IRONMONGERY SUPPLEMENTARY PREAMBLES Sample Clauses

IRONMONGERY SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" CATCHES, CABIN, HOOKS, ETC Approved: 1 150mm Cabin hook and eye including 70 x 70 x 20mm chamfered hardwood block twice oiled and plugged No 2 LOCKS Approved: 2 Three lever mortice lockset No 2 3 Indicator lockset No 4 DOORSTOPS Approved: 4 38mm Diameter rubber door stop plugged No 6 LETTERS, NAMEPLATES, ETC. "Union" or similar approved: 5 75 x 150mm Natural anodised aluminium plate with male or female symbol No 2 Carried Forward Section No. 2 SFD4 Bill No. 7 IRONMONGERY BVI CONSULTING ENGINEERS R Brought Forward R
AutoNDA by SimpleDocs
IRONMONGERY SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" CATCHES, CABIN, HOOKS, ETC Approved: 1 150mm Cabin hook and eye including 70 x 70 x 20mm chamfered hardwood block twice oiled and plugged No 1 LOCKS Approved: 2 Three lever mortice lockset No 1 3 Indicator lockset No 2 DOORSTOPS Approved: 4 38mm Diameter rubber door stop plugged No 3 LETTERS, NAMEPLATES, ETC. "Union" or similar approved: 5 75 x 150mm Natural anodised aluminium plate with male or female symbol No 1 BATHROOM FITTINGS Carried Forward Section No. 3 F2 BLOCK Bill No. 7 IRONMONGERY MANKGA LERAGA CONSULTING R Brought Forward R "Xxxxxxxxx-Xxxxx"or Simlilar: 6 "Xxxxxxxx Xxxxx" SQ2 code 405607B white lockable toilet roll holder No 2 Sundries: 7 Female SHE BIN plugged to walls No 1 Carried Forward to Summary of Section No. 3 Section No. 3 F2 BLOCK Bill No. 7 IRONMONGERY MANKGA LERAGA CONSULTING R Item Quantity Rate Amount
IRONMONGERY SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" CATCHES, CABIN, HOOKS, ETC Approved 1 150mm Cabin hook and eye including 70 x 70 x 20mm chamfered hardwood block twice oiled and plugged No 3 LOCKS Approved 2 Three lever mortice lockset No 1 3 Indicator lockset No 3 HANDLES Aluminium Pull Handle 4 Set of two, 300mm pull handles fixed back to back on doors No 3 DOORSTOPS Approved 5 38mm Diameter rubber door stop plugged No 4 Carried Forward R R Brought Forward LETTERS, NAMEPLATES, ETC. "Union" or similar approved 6 75 x 150mm Natural anodised aluminium plate with male or female symbol No 2
IRONMONGERY SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to used - PW 371" CATCHES, CABIN HOOKS, ETC "Approved" 1 150mm chrome cabin hook and eye including 70 x 70 x 20mm chamfered hardwood block twice oiled and plugged. No 1 LOCKS "Union Assa Abloy" or similar approved: 2 Four lever lockset No 1 3 "Ref. CZ80941SC" Indicator bolt No 4 LETTERS, NAMEPLATES, ETC "Dorma" or similar approved 4 DSS-130 Engraved "Male" information sign No 1 SUNDRIES 5 25mm Diameter wall mounted door stop plugged No 3 BATHROOM FITTINGS Carried Forward Section No. 4 Type SM4 Bill No. 7 Ironmongery PREPARED BY: NYELETI CONSULTING (PTY) LTD R Brought Forward R

Related to IRONMONGERY SUPPLEMENTARY PREAMBLES

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount

  • MODEL PREAMBLES The tenderer is referred to the "Model Preambles for Trades 2008" for supplementary and comprehensive expansion of descriptions, appropriate provision for which shall be deemed to have been included in all relevant rates SUPPLEMENTARY PREAMBLES Proprietary products in descriptions: Proprietary products shall be used as specified. Substitute products of similar quality and specification may only be used with prior approval by the Principal Agent. Nature of material to be excavated: The material to be excavated is assumed to be predominantly of a composition that will allow excavation in "earth" as specified, but including a percentage of excavation in "soft rock" and "hard rock". Carting away of excavated material: Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations, or alternatively, from stock piles situated on the building site. Carried to Collection R

  • Supplementary Agreement The parties stipulate and agree that the escrow provisions in this Section 6(b) (Escrow Establishment) of Attachment B (Facility Owned by Seller) and the Source Code Escrow Agreement and Proceeds Escrow Agreement are "supplementary agreements" as contemplated in Section 365(n)(1)(B) of the Code. In any voluntary or involuntary bankruptcy proceeding involving Seller, failure by Company to assert its rights to "retain its rights" to the intellectual property encompassed by the Source Code or the funds in the Proceeds Escrow, pursuant to Section 365(n)(1)(B) of the Code, under an executory contract rejected in a bankruptcy proceeding, shall not be construed as an election to terminate the contract by Company under Section 365(n)(1)(A) of the Code.

  • Supplementary Agreements II.13.1 Any amendment to the grant conditions must be the subject of a written supplementary agreement. No oral agreement may bind the parties to this effect.

  • Supplementary Terms Other Contributions

  • Annexes, Appendices and Footnotes The annexes, appendices and footnotes to this Agreement constitute an integral part of this Agreement.

  • Master Definitions Supplement All terms and expressions used in this Agreement shall have the same meaning as those contained in the Master Definitions Supplement to the CAISO Tariff.

  • REPLACEMENT OF NOTES, COUPONS AND TALONS Should any Note, Coupon or Talon be lost, stolen, mutilated, defaced or destroyed, it may be replaced at the specified office of the Agent upon payment by the claimant of such costs and expenses as may be incurred in connection therewith and on such terms as to evidence and indemnity as the Issuer may reasonably require. Mutilated or defaced Notes, Coupons or Talons must be surrendered before replacements will be issued.

  • Appendix B Amendments The following Appendix B clauses are hereby amended as follows:

  • Second Schedule Second Schedule THIS AGREEMENT under seal made the twenty-seventh day of October One thousand nine hundred and sixty-four BETWEEN THE HONOURABLE XXXXX XXXXX, M.L.A. Premier and Treasurer of the State of Western Australia acting for and on behalf of the said State and instrumentalities thereof from time to time (hereinafter called “the State”) of the one part and HAMERSLEY IRON PTY. LIMITED a company incorporated under the Companies Xxx 0000 of the State of Victoria and having its registered office and principal place of business in that State at 00 Xxxxxxx Xxxxxx Melbourne and its registered office in the State of Western Australia at 37 Saint George’s Terrace Perth (hereinafter called “the Company” which expression will include the successors and assigns of the Company including where the context so admits the assignees and appointees of the Company under clause 20 of the agreement hereinafter referred to) of the other part.

Time is Money Join Law Insider Premium to draft better contracts faster.