Erosion and Sediment Controls Sample Clauses

Erosion and Sediment Controls. The Electric Line project shall comply with the requirements of this AIMA and the NPDES Permit for Construction Activities, if applicable to the Project. This includes the timeframe for the installation of erosion and sediment control BMPs. The Company shall install erosion and sediment control BMPs to manage and reduce the risk of erosion and sediment transport within the ROW and downslope from the ROW as a result of construction activities. BMPs shall be at least as protective as the requirements contained in the Illinois Urban Manual and the Project’s Stormwater Pollution Prevention Plan, if applicable. BMPs shall be maintained, as necessary, to keep them in effective operating condition throughout the life of the Project. Temporary sediment control BMPs may be removed once the upslope has achieved Final Restoration (see Definitions). Permanent erosion controls shall be installed to revegetate pasture lands and areas enrolled in conservation practices, and to vegetate previously forested areas. On cropland in the ROW, factors such as soil type, steepness and length of slope, level of disturbance and compaction, adjacent tillage practices, and proximity to sensitive areas such as streams or wetlands will determine the area’s risk of erosion and therefore will also determine the temporary erosion controls that are needed on the ROW to reduce the risk of erosion, until the cropland can be planted again. The Company and Landowner shall consult with the local SWCD in the event that an agreement regarding a reasonable method to control erosion on the Landowner's ROW cannot be achieved.
AutoNDA by SimpleDocs
Erosion and Sediment Controls. Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to:
Erosion and Sediment Controls. An erosion and sediment control plan shall identify appropriate control measures for each major stage of construction.

Related to Erosion and Sediment Controls

  • Access Controls a. Authorized Access - DST shall have controls that are designed to maintain the logical separation such that access to systems hosting Fund Data and/or being used to provide services to Fund will uniquely identify each individual requiring access, grant access only to authorized personnel based on the principle of least privileges, and prevent unauthorized access to Fund Data.

  • Agreement Controls In the event that any term of any of the Loan Documents other than this Agreement conflicts with any express term of this Agreement, the terms and provisions of this Agreement shall control to the extent of such conflict.

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

  • Audit Controls P. Contractor agrees to an annual system security review by the County to assure that systems processing and/or storing Medi-Cal PII are secure. This includes audits and keeping records for a period of at least three (3) years. A routine procedure for system review to catch unauthorized access to Medi-Cal PII shall be established by the Contractor.

  • Plan Document Controls The rights granted under this Agreement are in all respects subject to the provisions set forth in the Plan to the same extent and with the same effect as if set forth fully in this Agreement. If the terms of this Agreement conflict with the terms of the Plan document, the Plan document will control.

  • Safeguards Monitoring and Reporting 8. The Borrower shall do the following or cause the Project Executing Agency to do the following:

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Technical Security Controls 35 a. Workstation/Laptop encryption. All workstations and laptops that store PHI COUNTY 36 discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of 37 COUNTY either directly or temporarily must be encrypted using a FIPS 140-2 certified algorithm which 1 is 128bit or higher, such as AES. The encryption solution must be full disk unless approved by the 2 COUNTY.

  • TIA Controls If any provision of this Indenture limits, qualifies, or conflicts with another provision which is required to be included in this Indenture by the TIA, the required provision shall control.

Time is Money Join Law Insider Premium to draft better contracts faster.