Drafting the Preliminary Design Sample Clauses

Drafting the Preliminary Design. The LCRA shall begin to prepare the preliminary design for the LCRA Transmission Facilities during the Study Period. The Preliminary Design shall include the proposed design (thirty percent (30%) design level), a proposed budget of costs of construction, and operation, and a scope of work. The Preliminary Design shall not contain such details as construction documents and engineering plans. SAWS shall establish preliminary specifications and promulgate design standards for the LCRA Transmission Facilities in order that they will be compatible with SAWS Transmission Facilities. The Parties intend, unless otherwise agreed to in writing between them, that the Transmission Facilities in LCRA’s Service Area (“LCRA Transmission Facilities”) will be designed to common specifications with the Transmission Facilities in SAWS’ Service Area (“SAWS Transmission Facilities”) which shall deliver water from the Delivery Point(s) to SAWS’ system and customer. The LCRA Transmission Facilities shall consist of the water transmission lines and pumping facilities designed to transport water from any Off-Channel Reservoir directly to the Delivery Point(s). In no event shall the LCRA Transmission Facilities include any facilities, pumps, water lines or other water transportation facilities designed to transport water from the Colorado River to any Off-Channel Reservoir or from any Off-Channel Reservoir to the Colorado River.
AutoNDA by SimpleDocs

Related to Drafting the Preliminary Design

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Preliminary Hearing (1) If an employee is suspended without pay pending a hearing on disposition of charges for removal, the president or the president's designated representative shall notify the employee in writing of the reasons for the suspension at the time of the notice of the suspension.

  • The Change Order The Change Order is the instrument by which adjustments in the Contract Sum and the Contract Time are effected. The Change Order shall be accompanied by a breakdown as set forth in Paragraph 3.2.7.4. The breakdown is for the purpose of enabling the Design Professional and the Owner to make a judgment on the dollar amount of the adjustment in the Contract Sum and is not a part of the Change Order. No condition, term, qualification, limitation, exception, exemption, modification, or proviso, except as set forth in this Part, shall appear in the breakdown. Only such conditions, terms, qualifications, limitations, exceptions, exemptions, modifications, and provisos as are permitted under this Part are valid. The Design Professional shall certify to the dollar amount and description of the adjustments permitted by the Change Order.

  • Study Design This includes a discussion of the evaluation design employed including research questions and hypotheses; type of study design; impacted populations and stakeholders; data sources; and data collection; analysis techniques, including controls or adjustments for differences in comparison groups, controls for other interventions in the State and any sensitivity analyses, and limitations of the study.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • LITIGATION STATEMENT CHECK ONE [ ] The undersigned bidder has had no litigation and/or judgments entered against it by any local, state or federal entity and has had no litigation and/or judgments entered against such entities during the past ten (10) years. [ ] The undersigned bidder, BY ATTACHMENT TO THIS FORM, submits a summary and disposition of individual cases of litigation and/or judgments entered by or against any local, state or federal entity, by any state or federal court, during the past ten (10) years. COMPANY NAME AUTHORIZED SIGNATURE NAME (PRINT OR TYPE) TITLE Failure to check the appropriate blocks above may result in disqualification of your bid. Likewise, failure to provide documentation of a possible conflict of interest, or a summary of past litigation and/or judgments, may result in disqualification of your bid. E VERIFICATION CERTIFICATION Contract No.Y20-1058-MV I hereby certify that I will utilize the U.S. Department of Homeland Security’s E-Verify system in accordance with the terms governing the use of the system to confirm the employment eligibility of the individuals classified below. In accordance with s. 837.06, Florida Statutes, I understand and acknowledge that whoever knowingly makes a false statement in writing with the intent to mislead a public servant in the performance of his or her official duties shall be guilty of a misdemeanor in the second degree, punishable as provided in s. 775.082 or s. 775.083, Florida statutes. All persons, including subcontractors and their workforce, who will perform work under Contract No.Y20-1058-MV, Heavy Equipment Parts and Labor, within the state of Florida. NAME OF CONTRACTOR: ADDRESS OF CONTRACTOR: AUTHORIZED SIGNATURE: TITLE: DATE: RELATIONSHIP DISCLOSURE FORM FOR USE WITH PROCUREMENT ITEMS, EXCEPT THOSE WHERE THE COUNTY IS THE PRINCIPAL OR PRIMARY BIDDER For procurement items that will come before the Board of County Commissioners for final approval, this form shall be completed by the Bidder and shall be submitted to the Procurement Division by the Bidder. In the event any information provided on this form should change, the Bidder must file an amended form on or before the date the item is considered by the appropriate board or body. Part I INFORMATION ON BIDDER: Legal Name of Bidder: Business Address (Street/P.O. Box, City and Zip Code): Business Phone: ( ) Facsimile: ( ) INFORMATION ON XXXXXX’S AUTHORIZED AGENT, IF APPLICABLE: (Agent Authorization Form also required to be attached) Name of Bidder’s Authorized Agent: Business Address (Street/P.O. Box, City and Zip Code): Business Phone: ( ) Facsimile: ( ) Part II IS THE BIDDER A RELATIVE OF THE MAYOR OR ANY MEMBER OF THE BCC? YES NO IS THE MAYOR OR ANY MEMBER OF THE BCC THE BIDDER’S EMPLOYEE? YES NO IS THE BIDDER OR ANY PERSON WITH A DIRECT BENEFICIAL INTEREST IN THE OUTCOME OF THIS MATTER A BUSINESS ASSOCIATE OF THE MAYOR OR ANY MEMBER OF THE BCC? YES NO If you responded “YES” to any of the above questions, please state with whom and explain the relationship. (Use additional sheets of paper if necessary) Part III

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • No Drafting Presumption The Parties acknowledge that their respective legal advisors have reviewed and participated in settling the terms of this Agreement and agree that any rule of construction to the effect that any ambiguity is to be resolved against the drafting Party shall not apply to the interpretation of this Agreement.