Heat Pump Sample Clauses

Heat Pump. The cost of repair necessary to remedy a Failure of your Heat Pump, including costs for the following standard parts: defrost control, defrost sensors, contactor, high-pressure and low-pressure switches, and the parts protected for under the Air Conditioner section of this Agreement. “
AutoNDA by SimpleDocs
Heat Pump. What type of Heat Pump is covered? An electric central heat pump (“Heat Pump”). What is covered? Repair or replacement of the broken or failed backup heating coils, blower bearings, blower belts, blower motors, blower pulleys, blower wheels, capacitors, circuit boards, condenser fan blades, condenser fan motors, condensate pumps, contactors, external crankcase heaters, defrost controls, electric circuits, electrical low voltages, elements, internal condenser wiring, outdoor unit relays, rain xxxxxxx, refrigerant, locating refrigerant leaks, relays, solenoids, standard thermostats, standard thermostat sub-bases, external thermal fuses, timers, and transformers. What is a Heat Pump Inspection and Safety Check? • 1 Inspection and Safety Check per Term for Your Heat Pump. Your Heat Pump must be performing its fundamental operation(s) in normal service for all points of the Inspection and Safety Check to be provided. • A Heat Pump Inspection and Safety Check includes only the following: • Check: thermostat operation, system temperature split, voltage and amperage to all motors. • Inspect: disconnect, fuses, wiring, contactors, relays, pressure controls, electrical safety circuits, indoor blower and motor for dirt build up, bearings, condensate drain, outdoor coil, duct seal at unit and secure panels. • Clean (if necessary): condensate line, outdoor coil and air filter. • Lubricate (if necessary): fan and motor units. • Run and test system. • Heat Pump Inspection and Safety Checks will be performed between January 1st and October 15th. What is a Heat Pump Cleaning and Maintenance? • 1 Cleaning and Maintenance per Term for Your /Heat Pump. Your Heat Pump must be performing its fundamental operation(s) in normal service for all points of the Cleaning and Maintenance to be provided. • A Heat Pump Cleaning and Maintenance includes only the following: • Check: thermostat operation, system temperature split, voltage and amperage to all motors. • Inspect: disconnect, fuses, wiring, contactors, relays, pressure controls, electrical safety circuits, indoor blower and motor for dirt build up, bearings, condensate drain, outdoor coil, duct seal at unit and secure panels. • Clean (if necessary): condensate line, outdoor coil and air filter. • Lubricate (if necessary): fan and motor units. • Run and test system. • Heat Pump Cleaning and Maintenances will be performed between January 1st and October 15th. What will happen if We cannot repair Your Heat Pump? • If We determine ...
Heat Pump. In additional to the definitions (covered under “Overall Definitions”) the following specific parameters also apply to define the termStandard installation”: • the existing hot water system is an electric storage hot water storage system (and not a heat pump) located outside your home; • the Goods will be located in the same location as your existing hot water system.
Heat Pump. See Heating, Air Conditioning (Ducted), and Ductwork Heating, Air Conditioning (Ducted), And Ductwork What is Protected? • Two gas, electric or propane furnaces, or boilers. • Motors, gas valve, printed circuit boards, heat pump, heat exchangers, and burners. • Thermostats (limited to $250) and thermostat sub-base. • Hydronic circulating pumps, radiators, heating elements, and vent blower assembly. • Switches, wiring and relays, baseboard convectors, and vents. • Refrigeration system (includes heat pump). • Condensing unit. • Thermostats, compressor, motors, refrigerant lines, coils, and liquid and suction line dryers. • Fuses, breakers, disconnect boxes, and wiring. • Valves (including thermostatic expansion valves). • Air handling unit, evaporative cooler, pump, casing, motor, belts, and pulleys. • Float-assembly. • Ductwork from heating unit to the connection at register or grill. IGS will pay up to $500 in the aggregate during your Protection Period for diagnosis, access, repair, or replacement of ductwork located in walls, floors, or ceilings. All such expenses will be subtracted from the applicable limits of protection. Items Not Protected and Additional Limitations • Auxiliary space heaters. • Cleaning of any type, balancing of system, or adjusting for temperature variation by room. • Fuel oil heating systems, fuel storage