Hydraulic Model Development Clause Samples
Hydraulic Model Development. Activities The Subcontractor will create a hydraulic computer model of the City’s piping and pumping facilities. The model will consist of the City's trunk pipelines and pump stations. Model pipe data will be updated from the City's GIS data. The data will be imported into the model and the pipe connectivity for all nodes will be confirmed. The model will include pipes 10-inches in diameter and greater, plus smaller main collector pipelines as needed to reach each basin. Pump stations, wet well dimensions, pump curves and pump controls will be added to the model. The flows will be added to the model geographically by mini-basin for the selected planning periods.
Hydraulic Model Development a. Utilize existing GIS sewer system mapping to define the main conveyance sewers and lift stations to be modeled.
Hydraulic Model Development. The City of Arcata will secure a consultant to develop a two-dimensional hydrodynamic model of the study area (▇▇▇▇▇▇▇▇ Slough to Washington Gulch).
Hydraulic Model Development
