Interconnector Sample Clauses

Interconnector. On or before [date], Interconnector shall have received and accepted from any and all applicable governmental entities all material authorizations necessary for the construction and operation of Interconnector’s Facilities.
AutoNDA by SimpleDocs
Interconnector. Connected System Exit Point at (the "CSEP") We are a Downstream Capacity Holder (as defined in the Moffat Ancillary Agreement dated and amended and restated with effect from relating to the CSEP). We hereby authorise a User under the Network Code and a CSEP User under such Ancillary Agreement) to apply for and hold NTS Exit Capacity at the Firm Sub-CSEP. The amount of NTS Exit Capacity which the CSEP User may apply for at the Firm Sub-CSEP shall not exceed kWh/Day. The period during which the CSEP User may hold NTS Exit Capacity at the Firm Sub-CSEP shall be the period from to . We may withdraw or amend this certificate by giving notice of not less than 10 days to National Grid Gas specifying such withdrawal or amendment (but only with effect from the expiry of the capacity period of any then prevailing registration of NTS Exit Capacity made in pursuance of this certificate). This certificate shall not give rise to any obligation or liability as between us and National Grid Gas. National Grid Gas may disclose this certificate to the CSEP User, and inform the CSEP User of any revision or withdrawal of this certificate. Dated: .......................................... Signed: .......................................... Annex B-2 Form of Sub-CSEP Transfer Certificate From: of To: NATIONAL GRID GAS plc ("National Grid Gas")
Interconnector. Is the asset used to interconnect two Transmission Owner’s electrical systems, normally across the border of two countries.
Interconnector. Address: 00 – 00 Xxxxxxxxxx Xxxxxx, Xxxxxx, XX0X 0XX Attn: Commercial Manager Email: xxxxxxxxxx@xxxxxxxxxxxxxx.xxx Storage User Address: [ ● ] Attn: [ ● ] Email: [ ● ]
Interconnector. 1 9.1.3 The Parties further agree that the commercial operation (in-service) date for all 2 of the additional 700 MW increase in the capacity of the Generating Facility 3 described in section 2.6 above shall be in accordance with the dates set forth 4 in Exhibit A, including the firm deadline of October 31, 2017 for the commercial 5 operation (in-service) of the additional 700 MW capacity, inasmuch as the 6 Generation Developer has demonstrated that engineering, permitting, and 7 construction will take more than seven years. Interconnector's failure to meet 8 the final in-service date identified within Exhibit A will result in automatic 9 reformation of this Agreement to limit the maximum permitted capacity to the 10 amount then installed and placed in-service at the time of that final in- service

Related to Interconnector

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

Time is Money Join Law Insider Premium to draft better contracts faster.