In Situ Object Counting System Sample Clauses

In Situ Object Counting System. SRNS shall provide access and support to SRR for use of an In Situ Object Counting System for waste and source term characterization. Support shall include the following: • Maintaining system per manufacturer’s requirements (e.g., annual calibration, computer and software upgrades, support frame, xxxxxxx and collimators, LN2 filling of cryostat, etc.) • Providing training to SRR staffing on operation and modeling software • Providing SME support required in the development and performance of training
AutoNDA by SimpleDocs

Related to In Situ Object Counting System

  • Accounting System Maintain a system of accounting that enables Borrowers to produce financial statements in accordance with GAAP and maintain records pertaining to the Collateral that contain information as from time to time reasonably may be requested by Agent. Borrowers also shall keep an inventory reporting system that shows all additions, sales, claims, returns, and allowances with respect to the Inventory.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Acceptable Accounting System The Contractor shall maintain the acceptable/approved status of their Accounting System and submit updates to the current status

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):

  • Accounting System Requirement The Contractor shall maintain an adequate system of accounting and internal controls that meets Generally Accepted Accounting Principles or “GAAP.”

  • DIRECTORS’ STATEMENT The Board of Directors of Hua-An, having considered all aspect of the Proposed Acquisition, is of the opinion that the execution of the Proposed Acquisition in the best interests of Hua-An.

  • Acceptable Estimating System The Contractor shall maintain the acceptable status of their Estimating System and submit updates to the current status, if applicable

Time is Money Join Law Insider Premium to draft better contracts faster.