Emergency - Instructional Sample Clauses

Emergency - Instructional. Non-Bargaining Unit personnel shall not do work normally performed by the Bargaining Unit. This does not prevent such non-Bargaining Unit personnel from performing necessary functions such as operating equipment or processes in emergencies or from instructing employees.
AutoNDA by SimpleDocs

Related to Emergency - Instructional

  • Emergency Access Landlord shall have the right to enter the Premises at any time without notice in the event of an emergency.

  • Emergency Operator Access Registry Operator shall provide bulk access to the zone files for the TLD to the Emergency Operators designated by ICANN on a continuous basis in the manner ICANN may reasonably specify from time to time.

  • Emergency Work Employees who are required to report for emergency work on non- workdays, or outside of their regular hours of work on a scheduled workday or on holidays which they are entitled to have off, shall be paid overtime compensation for the actual work time and for travel time in connection therewith, but such travel time shall not exceed one-half (1/2) hour.

  • Emergency Repairs a) The landlord must post and maintain in a conspicuous place on the residential property, or give to the tenant in writing, the name and telephone number of the designated contact person for emergency repairs.

  • Emergency Overtime In the event of an emergency as defined in Section 13.15 notwithstanding the terms of this Article, the Agency Head or designee may assign someone to temporarily meet the emergency requirements, regardless of the overtime distribution.

  • Emergency Situation In the event of an emergency situation beyond our reasonable control, such as an "act of God," war, fire, or natural disaster, services involving your account could be available only in a modified or reduced form or could be entirely unavailable. Unless expressly prohibited by applicable law, you agree that we will have no liability to you for such modification, reduction, or unavailability of services caused by an emergency situation.

  • Emergency Situations If the condition is an emergency, this will be communicated to the Contractor with the request that corrections are to be accomplished immediately. The Contractor shall respond to the notice in emergency situations within twenty-four hours. If the Contractor fails to respond within this time limit, the Owner may correct the defect and charge the Contractor for the Work. If it is determined the complaint is not the responsibility of the Contractor, the Contractor shall be promptly paid for the cost of the corrective work. The Contractor shall give notice in writing to the Owner when corrections have been completed.

  • Emergency Generator (a) Tenant, subject to Landlord’s review and approval of Txxxxx’s plans therefor, shall have the right to install a supplemental generator (the “Generator” which term shall include associated power and fuel lines), to provide emergency additional electrical capacity to the Premises during the Term, in an electrical capacity to be reasonably approved by Landlord. Tenant’s plans for the Generator shall include a secondary containment system to protect against and contain any release of hazardous materials. The Generator shall be placed in an area (the “Generator Area”) measuring approximately 20’ x 20’ to be designated by Landlord on the roof and, with respect to such associated power and fuel lines, in such conduits or other areas as Landlord shall designate. Notwithstanding the foregoing, Txxxxx’s right to install the Generator shall be subject to Landlord’s approval of the manner in which the Generator is installed, the manner in which any fuel pipe is installed, the manner in which any ventilation and exhaust systems are installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator, including, without limitation, any necessary 2 hour rated enclosures or sound installation. Landlord shall have the right to require an acceptable enclosure to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the Building and the Property. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory approvals and for the cost of installing, operating, maintaining and removing the Generator. Tenant shall not install or operate the Generator until Tenant has obtained and submitted to Landlord copies of all required governmental permits, licenses and authorizations necessary for the installation and operation of the Generator. In addition to, and without limiting Tenant’s obligations under the Lease, Tenant shall comply with all applicable environmental and fire prevention Laws pertaining to Tenant’s use of the Generator Area. Tenant shall also be responsible for the cost of all utilities consumed in the operation of the Generator.

  • Construction Administration Phase Delete the following paragraph if Submittal Exchange isn’t going to be used: 2.2.2.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

Time is Money Join Law Insider Premium to draft better contracts faster.