Installation, Testing and Commissioning Clause Samples

POPULAR SAMPLE Copied 2 times
Installation, Testing and Commissioning. 3.7.1 The Contractor warrants that it shall fully acquaint itself with the Institution’s structural, electrical and other requirements shall install the Equipment without any additional charge, as directed by the Institution. The installation, testing and commissioning of the Equipment shall be conducted in accordance with the Requirements and where necessary, in the presence and to the satisfaction of, Personnel designated by and representing the Institution. Where applicable, the Contractor shall conduct all quality control testing necessary to ensure the level of quality in conformance in all respects to the Requirements. 3.7.2 Delivery of the Equipment must be complete. Where the Equipment needs to be assembled, the Contractor must ensure that the Equipment is assembled on the day of delivery, failing which, the Institution reserves the right to reject the Equipment. Should an Equipment be found incomplete during commissioning, the Contractor must make good the delivery of the short supplied items seven (7) days upon notification by the Institution. 3.7.3 The Contractor shall obtain a receipt from the Institution for every delivery of the Equipment PROVIDED that the issue of such receipt shall not be any representation on the part of the Institution of complete delivery or of delivery in accordance with the Contract or delivery in good order and condition shall not relieve the Contractor from his responsibility to make good the delivery of short supplied items, to replace defective, discrepant or damaged Equipment. 3.7.4 Contractor shall test the Equipment in Singapore and satisfy himself that they are safe, functional and perform in accordance with the manufacturer’s specifications before delivery of the Equipment to the Institution. Such pre-delivery test results shall remain within relevant International Electro-technical Commission (“IEC”) standards and manufacturer’s technical and safety specifications and shall be documented and submitted to the Institution together with the delivery of the Equipment.
Installation, Testing and Commissioning. 5.14.1) Successful Bidder is solely responsible for Installation, Commissioning & testing at MCF-Bhopal. 5.14.2) It is to be noted again that supply, installation and commissioning of the system with all accessories, auxiliaries and any item not covered in the specification but essential for proper execution as per tender shall be included and executed by the successful bidder. 5.14.3) All the equipments shall operate on 230V, 50Hz single–phase power supply. Power for all the equipment will be provided by MCF at one point in each area. If any equipment operates on any voltage other than the indicated supply voltage and supply frequency, necessary conversion/correction device shall be supplied along with the equipment. Power chords for Indian standard 3 pin sockets to be provided with all the equipments. 5.14.4) Successful bidder shall carry out all the installation activities with professional craftsmanship befitting to the office environment. 5.14.5) Required programming for the control system for integrating all the sources, destinations of Audio Video systems shall be carried out as per MCF requirement. 5.14.6) Successful bidder will carry out all the required tests in the presence of MCF team and demonstrate all the functional features of the system. The project will not be deemed complete until the commissioning is carried out successfully by the vendor and the same is verified and agreed by MCF representative.
Installation, Testing and Commissioning. 3.7.1 7KH &RQWUDFWRU ZDUUDQWV WKDW LW VKDOO IXOO\ DFTXD and other requirements shall install the Equipment without any additional charge, as directed by the Institution. The installation, testing and commissioning of the Equipment shall be conducted in accordance with the Requirements Specifications and where necessary, in the presence and to the satisfaction of, Personnel designated by and representing the Institution. Where applicable, the Contractor shall conduct all quality control testing necessary to ensure the level of quality in conformance in all respects to the Requirements Specifications. 3.7.2 Delivery of the Equipment must be complete. Where the Equipment needs to be assembled, the Contractor must ensure that the Equipment is assembled on the day of delivery, failing which, the Institution reserves the right to reject the Equipment. Should an Equipment be found incomplete during commissioning, the Contractor must make good the delivery of the short supplied items seven (7) days upon notification by the Institution. 3.7.3 The Contractor shall obtain a receipt from the Institution for every delivery of the Equipment PROVIDED that the issue of such receipt shall not be any representation on the part of the Institution of complete delivery or of delivery in accordance with this Contract or delivery in good order and condition shall not relieve the Contractor from his responsibility to make good the delivery of short supplied items, to replace defective, discrepant or damaged Equipment. 3.7.4 Contractor shall test the Equipment in Singapore and satisfy himself that they are safe, functional and perform in accordance ZLWK WKH PDQXIDFWXUHU¶V VSHFLILFDWL Equipment to the Institution. Such pre-delivery test results shall remain within relevant International Electro-WHFKQLFDO &RPPLVVLRQ ³,(&´ VWDQGDUGV D safety specifications and shall be documented and submitted to the Institution together with the delivery of the Equipment.
Installation, Testing and Commissioning a) The Interface Detectors shall be delivered to sites by the supplier. b) The installation shall be done by the supplier’s representatives who shall include at least one or more of the manufacturer’s representatives. c) KPC’s sole role in the installation and commissioning shall be supervisory, witnessing the system acceptance test, the basis of which the system shall be accepted by the purchaser. d) The installation/commissioning works shall include but not be limited to:- i.) Conducting interface detector chamber improvement civil works
Installation, Testing and Commissioning. Within 7 working days from the date of delivery.
Installation, Testing and Commissioning. The scope of installation, testing and commissioning for the plant facilities shall include, but not limited, to the following. Installation of PV Modules on Module Mounting Structures and interconnection of PV 50 MW (AC) Solar PV Power Plants at Tamil Nadu Tender No. SECI/C&P/TD/2020/TN/50 SOW Page 8 of 15 Signature of Bidder Modules. Laying of solar cables through HDPE conduits underground / along cable trays from PV Modules to SMU / PCU along with termination at both the ends. Installation, Testing and Commissioning of String Monitoring Units. Laying of DC cables underground / along cable trays from SMU to PCU along with termination at both the ends (in case of central inverter configuration). Installation, Testing and Commissioning of Power Conditioning Units. Installation, Testing and Commissioning of inverter-duty transformers. Installation, Testing and Commissioning of switchgear panels. Laying of 1.1 kV AC cables along underground / cable trays from PCU to inverter-duty transformer along with termination at both the ends. Laying of HT AC cables underground / along cable trays from inverter-duty transformer to switchgear panel along with termination at both the ends. Laying of HT AC cables underground / along cable trays from switchgear panel at Local Control Room / field to switchgear panel at Main Control Room along with termination at both the ends. Installation, Testing and Commissioning of ABT meters with all necessary metering rated CTs and PTs at Main Control Room as per CEA Metering Regulation 2006 as amended time to time and state metering code. Installation, Testing and Commissioning of auxiliary power supply system consisting of auxiliary transformers, AC distribution boards, AC LT cables and related accessories. Installation, Testing and Commissioning of suitable communication system for interfacing SMU, PCU, Transformer, Switchgear panel, ABT meter, UPS, Fire alarm panel, WMS and other plant equipment with SCADA. Installation, Testing and Commissioning of data acquisition system from SPV plant to SLDC along with communication system as required by SLDC. Installation, Testing and Commissioning of Uninterrupted Power Supply (UPS) with battery bank. Earthing of PV Modules, Module Mounting Structures, SMU, PCU, switchgear panels and all other electrical equipment. Installation of lightning protection system for entire plant facilities. Installation of indoor & outdoor illumination system including all required accessories and laying of powe...

