT STAFF I TECHNICIAN TOTAL Post-Construction Phase Services Assist and represent the OWNER with malfunctions or deficiencies of the Work Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 Require subconsultants to provide assistance as stipulated in the approved RAP Y 0.00 Perform an on-site review of the Work at one year anniversary of completion Y 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Prepare list of items needing correction and direct the Contractor to resolve them Y 0.00 0.00 1.00 0.00 0.00 0.00 1.00 After determining that deficiencies have been corrected, notify OWNER Y 0.00 0.00 0.50 0.00 0.00 0.00 0.50 Hours Subtotal 0.00 0.00 4.00 0.00 0.00 0.00 4.00 Subtotal (hours * rate) $ - $ - $ 620.00 $ - $ - $ 620.00 April 4, 0000 2019 Xxxx Xxxxxx Senior Project Architect, MWM Design Group 000 Xxxx Xxxxxxxx Xxxxx XxxxxxAustin, XX 00000 TX 78752 P: (000) 000-0000 E: xxxxx@xxxxxxxxxxxxxx.xxx Re: Xxxxxxxxxx County Xxxxxxxx’x Facility —Hutto, TX Mechanical & Electrical Engineering and Design Services Vehicle Building and Storage Building Dear Xxxx, Encotech Engineering Consultants, the “Engineer,” is pleased to submit this proposal for services on the above referenced project to MWM Design Group, the “Client.” SCOPE Xxxxxxxxxx County Sherriff’s Facility , the “Project,” consists of a new pre-fabricated ammunition storage building and a new vehicle storage building located on adjacent properties on Xxxxxxxx Road in Hutto, TX. The scope of work for the single story 20’ x 30’ prefabricated new ammunition storage building will be electrical only. The mechanical systems will already be installed, and no plumbing engineering and design services is required. The building’s lights and receptacles will come prefabricated within as a “plug and play” application which will require a single connection from the site’s utility power. It is understood that this building shall come equipped with a predesigned fire protection/fire suppression system designed by Others. The scope of work for the new single story two bay vehicle storage building will be mechanical and electrical only. There is no plumbing engineering and design services required for this building. Both buildings will be designed, permitted, and constructed as a single package/project. The estimated project schedule includes three (3) months for design and four (4) months for construction. BASIC SERVICES Basic Services include engineering and design services to prepare design documents. Basic Services shall include:

Appears in 1 contract

Samples: agenda.wilco.org

Time is Money Join Law Insider Premium to draft better contracts faster.