Heating, Ventilating and Air Conditioning. 1. Complete HVAC Systems shall be designed, furnished and installed within the premises by the Tenant. The HVAC systems, calculations, designs and installations shall be as recommended in ASHRAE Publications and the Landlord's Tenant Finish Mechanical Criteria. Tenant's systems and ventilation shall meet all codes and ASHRAE standards. Tenant shall furnish Landlord with complete load calculations including information as to Tenant's lighting load in watt▇ ▇▇▇ Tenant's estimated store population (employees and customers). 2. Tenant's cooling system shall be adequate for cooling the premises to 75 degrees F DB and 50% RH based on the latest ASHRAE guide outdoor design dry bulb and design wet bulb temperatures for the area as tabulated in the 2-1/2% columns, with a rise of not more than 3 degrees F DB during peak periods. 3. Tenant's heating method shall be adequate for heating the premises to 55 degrees F DB during times other than regular business hours based on the latest ASHRAE guide outdoor design temperature for the area as tabulated in the 99% column. The Tenant's heating method shall be independent of the central cooling system. The Tenant's lighting system shall be used to heat the sales area during regular business hours in the heating season. The Tenant's lighting system may be used to maintain the required sales area minimum temperature level during other then regular business hours in the heating season. 4. Tenant's exhaust systems shall provide the required exhaust air capacities and shall be independent of the central cooling system. The Tenant's exhaust systems shall be inoperative during other than regular business hours. Replacement air for the Tenant's exhaust will be provided through the Tenant's air supply system up to the design air supply quantity. Any additional replacement air required will be drawn from the mall. Independent air make-up air systems shall not be installed by the Tenant. 5. Tenant's HVAC systems shall be complete with air distribution systems, ventilating systems, control systems, insulation and all other components required to make a complete system. Tenant's systems shall be specifically designed to coordinate with variable air volume cooling temperature control. Tenant's HVAC system components shall be installed in locations as designated by the Landlord. 6. Tenant shall provide and install fire dampers, in accordance with all codes, in the right hand side (as viewed when facing the rear of the Premises) demising partition of its Premises if its Premises adjoin another tenant space. Tenant shall also provide and install fire dampers where the Tenant's ductwork passes through service corridor walls or other fire separations. Tenant's installation shall include complete access and access panels to all valves, dampers and similar service devices (including the Landlord's) required for testing, balancing and servicing. Tenant shall utilize only fire damper products as specified by the Tenant Handbook. 7. Tenant shall connect to Landlord's central cooling system and shall use Landlord's Design Criteria in designing systems and controls. Alterations to the Landlord's central system required due to Tenant's design shall be done by Landlord at Tenant's sole expense. 8. If directed to do so by Landlord, Tenant shall paint and/or screen from ground level view by parapet walls or other appropriate screening, all of Tenant's outdoor equipment. Any such painting or screening must be done at Tenant's sole expense and approved in advance by Landlord.
Appears in 2 contracts
Sources: Lease (Silicon Entertainment Inc /Ca/), Lease (Silicon Entertainment Inc /Ca/)
Heating, Ventilating and Air Conditioning. 1. Complete HVAC Systems shall be designed, furnished and installed within the premises by the Tenant. The HVAC systems, calculations, designs and installations shall be as recommended in ASHRAE Publications and the Landlord's Tenant Finish Mechanical Criteria. Tenant's systems and ventilation shall meet all codes and ASHRAE standards. Tenant shall furnish Landlord with complete load calculations including information as to Tenant's lighting load in watt▇ ▇▇▇ Tenant's estimated store population (employees and customers).
2. Tenant's cooling system shall be adequate for cooling the premises to 75 degrees F Fahrenheit DB and 50% RH based on the latest ASHRAE guide outdoor design dry bulb and design wet bulb temperatures for the area as tabulated in the 2-1/2% columns, with a rise of not more than 3 degrees F Fahrenheit DB during peak periods.
3. Tenant's heating method shall be adequate for heating the premises to 55 degrees F Fahrenheit DB during times other than regular business hours based on the latest ASHRAE guide outdoor design temperature for the area as tabulated in the 99% column. The Tenant's heating method shall be independent of the central cooling system. The Tenant's lighting system shall be used to heat the sales area during regular business hours in the heating season. The Tenant's lighting system may be used to maintain the required sales area minimum temperature level during other then regular business hours in the heating season.
4. Tenant's exhaust systems shall provide the required exhaust air capacities and shall be independent of the central cooling system. The Tenant's exhaust systems shall be inoperative during other than regular business hours. Replacement air for the Tenant's exhaust will be provided through the Tenant's air supply system up to the design air supply quantity. Any additional replacement air required will be drawn from the mall. Independent air make-up air systems shall not be installed by the Tenant.