Related to Installation, Testing and Commissioning

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards. 2. Grantee agrees to cooperate fully and provide the System Agency and its representatives timely access to Products, records, and other items and information needed to conduct such review, evaluation, testing, and monitoring.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Inspection/Testing In order to assess Supplier’s work quality and/or compliance with this Order, upon reasonable notice by Buyer: (a) all goods, materials and services related to the items purchased hereunder, including, raw materials, components, assemblies, work in process, tools and end products shall be subject to inspection and testing by Buyer, its customer, representative or regulatory authorities at all places, including sites where the goods are made or located or the services are performed, whether at Supplier’s premises or elsewhere; and (b) all of Supplier’s facilities, books and records relating to this Order shall be subject to inspection by Buyer or its designee. If specific Buyer and/or Buyer’s customer tests, inspection and/or witness points are included in this Order, the goods shall not be shipped without an inspector’s release or a written waiver of test/inspection/witness with respect to each such point; however, Buyer shall not be permitted to unreasonably delay shipment; and Supplier shall notify Buyer in writing at least twenty (20) days prior to each of Supplier’s scheduled final and, if applicable, intermediate test/inspection/witness points. Supplier agrees to cooperate with such/audit inspection including, completing and returning questionnaires and making available its knowledgeable representatives. Buyer’s failure to inspect or test goods, materials or services or Buyer’s failure to reject or detect defects by inspection or testing shall not relieve Supplier from its warranty obligations or any of its other obligations or responsibilities under this Order. Supplier agrees to provide small business as well as minority and/or women owned business utilization and demographic data upon request.