Documentation of the Exterior Condition of the Facades Sample Clauses

Documentation of the Exterior Condition of the Facades. For the purpose of this Easement, the owner or his designee has depicted the exterior Facades in an original set of photographs dated thirty (30) days prior to the date of the execution of this Easement (collectively, the “Photographs”) and filed in the office of the City of Scottsdale Preservation Division, or designated successor. The exterior condition and appearance of the Facades as depicted in the Photographs is deemed to describe their external nature as of the date hereof.
AutoNDA by SimpleDocs

Related to Documentation of the Exterior Condition of the Facades

  • SUPERIOR CONDITIONS 21.01 All existing benefits, rights, privileges, practices, terms or conditions of employment which may be considered to be superior to those contained herein and which are set out in Appendix 4 are specifically retained by this Agreement unless otherwise agreed by the local parties. The parties agree to remove from Appendix 4 those superior conditions which no longer have application. Where the parties cannot agree on whether a superior condition continues to have application, the issue will be reduced to a grievance and referred to arbitration.

  • CONSTRUCTION OF THE BUS TERMINAL 12.1 Obligations prior to commencement of construction Prior to commencement of Construction Works, the Concessionaire shall:

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • BASIC CONDITIONS The State shall have no obligation to disburse money for the Project under this Grant Agreement until the Grantee has satisfied the following conditions:

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Satisfaction of Conditions The conditions precedent set out in Section 6.1, Section 6.2 and Section 6.3 shall be conclusively deemed to have been satisfied, waived or released at the Effective Time.

  • Conditions Affecting the Work The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and location of the Work, and the general and local conditions, which can affect the Work or the cost thereof for any Job Order. Any failure by the Contractor to do so will not relieve him from responsibility for successfully performing the Work without additional expense to the County. The County assumes no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of this Contract, unless such understanding or representations by the County are expressly stated in the Contract.

  • Conditions Affecting Work The Contractor shall be responsible for taking all steps reasonably necessary to ascertain the nature and location of the work to be performed under this Contract and to know the general conditions which can affect the work or the cost thereof. Any failure by the Contractor to do so will not relieve Contractor from responsibility for successfully performing the work without additional cost to the County. The County assumes no responsibility for any understanding or representations concerning the nature, location(s) or general conditions made by any of its officers or agents prior to the execution of this Contract, unless such understanding or representations by the County are expressly stated in the Contract.

  • SUSPENSION OF THE WORK 1. The State, at any time, may suspend all or any part of the services of the Engineer. In such event, the Engineer shall be given notice of such suspension in writing by registered or certified mail to the Engineer's address as furnished to the State for purposes of receiving notices under this contract, by email to the Engineer’s email address as furnished to the State for the purpose of notices, by facsimile transmission telecopy (fax) to the Engineer’s fax number as furnished to the State for the purpose of notices, or by hand delivery.

Time is Money Join Law Insider Premium to draft better contracts faster.