Common use of Installation, Testing and Commissioning Clause in Contracts

Installation, Testing and Commissioning. 3.7.1 The Contractor warrants that it shall fully acquaint itself with the Institution’s structural, electrical and other requirements shall install the Equipment without any additional charge, as directed by the Institution. The installation, testing and commissioning of the Equipment shall be conducted in accordance with the Requirements and where necessary, in the presence and to the satisfaction of, Personnel designated by and representing the Institution. Where applicable, the Contractor shall conduct all quality control testing necessary to ensure the level of quality in conformance in all respects to the Requirements. 3.7.2 Delivery of the Equipment must be complete. Where the Equipment needs to be assembled, the Contractor must ensure that the Equipment is assembled on the day of delivery, failing which, the Institution reserves the right to reject the Equipment. Should an Equipment be found incomplete during commissioning, the Contractor must make good the delivery of the short supplied items seven (7) days upon notification by the Institution. 3.7.3 The Contractor shall obtain a receipt from the Institution for every delivery of the Equipment PROVIDED that the issue of such receipt shall not be any representation on the part of the Institution of complete delivery or of delivery in accordance with the Contract or delivery in good order and condition shall not relieve the Contractor from his responsibility to make good the delivery of short supplied items, to replace defective, discrepant or damaged Equipment. 3.7.4 Contractor shall test the Equipment in Singapore and satisfy himself that they are safe, functional and perform in accordance with the manufacturer’s specifications before delivery of the Equipment to the Institution. Such pre-delivery test results shall remain within relevant International Electro-technical Commission (“IEC”) standards and manufacturer’s technical and safety specifications and shall be documented and submitted to the Institution together with the delivery of the Equipment.

Appears in 1 contract

Sources: Lease Agreement

Installation, Testing and Commissioning. 3.7.1 The Contractor warrants that it shall fully acquaint itself with the Institution’s structural, electrical and other requirements shall install the Equipment without any additional charge, as directed by the Institution. The installation, testing and commissioning of the Equipment shall be conducted in accordance with the Requirements Specifications and where necessary, in the presence and to the satisfaction of, Personnel designated by and representing the Institution. Where applicable, the Contractor shall conduct all quality control testing necessary to ensure the level of quality in conformance in all respects to the RequirementsRequirements Specifications. 3.7.2 Delivery of the Equipment must be complete. Where the Equipment needs to be assembled, the Contractor must ensure that the Equipment is assembled on the day of delivery, failing which, the Institution reserves the right to reject the Equipment. Should an Equipment be found incomplete during commissioning, the Contractor must make good the delivery of the short supplied items seven (7) days upon notification by the Institution. 3.7.3 The Contractor shall obtain a receipt from the Institution for every delivery of the Equipment PROVIDED that the issue of such receipt shall not be any representation on the part of the Institution of complete delivery or of delivery in accordance with the this Contract or delivery in good order and condition shall not relieve the Contractor from his responsibility to make good the delivery of short supplied items, to replace defective, discrepant or damaged Equipment. 3.7.4 Contractor shall test the Equipment in Singapore and satisfy himself that they are safe, functional and perform in accordance with the manufacturer’s specifications before delivery of the Equipment to the Institution. Such pre-delivery test results shall remain within relevant International Electro-technical Commission (“IEC”) standards and manufacturer’s technical and safety specifications and shall be documented and submitted to the Institution together with the delivery of the Equipment.and

Appears in 1 contract

Sources: Lease Agreement