tanks, or heat lamps. • Baseboard casings or grills. • Chimneys. • Geo-thermal or water source systems, or any parts or components of either. • Cable heat (in ceiling or floor) or wood stoves, even if the main source of heat to home. • Installation of flue liners to meet local codes resulting from furnace replacements, inadequate capacity, or undersized systems. • A furnace or boiler rated at 400,000 BTU/hour or more. A heat pump rated at 400,000 BTU/hour or more. Any system exceeding five tons capacity. Natural gas powered cooling equipment. • Geothermal heat pumps. • Bleeding air bound systems. • Draining or refilling of boiler. • Condenser casings. • Registers, grills, or filters (including electronic air cleaner). • Mini-split ductless systems (including heat pump versions). • Window units. • Built in electrical wall units. • Humidifiers, cooler pads, roof jacks, or stands. • Condensate line cleaning or condensate pumps. • Inadequate capacity or undersized systems. • Insulation or dampers. • Ductwork where asbestos is present. • Installation of new runs to compensate for existing deficiencies. • Any rooftop, through-the-wall, ...
Heat Pump. See Heating, Air Conditioning (Ducted), and Ductwork Heating, Air Conditioning (Ducted), And Ductwork What is Protected?
Heat Pump. What is a Covered Repair? Repair or replacement of the following for which You have sole responsibility, that is damaged due to normal wear and tear: • The broken or failed capacitors, circuit boards, internal fuses, breakers, condensate pumps, condenser motor, condenser fan, contactor switches, delay timer, fan controls, fan relays, filter dryer, high and low pressure switches, limit controls; refrigerant, relays, defrost controls, defrost sensors, transformers, and valves, that are part of Your Home’s electric central Heat Pump. What is the maximum amount We will pay for Covered Repairs? • Up to $2,000 per Term (“Benefit Limit”). • Multiple Service Calls up to the Benefit Limit. See “What is a Service Call?” below. What will happen if We cannot repair Your Heat Pump? • If parts are unavailable or obsolete or We deem Your Heat Pump beyond repair, We will provide a pro-rata refund, less any claims paid by Us.
Heat Pump. These devices increase the effectiveness of energy conversion from electricity to heat by pumping heat out of the surrounding environment against the normal gradient (heat usually diffuses from hot to cold). In doing so they are able to provide a higher heat output per unit power than conventional resistive loads. This increased heat output is described by a quantity known as the coefficient of performance (CoP), the ratio of the heat power output to the electric power input. E.g. for a 5kW heat pump with a COP of 2 would be able to provide the equivalent heat output as 10kW of conventional resistive heating. Model Daikin Altherma high temperature air-to-water heat pump Charging power Typically around 5 kW Discharge power Around 10 kW depending on conditions Energy storage capacity NA Energy output form NA Dynamics Coefficient of performance for heating is dependent of outside temperatures. The colder the outside the lower the CoP. Cannot store energy on its own.
AutoNDA by SimpleDocs
Heat Pump. See Heating, Air Conditioning (Ducted), and Ductwork Heating, Air Conditioning (Ducted), And Ductwork What is Protected? • ”Furnace or Boiler” means a single, standard residential, whole house propane, natural gas, or electric heating unit within your home. • Motors, gas valve, printed circuit boards, heat pump, heat exchangers, and burners.

Related to Heat Pump

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Fueling delivering or dispensing fuel, defueling and refueling, or any other transfer of fuel on Airport property.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts. An adequately sized 3 phase “wye” wound step down transformer shall be provided to supply 208/120-volt, 3 phase power, for lighting, general service receptacles and dedicated computer based office equipment. Dedicated, isolated ground circuits shall be supplied from separate isolated ground power distribution panel(s). Lighting circuits shall be supplied from separate lighting panel(s). Panels shall have 20% spare capacity and be complete with 10% spare breakers of each size, but no less than 1 spare. No more than 4 duplex receptacles shall be connected to any single 20-amp dedicated isolated ground circuit or general service circuit.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

Time is Money Join Law Insider Premium to draft better contracts faster.