5. Tenant's HVAC systems shall be complete with air distribution systems, ventilating systems, control systems, insulation and all other components required to make a complete system. Tenant's systems shall be specifically designed to coordinate with variable air volume cooling temperature control. Tenant's HVAC system components shall be installed in locations as designated by the Landlord.
6. Tenant shall provide and install fire dampers, in accordance with all codes, in the right hand side (as viewed when facing the rear of the Premises) demising partition of its Premises if its Premises adjoin another tenant space. Tenant shall also provide and install fire dampers where the Tenant's ductwork passes through service corridor walls or other fire separations. Tenant's installation shall include complete access and access panels to all valves, dampers and similar service devices (including the Landlord's) required for testing, balancing and servicing. Tenant shall utilize only fire damper products as specified by the Tenant Handbook.
7. Tenant shall connect to Landlord's central cooling system and shall use Landlord's Design Criteria in designing systems and controls. Alterations to the Landlord's central system required due to Tenant's design shall be done by Landlord at Tenant's sole expense.
8. If directed to do so by Landlord, Tenant shall paint and/or screen from ground level view by parapet walls or other appropriate screening, all of Tenant's outdoor equipment. Any such painting or screening must be done at Tenant's sole expense and approved in advance by Landlord.
Appears in 1 contract
Sources: Lease (Hotel Discovery Inc)
Heating, Ventilating and Air Conditioning. 1. Complete A complete HVAC Systems shall be designed, furnished and installed within the premises Premises by the Tenant. The HVAC systems, calculations, designs and installations shall be as recommended in ASHRAE Publications and the Landlord's Tenant Finish Mechanical Design Criteria. Tenant's systems and ventilation shall meet all applicable codes and ASHRAE standards. Tenant shall furnish Landlord with complete load calculations including information as to Tenant's lighting load in watt▇ ▇▇▇ Tenant's estimated store population (employees and customers).
2. Tenant's cooling system shall be adequate for cooling the premises Premises to 75 degrees F DB and 50% RH based on the latest ASHRAE guide outdoor design dry bulb and design wet bulb temperatures for the area as tabulated in the 2-1/2% columns, with a rise of not more than 3 degrees F DB during peak periods.
3. Tenant's heating method shall be adequate for heating the premises Premises to 55 degrees F DB during times other than regular business hours based on the latest ASHRAE guide outdoor design temperature for the area as tabulated in the 99% column. The Tenant's heating method shall be independent of the central cooling system. The Tenant's lighting system shall be used to heat the sales area during regular business hours in the heating season. The Tenant's lighting system may be used to maintain the required sales area minimum temperature level during other then regular business hours in the heating season.
4. Tenant's exhaust systems shall provide the required exhaust air capacities and shall be independent of the central cooling system. The Tenant's exhaust systems shall be inoperative during other than regular business hours. Replacement air for the Tenant's exhaust will be provided through the Tenant's air supply system up to the design air supply quantity. Any additional replacement air required will be drawn from the mallEnclosed Mall. Independent air make-up air systems shall not be installed by the Tenant.
5. Tenant's HVAC systems shall be complete with air distribution systems, ventilating systems, control systems, insulation and all other components required to make a complete system. Tenant's systems shall be specifically designed to coordinate with variable air volume cooling temperature control. [CONFIDENTIAL] Tenant's HVAC system components shall be installed in locations as designated by the Landlord.
6. Tenant shall provide and install fire dampers, dampers in accordance with all applicable codes, in the right hand side (as viewed when facing the rear of the Premises) demising partition of its Premises if its Premises adjoin another tenant space. Tenant shall also provide and install fire dampers where the Tenant's ductwork passes through service corridor walls or walls, Tenant shall provide other fire separationsseparations in demising partitions, if required by any applicable codes. Tenant's installation Tenant shall include complete provide access and by means of an access panels panel to all valves, dampers and similar service devices (including the Landlord's) required for testing, balancing and servicing. Tenant shall utilize only fire damper products as specified by the Tenant Handbook.
7. Tenant shall connect to Landlord's central cooling system and shall use Landlord's Design Criteria in designing systems and controls. Alterations to the Landlord's central system required due to Tenant's design shall be done by Landlord at Tenant's sole expense.
8. If directed to do so by Landlord, Tenant shall paint and/or screen from ground level view by parapet walls or other appropriate screening, all of Tenant's outdoor equipment. Any such painting or screening must be done at Tenant's sole expense and approved in advance by Landlord.
9. If Landlord so desires, Landlord will design, provide and install within the premises or other location designated by Landlord, the necessary equipment to adequately heat and air condition the premises for Tenant's normal requirements. Tenant will reimburse Landlord for its costs in amortizing, operating and maintaining the heating and air conditioning system. Landlord may, at its option, install a central system and/or a Total Energy System.
Appears in 1 contract
Sources: Lease (Success Bancshares Inc)