GROUPING OF SUBMITTALS Sample Clauses

GROUPING OF SUBMITTALS. A. Unless otherwise specified, make submittals in groups containing all associated items to assure that information is available for checking each item when it is received. Partial submittals may be rejected as not complying with the provisions of the Contract. The Contractor may be held liable for delays so occasioned.
AutoNDA by SimpleDocs

Related to GROUPING OF SUBMITTALS

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • Timing of Submission of Documents No Proceed Order shall be issued until the Owner has received, in good and proper order, the following documents. The documents shall be submitted in accordance with the following schedule:

  • Required Submittals Complete shop drawings and manufacturer’s catalog data shall be submitted to the State and approved by the State prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the systems furnishings) shall be designated on a block floor plan showing the systems furnishings layout provided by the State. Said block floor plan shall be furnished by the State to the Owner/Lessor no later than 4 weeks after approved construction plans are received by the State.

  • Posting of Shift Schedules (a) Shift and standby schedules shall be posted at least four (4) weeks in advance of the schedule to be worked and the schedule shall be for a minimum of two (2) weeks. The Employer shall make every reasonable effort not to change shifts. If the Employer changes the shift schedule within forty-eight (48) hours of the shift, the Employee(s) affected shall be entitled to overtime compensation for that shift. The Employer must inform Employees of the shift changes made to the posted schedules.

  • Office of Supplier Diversity The State of Florida supports its diverse business community by creating opportunities for woman-, veteran-, and minority-owned small business enterprises to participate in procurements and contracts. The Department encourages supplier diversity through certification of woman-, veteran-, and minority-owned small business enterprises and provides advocacy, outreach, and networking through regional business events. For additional information, please contact the Office of Supplier Diversity (OSD) at xxxxxxx@xxx.xxxxxxxxx.xxx.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Posting of Schedules The Employer shall post the weekly work schedule for all employees not later than Monday 6:00 p.m. and twenty-two (22) days in advance. An employee's schedule may be changed without notice in the event of absence of other staff due to sickness or accident or in the event of emergencies. In all other cases, at least twenty-four (24) hours' notice of any change must be given or four (4) additional hours' pay given in lieu of notice. All requests for time off for special personal events to be made to Management for their approval prior to the posting of the schedule, and will be granted wherever possible. It is understood that this clause does not apply to casual employees. There shall be a daily starting time for each employee. Daily hours of work for full time employees shall be consecutive, with the exception of meal periods.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Selection of Subcontractors Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • REPORT SUBMISSION 1. Copies of reporting packages for audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit Requirements, and required by PART I of this form shall be submitted, when required by 2 CFR 200.512, by or on behalf of the recipient directly to the Federal Audit Clearinghouse (FAC) as provided in 2 CFR 200.36 and 200.512

Time is Money Join Law Insider Premium to draft better contracts faster.